Download presentation
Presentation is loading. Please wait.
Published byJohnathan Chase Modified over 8 years ago
1
Presented by Ron Lane Deputy CAO, County of San Diego
2
Power goes out countywide at 3:27PM on Sept 8, 2011 Power fully restored 3:19PM on Sept 9, 2011 http://modernsurvivalblog.com/wp-content/uploads/2011/09/massive-san-diego-power-outage.jpg
3
Households Businesses Communities Cascading effect on “Lifelines” http:// greendatacenterconference.com/blog/wp-content/uploads/2011/09/MW-AM629_blacko_20110909015108_MG.jpeg
4
Hospitals Communications Fuel Water Wastewater Transportation
5
Back-up Generators Energy-dependent residents Coincide with other emergency https:// upload.wikimedia.org/wikipedia/commons/0/0d/UCSD_Medical_Center_Hillcrest.jpg
6
Emergency communication Internal To the public Telephones Text Cell Phones
7
Emergency Vehicles Gas Stations Pipelines Airports/Military https://upload.wikimedia.org/wikipedia/commons/thumb/c/c9/US_Navy_080807-N-3038W- 097_The_aircraft_carrier_USS_Kitty_Hawk_%28CV_63%29_prepares_to_moor_at_Naval_Air_Station_North_Island_upon_her_return_to_San_Diego_Thursday%2C_Aug._7%2C_2008.jpg/1280px-thumbnail.jpg
8
Maintain Pumping Capabilities Linked to Fuel and Communications
9
Traffic Signals Trolleys and Trains Railway signals Airports https://c2.staticflickr.com/6/5108/5584211070_528e19930e_z.jpg
10
Schools Events Food ATMs and Money https://c2.staticflickr.com/4/3811/9190187882_bc384edf9e_b.jpg
11
Prioritize the effort Health and Safety (hospitals, elevator entrapments, traffic intersections) Public communication Severity of impact increases exponentially based on length of outage Pre-planning is critical (notion of Advanced Recovery)
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.