BB5 and commissioning DAQ E. Pasqualucci
2
BB5 DAQ Design of the system DAQ status Debug status Online analysis People training
3
BB5 DAQ design and status Trig & Busy reset Data readout Trig CSM(s) RCDRCD Eth GOLA RCDRCD RPCRXRPCRX TTCviTTCvi TTCviTTCvi I/OI/O Conf & Control Data readout Trig & Busy reset Trig & Busy reset Latched Trig Trig Busy reset Trig Data REBREB Eth
4
Debug status No dedicated time during chamber test Jeff to debug GOLA SW this week –In case is needed, system available next week
5
Online analysis Based on H8 software –GNAM and PMP Available –Plug-in to be modified ASA DAQ debug is finished
6
People training Training site –On-surface commissioning site Site installation DAQ installation Detector software Local people training during the week of 14/3 BB5 DAQ is being documented! –Half document is ready –First version completed in 1 week
7
Commissioning sites On-surface site –Simplified copy of BB5 –Prerequisites: HW availability and readiness –Ludovico is checking BB5 GOLA SW working –Jeff debugging –Start of installation March 14
8
Commissioning sites (2) Commissioning in the pit –Prerequisites: Infrastructure ready –Need to be checked with Giuseppe Mornacchi (E.P.) MROD availability –Check with Nikhef MROD VME readout –Already working –Debugging upgraded DAQ @ Nikhef –Mid April ?