Add the logo Of your institution Here. Goto -> View Master SARMa – Sustainable Aggregates Resource Management WP5 G.Tiess, M.Allaraj Montan University.

Similar presentations


Presentation on theme: "Add the logo Of your institution Here. Goto -> View Master SARMa – Sustainable Aggregates Resource Management WP5 G.Tiess, M.Allaraj Montan University."— Presentation transcript:

1 Add the logo Of your institution Here. Goto -> View Master SARMa – Sustainable Aggregates Resource Management WP5 G.Tiess, M.Allaraj Montan University of Leoben 28 June 2010, Budapest

2 Add the logo Of your institution Here. Goto -> View Master Content of Presentation WP5-overview WP5 –approach –Theoretical aspects –Practical aspects Work plan –Overview –Details: WP 5.1 and WP 5.2 Conclusion

3 Add the logo Of your institution Here. Goto -> View Master Important issues of WP5 1.Creation of a SARMa-method and SSM-Policies 2.Implementation of transnational view of theoretical and practical outputs in SEE. 3.Know-how transfer through AIS integration and Regional Centre establishment of SARM and SSM, –in order to achieve efficient implementation of SARM harmonized approaches, resource efficiency and long term cooperation in SEE countries.

4 Add the logo Of your institution Here. Goto -> View Master Overview of WP 5 / Objectives 5.1 Legislation and policies harmonization on SARM Cross-border case studies, AIS-design 5.2 Sustainable supply (SSM) among SEE Cross-border case studies, AIS-clarification SARM and SSM Manual for national and transantional level 5.3. Feasibility study and action plan for Regional Centre on SARM in SEE 5.4 S A R M

5 Add the logo Of your institution Here. Goto -> View Master Main objectives of SARMa- project Shifting to SARM and encouraging SSM policies. This requires the following: –a) to develop a common approach to SARM and –b) to ensure SSM planning at transnational, national, regional and local level in SEE. At a) includes scientifically and practical aspects –Regarding the term “common approach”: = general SARM system, i.e. a system providing all relevant elements (based on the concept of sustainability). At b) implementing a) in SEE (transnational issue) based on appropriate methods. –Need of defining the term “SARM and SSM”. (also the term ‘harmonization’)

6 Add the logo Of your institution Here. Goto -> View Master Theoretical approach – SARM conception To develop a common SARM approach we first need an optimized (idealized) SARM system/concept. –SARM-model –set of various elements of such a system. –describing interrelations between these elements (‘supply conception’). determining the “elements/content” of SARM-model –broad or narrow concept? discuss the state of the art of a SARM-conception. –considering different “SEE aspects”, e.g. geographical aspects. –determine the main basics of SARM conception. E.g. fix geological knowledge in land use plans, to secure long-term access to deposits, recycling of aggregates. If we able to determine a general SARM-model we also should be able to develop a method to implement SSM policies (theoretical outputs). Furthermore SARM conception could be the basic for creating the AIS, applicable as a tool for know-how transfer in SEE. Again, first of all: Need of defining the term “SARM and SSM”. - actually there is no definition in the Glossary

7 Add the logo Of your institution Here. Goto -> View Master Theoretical approach SARM-model –Discusing SARM-model, and its possible interrelations –Case studies of WP5 1.,2 shall be based on it Again: SARM-model could be also the basis for AIS –Defining AIS –SEE Integration project: we need to create a tool that all can use. –The design of a model shall reflect the needs of SARM, specifically the components of SSM. –Elements of AIS data, information, maps, legislation, practices, protocols, procedures etc.

