Download presentation
Presentation is loading. Please wait.
Published byBarrie Hart Modified over 9 years ago
1
Event/ date: WG D meeting, 28 March 12, Brussels Author: Anita Künitzer 1 State of play of reporting on Urban Waste Water treatment Directive,UWWTD Bathing Water Directive, BWD State of Environment, SoE and OECD/Eurostat Joint Questionnaire pre-filling Anita Künitzer European Topic Centre on inland, coastal and marine waters (ETC/ICM)
2
2 State of play of 2011/2012 reporting on Urban Waste Water treatment Directive, UWWTD Event/ date: WG D meeting, 28 March 12, Brussels Author: Anita Künitzer
3
3 State of play of 2011/2012 reporting on Urban Waste Water treatment Directive,UWWTD Reporting by MS of the 2011 UWWTD data request took place from July 2011 – February 2012 using the new webtool ETC/ICM partner Cenia (Petra Ronen, Michal Sik) –support the reporting (helpdesk), –do the QA of the data with MS, Finalized datasets for 19 MS (AT, BE, BG, CY, DK, EE, FI, GR, HU, RO, SK, MT, NL, LU, LT, PT, SI, SE, UK ) Datasets of other 8 MS (CZ, LV, PL, ES,IE, FR, DE, IT) close to completion Event/ date: WG D meeting, 28 March 12, Brussels Author: Anita Künitzer
4
4 Data upload in CDR Event/ date: Author
5
5 QAQC process statistics 1529 errors corrected 7022 missing records filled Event/ date: Author:
6
6 Further work Complete production database to be submitted to DG ENV by 2 April for consultant to make the compliance report for publication in 2012. Use of data for OECD/Eurostat JQ pre-filling, for updating of WISE maps, for updating of EEA core set indicator 24 on UWWT, for updating the GIS reference layer on sensitive areas Event/ date: WG D meeting, 28 March 12, Brussels Author: Anita Künitzer
7
7 Event/ date: Working group D, 28 March 2012, Brussels Author: Hana Prchalova, CENIA Comparison of E-PRTR data with UWWTD data reporting
8
8 Comparison of discharges from urban wastewater treatment plants (UWWTPs) reported under UWWTD and E-PRTR Pollutants compared: –Total Nitrogen, –Total Phosphorus and –TOC (TOC in UWWTD was calculated from the COD) Only UWWTPs with more than 100.000 p.e. and emission discharges above threshold values are reported in E-PRTR and were compared The first comparison was produced by UBA Vienna in 2011 with the UWWTD database of 2007/2008 Event/ date: Working group D, 28 March 2012, Brussels Author: Hana Prchalova, CENIA
9
9 Comparison of E-PRTR data with UWWTD data reporting The 2nd comparison is now done by ETC/ICM (Hana Prchalova) with the UWWTD database of 2009/2010 and E-PRTR data (reference year 2009, version 3.1) Request from EEA: to compare discharges from CZ, PL, IT and ES based on the same IDs No same IDs were found for these countries, the comparison was based on reported names and p.e. – only for ES and CZ Methodology – the same as in the 2011 comparison: interlinking of E-PRTR facilities reporting under activity 5.(f) with UWWTPs Event/ date: Working group D, 28 March 2012, Brussels Author: Hana Prchalova, CENIA
10
10 Results - Spain The match is similar to the previous UWWTD reporting. Event/ date: Working group D, 28 March 2012, Brussels Author: Hana Prchalova, CENIA
11
11 Results - CZ The consistency of reporting by the Czech Republic has improved considerably due to corrected discharges under UWWTD reporting. Total nitrogen and phosphorus discharges match very well, but TOC discharges in UWWTD are significantly smaller than E-PRTR values for three facilities. Event/ date: Working group D, 28 March 2012, Brussels Author: Hana Prchalova, CENIA
12
12 State of play of 2011 reporting on Bathing Water Directive, BWD Event/ date: WG D meeting, 28 March 12, Brussels Author: Anita Künitzer
13
13 State of play of 2011 reporting on Bathing Water Directive, BWD Reporting by MS of the 2011 bathing season took place in Nov/Dec 2011 ETC/ICM partner IWRS (Lidija Globevnik, Tina Kirn, Marko Kovacic, Katarina Zore, Dunja Zupan Vrenko) –supports the reporting, –is doing the QA of the data with MS, –is analysing the data, –is consulting compliance issues with DG ENV, –is preparing the EEA Report on European bathing water quality 2011 for launch in June 2012. Event/ date: WG D meeting, 28 March 12, Brussels Author: Anita Künitzer
14
14 First draft results of assessment for the 2011 bathing season A total of 16 MS are already assessed under the new Directive compared to 3 MS in 2010 (LU, MT, HU) and 2 MS in 2009 (LU, MT). A total of 8 MS are assessed under transitional rules (AT, BG, FR, IE, IT, NL, PL, SI) plus three non-EU countries (CH, HR, ME). Only three MS are assessed under the old Directive (CZ, RO and UK). Event/ date: WG D meeting, 28 March 12, Brussels Author: Anita Künitzer
15
15 Event/ date: WG D meeting, 28 March 12, Brussels Author: Anita Künitzer Comparison with results for the 2009 and 2010 bathing seasons
