Presentation is loading. Please wait.

Presentation is loading. Please wait.

MSD1 WEEK 3 REVIEW By: Group P15462. AGENDA  About Team P15462  Underlying Mission  Existing Systems  Project Background  Problem Statement  Deliverables.

Similar presentations


Presentation on theme: "MSD1 WEEK 3 REVIEW By: Group P15462. AGENDA  About Team P15462  Underlying Mission  Existing Systems  Project Background  Problem Statement  Deliverables."— Presentation transcript:

1 MSD1 WEEK 3 REVIEW By: Group P15462

2 AGENDA  About Team P15462  Underlying Mission  Existing Systems  Project Background  Problem Statement  Deliverables  Use Scenarios/ Stakeholders  Risk Assessment  Projection for Systems Design

3 ABOUT US CustomerGuide Dr. Mario Gomes RIT Professor Professional Engineer Edward Hanzlik Devin Bunce – Matthew Zebert – Matthew Kennedy – Matthew Maginn – Carl Stahoviak

4 UNDERLYING MISSION  To harvest energy from high altitude winds  Concept of the Airborne Wind Turbine (AWT) was developed 250m 100m 250m

5 EXISTING SYSTEMS  These AWTs can take the form of a powered glider, or kite. Companies such as Makani, Ampyx Power, and KiteGen have all developed commercialized versions of these systems  Also, Senior Design team P14462 (our predecessor) attempted to develop a glider and successfully created a base station.

6 PROJECT BACKGROUND  Also, Senior Design team P14462 (our predecessor) attempted to develop a glider and successfully created a base station.

7 PROBLEM STATEMENT  The goal of this project is to design, build, and reliably test a powered, human-controlled tethered glider specifically for use as an airborne wind energy system (or AWT)  Tethered glider capable of continuous circular flight  Integration with current base station  30 trials of 3 min continuous circular flight with tether tension and glider position recorded  Functional simulation of flight path

8 PROJECT DELIVERABLES

9 USE SCENARIOS/ STAKHOLDERS

10 HOUSE OF QUALITY

11 KEY CONCERNS

12 MOVING FORWARD


Download ppt "MSD1 WEEK 3 REVIEW By: Group P15462. AGENDA  About Team P15462  Underlying Mission  Existing Systems  Project Background  Problem Statement  Deliverables."

Similar presentations


Ads by Google