Download presentation
Presentation is loading. Please wait.
Published byDerrick Newton Modified over 9 years ago
1
EUFORIA FP7-INFRASTRUCTURES-2007-1, Grant 211804 JRA3, SA1, SA2 & SA3 parallel session 23 January 2008 Kick-Off Meeting 21-24 January 2008 Goteborg (Sweden)
2
EUFORIA FP7-INFRASTRUCTURES-2007-1, Grant 211804 Summary Architecture: several issues 1st issue: Portal Integrate Kepler and all the ITM applications in Migrating Desktop Migrating Desktop is running on the user’s desktop => Kepler and the others are running on the user infrastructure => must be launched as a batch on the gateway Non java applications (Matlab, IDL, …) must be launched through VNC (performance??) MD could run interactive jobs (2 ssh channels) but not available for the Kepler part running on the “gateway” => loose the benefits from MD If not used, a web portal must be developed Actions: Must be investigated more deeply (1 month) Distribute the “ITM Web portal requirements” document
3
EUFORIA FP7-INFRASTRUCTURES-2007-1, Grant 211804 Summary Architecture: several issues 2nd issue: Data communication Access to external data from the codes running on the GRID/HPC ITM data server: consistent plasma + fusion device state (stored in the gateway memory during the simulation) Investigate biomedical + EuroVO_AIDA project + … Could use fast FTP as a backup 3rd issue: Jobs launching: Interactive jobs: jobs are running for a long duration loop on many time steps: communication with Kepler at each time step only the batch mode is available => simulations will be less efficient Actions: Less urgent but must be investigated as early as possible
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.