8 Add the logo Of your institution Here. Goto -> View Master SARM approach (model) -symplified Interactions between diff. elements

9 Add the logo Of your institution Here. Goto -> View Master „content of conception? –comprehensive compilation of objectives, strategies and actions (region and/or national level). –Time and resources plans (e.g. financial) have to determine at which point which actions have to be taken. ObjectivesActionsTimeResources Sustainable supply of aggregates Effective legal framework policy Improve interactions between decision-makers and stakeholders Optimal SSMPromote recycling Access to landLand use planning, management Co-operation between GS & Land use planning …. SARM conception

10 Add the logo Of your institution Here. Goto -> View Master PRACTICAL APPROACH Check the ‘state of the art’ SARM - conception in reality. Using data collected from case studies according WP 5 and also information from WP3, 4. To make a comparison, or even evaluation with the theoretical SARM approach we need to define some indicators depending on the concept of sustainability. Based on such indicators the case studies can be conducted or at least “measured” Indicators for instance: –‘fixed designated aggregates areas in land use plans for the mid- and long- term horizon. –Transport distances in terms of economical aspects, CO2 etc: e.g. 30 km. …. –Recycling rates… …

11 Add the logo Of your institution Here. Goto -> View Master PRACTICAL APPROACH Preliminary task: –discussing a theoretical SARM approach, i.e. SARM-model State of the art theoretical output of the SARMa-project. WP 5.1, 5.2 tasks shall based on it: WP 5.1 Harmonization of policy and legislation –WP 5.1 is focusing on SARM. Case studies comparison of SARM-model can identify gaps; can also amend the theoretical approach. However, this exercise should lead us to a common approach to SARM, which could be acceptable or interesting for SEE at least on trans national level. WP 5.2 Securing Sustainable Supply across SEE –WP 5.2 is focusing on SSM. Case studies Ensuring SSM planning at transnational, national, regional and local level Depending on policy/legal framework –implement SARM/SSM in SEE appropriate methods necessary: implement SARM “harmonized” in SEE, i.e. –a transnational view of theoretical and practical outputs aiming at a secure supply of aggregates.

12 Add the logo Of your institution Here. Goto -> View Master WP 5 - Work activities/Overview WP 5.1 Harmonization of policy and legislation Task 1: case studies –Transnational and cross border To get a transnational view (practical output). –case studies shall check SARM issues based on fixed ‘indicators’. –Identifying (comparison with the ‘model SARM’) gaps, conformity, or new issues which could be included in the SARM model. Task2: recommendation on harmonization (transnational view) of policy/legislation and methods (administrative aspect) for incorporating SARM into land use plans and management. (Considering permitting procedures.) –recommendation based on analyses of case studies Task 3: design of structure and protocol for AIS (= knowledge tool, shall be applicable in SEE).

13 Add the logo Of your institution Here. Goto -> View Master WP 5 - Work plan WP 5.2 – Securing Sustainable Supply across SEE –Task 1: case studies Transnational and cross border To get a transnational view (practical output). case studies shall check SSM issues based on fixed ‘indicators’. –Task 2: recommendation on harmonization of supply policies / legislation and methods for addressing SSM in land use planning and management recommendation based on analyses of case studies –Task 3: clarifying contribution of AIS (existing information, interlinked) to SSM planning

14 Add the logo Of your institution Here. Goto -> View Master WP5 Plan Matrix

15 Add the logo Of your institution Here. Goto -> View Master WP5.1 Task 1 Cross-border case studies TaskOutputWhoDeadlineNotificationReviewConfirmation Prepare draft structure1Nikos, Tiess10 Aug.10 Aug. Tiess/Slavko/Nikos/U rska 13 Aug./Deborah16 Aug. QMB Determination of case study locations for CB & TB 4Tiess, Slavko, Tamas, Slobodan/Koletic, Mihai, Zach, Ubaldo, Moisiu/Simixhiu, Zriliç 10 Aug.10 Aug. Tiess/Slavko/Nikos/U rska 13 Aug./Deborah/Slavko 16 Aug. QMB Reports on case studies on SARM harmonization Cross-border level GR-FYRM, IT-AT, RO-BG 3 ReportsNikos, Mihai, Ubaldo30 Nov.30 Nov. Tiess/Slavko - QMB 30 Dec.10/Slavko/Debor ah 14 Jan.2011 QMB Reports on case studies on SARM harmonization Transnational level AT-S-HU-HR 1 Report Tiess, Slavko, Tamas, Slobodan/Koletic ? 30 Nov.30 Nov. Tiess/Slavko - QMB 30 Dec.10/Slavko/Debor ah 14 Jan.2011 QMB

