Download presentation
Presentation is loading. Please wait.
Published byFelicia Barrett Modified over 9 years ago
1
National Grant Partnership June 9, 2009
2
2 FY 08FY 09% Diff Applications Received133,400216,89963% AORs118,466177,17350% Contact Center138,615195,97641% Participation Update Statistics thru May
3
3 April 27 Closings Record Activity Over 30K submissions processed in 8 days –Created backlog for application validations during week of April 27 –48 hr Validation service level not met, except for System-to-System (S2S) System change implemented May 1 to speed validations –All backlogged applications validated May 2 –48 hr validation service level being met –Expect far better balance of receipt and validation during future peaks
4
4 April 18 – 19 Build Recap Improved communication of user profile changes throughout the system Increased speed of user log-in-authentications Implemented “Track my Application” new functionality –Applicants can enter up to 5 Grant Tracking #s without login to the system –Applicants must login to view all submitted applications
5
5 May 30 – 31 Build Recap Major increase in log-in authentication speed Cosmetic changes to Apply pages to enhance usability Special character error message now sent when applicants use a special character in the filename for an attachment –Previous message was “Virus Detect” Grantors –Virus scan when posting opportunities –System reports run much quicker
6
6 Next Build June 27 - 28 System will be unavailable Applicants and E-biz PoC functionality to check submission manifest in Check Application Status Applicant & Grantor Registration - Edit & Confirm page Remove 2006 System Dependencies Include AOR contact information in AOR requests going to E- biz POC via email Add Applicant Login to left navigation bar –Move AOR status field to the main page on the Applicant Center
7
7 “Boost” Initiative Elements Increase system capacity and stability –Additional hardware –Increased system monitoring Increased quality assurance of changes to improve the system
8
8 System-to-System (S2S) Benefits Eliminate the burden of redundant or disparate electronic and paper-based data Collection requirements by capturing grant applications in XML format Simplify and standardize data definitions and application forms via XML Schema Protect the confidentiality, availability, and integrity of data via certificate Standardize the collection of financial and progress report data in support of audit and performance measurement activities Improve direct feed into the back office system –Facilitates workflow Integration with Grants Management Systems –Eliminates human data entry errors –Provides ability to integrate with existing workflow processes –Provides better management and reporting capabilities
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.