February, 12 2006INP PAN FCAL Workshop in Cracow W. Lohmann, DESY The BCD (Baseline Configuration Document) The next calendar dates Where we are with FCAL
2
February, 12 2006INP PAN The BCD Executive Committee for Baseline Configuration GDE Director Barish Regional Directors Dugan – Americas Foster – Europe Takasaki – Asia Accelerator Leaders Yokoya - Asia Raubenheimer - Americas Walker - Europe Responsible for decisions and documentation for the Baseline Configuration Document (BCD) GDE Executive Committee
3
February, 12 2006INP PAN ILC Parameters
4
February, 12 2006INP PAN The BCD The Baseline Machine (500GeV) The 1 TeV upgrade
5
February, 12 2006INP PAN 2 Interaction Regions Two Detectors, because : Confirmation and redundancy Complementary Collider options Competition Efficiency, reliability Historical lessons We have to contimue with two design options! 2 mrad and 20 mrad
6
February, 12 2006INP PAN GDE groups Machine design, Cost ….. Siting, civil construction ……. Physics, Detectors - J. Brau (America) - F. Richard (Europe) - H. Yamamoto (Asia) ………. Area subsystem leads A. Seryi, H. Yamamoto (MDI panel) D. Angal-Kalinin Beam delivery system
7
February, 12 2006INP PAN The next calendar dates EUDET kick-off meeting in Hamburg, February 15-17. LCWS Bangalore, March 9-13. Physics Research Committee, May 11-12 ECFA WS, Valencia, November, 2006 We have to present our plan for the next 4 years LDC outline document, presentations A written report and a presentation are expected prepare ourselfs, FCAL meeting before?
8
February, 12 2006INP PAN Where are we with FCAL -We worked out an advanced design for zero or small crossing angle; -this was accepted and acknowledged in Snowmass and Vienna (Several talks by H. Abramowicz, K. Afanaciev, C.Grah,V.Drugakov, A.Elagin, B. Pawlik, A. Sapronov) -the performance (resolutions, efficiencies, biasas) are understood from simulations for partly realistic detectors -the backscattered background ( into the central detector part) is estimated - Some studies are done for the 20 mrad version (beamstrahlung background, systematics of beamposition)
9
February, 12 2006INP PAN Fast Beam Diagnostics Detection of Electrons and Photons at very low angle – extend hermeticity IP VTX Measurement of the Luminosity with precision (<10 -3 ) using Bhabha scattering BeamCal FTD L* = 4m 300 cm LumiCal: 26 < < 82 mrad BeamCal: 4 < < 28 mrad PhotoCal: 100 < < 400 rad Very Forward Detectors Beamstrahlung Depositions: 20 MGy/year Rad. hard sensors e.g. Diamond/W BeamCal LumiCal Silicon/W sandwich R&D for ILC (DESY PRC R&D 02/01): Instrumentation of the Very Forward Region of the ILC Detector BeamCal
10
February, 12 2006INP PAN A few topics to be thought Selection of Bhabha events: Energy selection cut At which energy this cut has to be put? -Theoretical uncertainty -Energy scale uncertainty
11
February, 12 2006INP PAN A few topics to be thought The Bhabha cross section depends on the polarisation How well is this understood? -higher order corrections - considered in the Monte Carlo
12
February, 12 2006INP PAN A few topics to be thought Electron detection efficiency: Algorithm relies on constant bunch charge Look on Dumping Rings How stable is this mechanism? -Bunch-to-bunch fluctuations (Contact to machine people )
13
February, 12 2006INP PAN 20 mrad design Changes within LDC: -TPC is shorter -HCAL should cover smaller angles -LumiCal aligned with or in front of ECAL -Montage-friendly -Background on LumiCal ? - Background in the inner Detector?
14
February, 12 2006INP PAN What has to be done: We need a design for 20 mrad crossing angle -new geometry -repetition of many simulations -studies of backgrounds, beamstrahlung, backscattered into the central detector We have to understand Bhabha phenomenology in more details -Status of the theory and generators - How influence radiative effects for a given detector the uncertainty of the measurement - Optimised segmentation/structure for LumiCal - Realistic readout scheme
15
February, 12 2006INP PAN What has to be done: Sensor and Readout -Continuation of diamond studies (more samples with promising diagnostics, linearity, homogeneity, high radiation doses.) -Si sensor studies (to learn to work with them). -Si sensor radiation test. -Assembly of full sensor planes prototype test. -Readout electronics design for the prototype O(1000) channels. -Concept for the readout electronics -Concept Design for the ‘fast readout’ and fast diagnostics (related to Eurotev).
16
February, 12 2006INP PAN This meeting at INP -Reports on many topics mentioned -Discussions on ‘critical’ Issues 20 mrad design more realistic simulations prototyps and testbeam electronics concept preparation of the EUDET kick-off meeting Lets make a WORKshop and see at the end where we’ll go