16 Add the logo Of your institution Here. Goto -> View Master Task OutputWhoDeadlineNotificationReviewConfirmation Prepare draft strucure for synthesis report 1 Nikos, Tiess 8. Dez. 8 Dec. Tiess/Urska 10 Dec.10/Slavko/De borah 15 Dec.10 QMB Prepare sythesis report on SARM- harmonization 1 Nikos, Tiess, Slavko, Tamas, Mihai, Ubaldo, Zach 1. Feb. 1 Feb. Tiess/Nikos/Urska 28.Feb.11/Slavko/ Deborah 4 Mar. 2011 QMB Recommendation on SARM 1 Task leaders: Nikos, Tiess, Tamas, Mihai, Slavko, Ubaldo, Zach, Slobodan/Koletic ? 1. Feb. 1 Feb. Tiess/Nikos/Urska /Slavko 28.Feb.11/QMB/D eborah 4 Mar. 2011 QMB WP5.1 – Task 2 Recommendation on SARM in SEE Proposals on harmonization of legislation/policies and methods for incorporating SARM into land use planning and management

17 Add the logo Of your institution Here. Goto -> View Master Task OutputWhoDeadlineNotificationReviewConfirmation Prepare a draft of structure Nicos, Tiess, IT Group… 15 Feb.201121 Feb.26 Feb.20117 Mar.11 QMB Structure and protocol 1 Service IT Group + All partners of WP 5.1(suggestions and support with knowledge for AIS design) 21 Feb.2011 15 Feb. Tiess/Nikos/Urska 1 Mar.11/Slavko/De borah 7 Mar. 11 QMB Task 3 /WP 5.1 – Design AIS Design of structure and protocols for Aggregate Intelligence System

18 Add the logo Of your institution Here. Goto -> View Master SARM- model

19 Add the logo Of your institution Here. Goto -> View Master Task OutputWhoDeadlineNotificationReviewConfirmation Prepare draft structure Tiess12 Aug. 10 Aug. Tiess/Slavko/Ursk a 13 Aug./Deborah16 Aug. QMB Determination of case study locations for CB & TB 12 Aug.10 Aug. Tiess/Slavko/Urska 13 Aug./Deborah/Slavko 16 Aug. QMB Reports on case studies on SSM Cross-border level GR-FYRM, IT-AT, RO-BG 4 Nikos, Eirini, Mihai, Ubaldo, Simixhiu/Moisiu?, Slobodan/Koletic?, Tamas, Zrilic (BiH)? 30 Nov. 30 Nov. Tiess/Slavko/Ursk a 30 Dec.10/Slavko/De borah 17 Jan.2011 QMB Transnational level AT-S-HU-HR 1 Tiess, Slavko, Tamas, Slobodan/Koletic ? 30 Nov. 30 Nov. Tiess/Slavko/Ursk a 30 Dec.10/Slavko/De borah 17 Jan.2011 QMB WP 5.2 – Task 1 Case studies – SSM

20 Add the logo Of your institution Here. Goto -> View Master Task OutputWhoDeadlineNotificationReviewConfirmation Prepare draft strucure for synthesis report Tiess8 Dez.10 Dec./Deborah10 Dec.10/Slavko/D eborah 15 Dec.10 QMB Prepare sythesis report on SARM- harmonization 1Tiess (TB), Nikos (CB) 1 Feb.1 Feb. Tiess/Urska/Slavko 28.Feb.11/Slavk o/Deborah 4 Mar.2011 QMB Recommendation on SARM 1Task leaders: Tiess, Simixhiu/Moisiu?, Slobodan/Koletic?, Tamas, Slavko, Mihai, Zriliç 1 Feb.1 Feb. Tiess/Urska/Slavko 28.Feb.11/Debor ah/QMB 4 Mar.2011 QMB WP 5.2: TASK 2 Proposals on harmonization of supply policies / legislation and methods for addressing SSM in land use planning and management

