Presentation is loading. Please wait.

Presentation is loading. Please wait.

ACS 560 M ICROBLOG 911 P ROJECT S TATUS Kassie M. Bowman November 29, 2011.

Similar presentations


Presentation on theme: "ACS 560 M ICROBLOG 911 P ROJECT S TATUS Kassie M. Bowman November 29, 2011."— Presentation transcript:

1 ACS 560 M ICROBLOG 911 P ROJECT S TATUS Kassie M. Bowman November 29, 2011

2 M AIN C MAP 2

3 I NCEPTION C MAP 3

4 E LABORATION C MAP 4

5 UML - C OMPONENT D IAGRAM 5

6 S TATUS S UMMARY – I NCEPTION P HASE Completed: Vision Document (v1) Application Architecture (v2) Software Requirement Specification (v4) FMEA (v1) Design Matrix (v2) Design Structure Matrix (v2) 6 Inception Phase Complete

7 S TATUS S UMMARY – E LABORATION P HASE Completed: Project Management Plan (v5) QFD House of Quality (v1) System Architecture (v2) In Progress: Software Design Description (v2) Component Diagram Class Diagrams Activity Diagram(s) Schedule (v2) 7 Elaboration Phase is on schedule

8 T HANK Y OU. Any questions?


Download ppt "ACS 560 M ICROBLOG 911 P ROJECT S TATUS Kassie M. Bowman November 29, 2011."

Similar presentations


Ads by Google