16
16 Event/ date: WG D meeting, 28 March 12, Brussels Author: Anita Künitzer Assessment under new Directive
17
17 Event/ date: WG D meeting, 28 March 12, Brussels Author: Anita Künitzer Transition period assessment
18
18 Event/ date: WG D meeting, 28 March 12, Brussels Author: Anita Künitzer Assessment under old Directive
19
19 State of play of 2011 reporting on State of Environment, SoE Event/ date: WG D meeting, 28 March 12, Brussels Author: Anita Künitzer
20
20 Event/ date: WG D meeting, 28 March 12, Brussels Author: Anita Künitzer
21
21 WISE SoE data request 2011 (1) Event/ date: WG D meeting, 28 March 12, Brussels Author: Anita Künitzer
22
22 WISE SoE data request 2011 (2) Event/ date: WG D meeting, 28 March 12, Brussels Author: Anita Künitzer If emission data have already been provided under E-PRTR, UWWTD, WFD or SoE Quantity reporting obligations and are flagged as such in the SoE emission reporting, then 1 or 2 points will be scored
23
23 WISE SoE data request 2011 (3) Overview for data flow TCM: Evaluation of countries was not published yet. 3 smileys: CY, DE, DK, EE, ES, FR, GB, HR, LT, NL, NO, PL, RO, SE (14 countries) 2 smileys: AL, BA, BE, FI, IE, IS, LV, ME, SI, TR (10 countries) 1 smiley: BG 0 smileys : GR, IT, MT, PT, UA Event/ date: WG D meeting, 28 March 12, Brussels Author: Anita Künitzer
24
24 OECD/Eurostat Joint Questionnaire pre-filling 2012 Event/ date: WG D meeting, 28 March 12, Brussels Author: Anita Künitzer
25
25 OECD/Eurostat Joint Questionnaire pre-filling 2012 2011: SoE/UWWTD parameter comparison with JQ, scripts for data extraction and aggregation by ETC/ICM 31 January 2012: Meeting OECD, Eurostat, EEA, ETC/ICM on update of Joint Questionnaire (JQ) and pre- filling by ETC/ICM End March/early April: Revised JQ finalised by OECD and Eurostat (Info from Eurostat: probably delayed). April - July: ETC/ICM to pre-fill the OECD/Eurostat JQ and the Eurostat Regional Questionnaire in with SoE data (emission and water quantity) from 2011 reporting and UWWTD data from 2011/2012 reporting. Early September: JQ + RQ sent to Member Countries Event/ date: WG D meeting, 28 March 12, Brussels Author: Anita Künitzer
26
26 SoE Water Quantity/JQ parameter comparison 69 parameters with same definitions (direct match) 11 parameters of the JQ can be calculated from two or more SoE#3 parameters 17 parameters with different definitions 10 parameters of the JQ (Tables 1-3) not in SoE#3 Analysis is based on the 2010 JQ-IW Event/ date: WG D meeting, 28 March 12, Brussels Author: Anita Künitzer
27
27 Pre-filling Tables 1-3 with SoE WQ First estimates of pre-filled data regarding water quantity (Tables 1-3) Reference year 2010 All available years Number of countries for which data can be prefilled 10 20 Average number of parameters with direct match (SoE#3-JQ) per country 22.5 24.75 Estimates are based on the 2010 JQ-IW Event/ date: WG D meeting, 28 March 12, Brussels Author: Anita Künitzer
28
28 JQ Inland Waters pre-filled Example of pre-filled JQ Event/ date: WG D meeting, 28 March 12, Brussels Author: Anita Künitzer
29
29 Event/ date: WG D meeting, 28 March 12, Brussels Author: Anita Künitzer Joint Questionnaire - Table 7 Pre-filling with SoE emission data Green cells 1-4: SoE emission data available for pre-filling
30
30 Examples of data availability for pre-filling Event/ date: WG D meeting, 28 March 12, Brussels Author: Anita Künitzer
31
31 Streamlining of UWWTD reporting with Eurostat Joint Questionnaire-ETC ICM work Identification of additional parameters to be reported within the UWWTD data flow (2010) Consultation with the MS (2010) Incorporating the additional parameters into the UWWTD reporting IT tool-the web tool Developing additional QAQC scripts to ensure data quality for the pre-filling Internal testing Pre-filling for JQ in spring 2012
32
32 Additional UWWT parameters
33
33 Additional QAQC rules Checks of population served by the treatment vs.total national population Design capacity vs. load entering the WWTP plausibility check for water reuse Discharged vs.incoming load (BOD, COD, N and P) Sludge production quotient must in all cases be <0 - otherwise the WTTP would generate pollution. The actual values allow checking of the treatment efficiency + outlier detection.
34
34 Web tool –IT tool for Eurostat JQ pre-filling Event/ date: Author:
35
35 Web tool –IT tool for Eurostat JQ pre-filling
36
36 UWWTD data availability JQ tables 4 and 6
37
37 UWWTD data availability JQ table 5
38
38 Feed back from MS Your feed back on the use of pre-filled data is welcome when the JQ reporting has been finalised Event/ date: WG D meeting, 28 March 12, Brussels Author: Anita Künitzer
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.