21 Add the logo Of your institution Here. Goto -> View Master Task OutputWhoDeadlineNotificationReviewConfirmation Clarify contributions All partnersMay 2011June Slavko/QMB Slavko/Deborah/QMBEnd of June/ QMB Clarifying contributions of AIS to SSM planning WP 5.2: Securing supply in SEE – TASK 3

22 Add the logo Of your institution Here. Goto -> View Master WP 5.3 - Preparation of manual for national and transnational level WP 5.4 - Follow-up activities: Regional Centre

23 Add the logo Of your institution Here. Goto -> View Master WP5SEE TRANSNATIONAL LEVEL ACTIVITIES 5.1 IGME Harmonization of legislation and policies 1 Synthesis report on activity 5.1 (O9) 1 Recommendations on the transnational level for decision-makers on SARM (O10) 1 Service: structure and protocol for AIS (data, information, maps, legislation, protocols, etc.) as infrastructural ground for regional centre (O19) 4 Reports on case studies on harmonization: transborder AT-SI-HU-HR; 3X crossborder: GR-FYRM; RO-BG; IT - AT, FR(O1a) 5.2 MUL Sustainable supply across SEE regions or countries 1 Synthesis report on activity 5.2 (O9) 3 Study visits combined with transnational events (30 persons per visit) (O8) 1 Recommendations on the transnational level for decision-makers on SSM (O10) 5 Reports on case studies on sustainable supply: transborder AT-SI-HU-HR; 4X crossborder: ALB, GR, BIH, RO (O1a) 5.3 MUL Preparation of a common manual on sustainable aggregates resource management and supply mix on regional, national and transnational level 1 Manual on SARM and SSM at regional, national and transnational levels - 2200 copies: 700 copies in English (30 per partner and 280 for LP) and 1.500 in local languages (100 per partner) (O4) 5.4 GeoZS Sustainable aggregates supply follow-up activities: setting the ground for a regional centre for sustainable aggregates supply 1 Feasibility study for the Regional Centre on SARM and SSM (O9) 1 Joint action plan for establishment of the Regional Centre on SARM and SSM (O12) WP/ activity Duration: year/ months red line: reporting periods 2009 (may - dec)2010 (jan - dec)2011 (jan - oct) 5678910111212345678910111212345678910 123456789 1112131415161718192021222324252627282930

24 Add the logo Of your institution Here. Goto -> View Master

25 Add the logo Of your institution Here. Goto -> View Master SARMa outputs from Application Form 5.1  IGME –4 Reports(1xTB+3xCB) on case studies on harmonization –1 Synthesis Report on SARM –1 Recommendation on SARM –1 Service (structure& protocol for AIS) 5.2  MUL –5 Reports(4xCB + 1xTB) on case studies on SS across SEE –1 Synthesis Report on SSM –1 Recommendation on SSM –3 Study visits (combined with transnational events) 5.3  MUL –1 Manual on SARM & SSM (regional, national& transnational level) 5.4  GeoZS –1 Feasibility Study for the Regional Centre on SARM&SSM –1 Joint Action Plan for establishment of RC

26 Add the logo Of your institution Here. Goto -> View Master Define the most specific areas for TB (transborder)&CB(cross-border) case studies –Define the expectations of TB&CB studies –What is general and what specific in the study areas? –Do the partners consider boarder effects in SARM? All partners must give their input in designing AIS –While compiling a structure report for case studies, take into consideration AIS Key words of WP5 to keep in mind before preparing a report or meeting authorities & companies‘ representatives: –SARM and SSM Harmonization –Legislation, Policies –Land use planning, Management –AIS, Regional Centre –Sustainable supply How to achieve these outputs?

27 Add the logo Of your institution Here. Goto -> View Master How to succeed?  Transparent communication  Respecting the deadlines/activity leader  If not possible, inform the LP, ALIANTA, WPL&AL: at least 10 days before the deadline  Cooperation, support and internal communication/know- how transfer between all partners

28 Add the logo Of your institution Here. Goto -> View Master www.unileoben.ac.at Thank you for your attention!