1 WATER RESOURCES DEPARTMENT
GOVERNMENT OF A.P WATER RESOURCES DEPARTMENT MINOR IRRIGATION Chief Engineer, Minor Irrigation SEPTEMBER-2015

2 MINOR IRRIGATION Minor Irrigation Deals with investigation and execution of Minor Irrigation Sources of ayacut up to 5000 Ac. Minor Irrigation is providing irrigation facilities to increase the agriculture production by means of creating new ayacut, stabilizing the existing ayacut of lakh acres and also provides drinking water to villages during summer season. Minor Irrigation plays an important role in the development of agriculture and livelihoods particularly in drought prone areas and areas outside command of Major Irrigation sector consist components like, construction of new sources and stabilizing the gap Ayacut schemes viz., NABARD, AIBP, APILIP, RRR TSP and SCSP. In MI Department the benefits will be attained early i.e., by taking up repairs to the sources, the benefits will get in next cropping season.

3 SECTORS IN IRRGATION DEPARTMENT
Minor 25,60,444 Ac. 28% Major 61,29,022 Ac. 66% Medium 5,30,452 Ac. 6% 3 3 3

4 Category wise sources under Minor Irrigation
Total Number of Sources 41, Total Ayacut covered 25,60,444 4 4 4

5 DISTRICT WISE MINOR IRRIGATION TANKS WITH AYACUT IN ACRES
Sno. District Tanks having Total Ayacut Irrigated in Kharif 2014 ayacut > 100 Ac. ayacut < 100 Ac. No. Ayacut MI PR 1 SRIKAKULAM 915 96431 7639 178955 8554 275386 111461 122710 234171 2 VIZIANAGARAM 944 110943 8318 157376 6262 268319 104105 133855 237960 3 VISAKHAPATNAM 232 157798 3111 72867 3343 230665 50618 29315 79933 4 EAST GODAVARI 263 91012 1253 39403 1516 130415 70972 23660 94632 5 WEST GODAVARI 335 81246 1054 31409 1389 112655 20018 12095 32113 6 KRISHNA 248 78790 663 24903 911 103693 30042 8685 38727 7 GUNTUR 81 22478 213 9230 294 31708 19887 6123 26010 8 PRAKASHAM 339 121949 551 18293 890 140242 11267 300 11567 9 SPSR NELLORE 722 246524 984 36328 1706 282852 119932 16361 136293 10 YSR KADAPA 234 75593 1542 32279 1776 107872 1475 525 2000 11 KURNOOL 157 68342 454 11818 611 80160 38160 13105 51265 12 ANANTAPUR 303 89897 2199 52039 2502 141936 2441 13 CHITTOOR 668 163753 7395 136554 8063 300307 6025 1315 7340 SUB TOTAL 5441 35376 801454 40817 586403 368049 954452 Anicuts & open head channels 661 354234 41507 GRAND TOTAL 6102 17,58,990 35,376 8,01,454 41478 25,60,444 5,86,403 3,68,049 9,95,959 Total Capacity of MI Tanks : TMC, Total Capacity of PR Tanks : TMC

6 OBJECTIVES OF MINOR IRRIGATION DEPARTMENT:
The ultimate objective of the department is to Restoring the existing M.I sources to original standards where necessary. Construction of new Minor Irrigation Sources. For stabilizing the irrigation potential created Controlling the wastage of water through water conservation plans and better water management plans. Bridging the gap ayacut.

7 KHARIFF - 2014 AYACUT IRRIGATED IN ACRES
S.NO. DISTRICT NO. OF TANKS TOTAL AYACUT IRRIGATED DURING KHARIF IN ACRES MI PR TOTAL 1 2 3 4 5 9 10 11 A TANKS SRIKAKULAM 954 6937 7891 111461 122710 234171 VIZIANAGARAM 944 8239 9183 104105 133855 237960 VISAKHAPATNAM 232 3449 3681 50618 29315 79933 EAST GODAVARI 263 1232 1495 70972 23660 94632 WEST GODAVARI 335 1046 1381 20018 12095 32113 6 KRISHNA 248 675 923 30042 8685 38727 7 GUNTUR 81 187 268 19887 6123 26010 8 PRAKASAM 339 565 904 11267 300 11567 SPSR NELLORE 722 962 1684 119932 16361 136293 YSR KADAPA 234 1542 1776 1475 525 2000 KURNOOL 157 477 634 38160 13105 51265 12 ANANTHAPUR 303 960 1263 2441 13 CHITTOOR 668 7395 8063 6025 1315 7340 5480 33666 39146 586403 368049 954452 B OPEN HEAD CHANNELS/ANICUTS/CHECK DAMS Etc 2054 41507 GRAND TOTAL ( A+B) 41200 995959 OR SAY 9.96 LAKH ACRES

8 STATEMENT SHOWING THE DISTRICT WISE GAP AYACUT UNDER MINOR IRRIGATION
Sno. District Total Registered Ayacut in Acres Ayacut Irrigated in Kharif 2014 Gap Ayacut in Acres 1 SRIKAKULAM 275386 234171 41215 2 VIZIANAGARAM 268319 237960 30359 3 VISAKHAPATNAM 230665 79933 150732 4 EAST GODAVARI 130415 94632 35783 5 WEST GODAVARI 112655 32113 80542 6 KRISHNA 103693 38727 64966 7 GUNTUR 31708 26010 5698 8 PRAKASHAM 140242 11567 128675 9 SPSR NELLORE 282852 136293 146559 10 YSR KADAPA 107872 2000 105872 11 KURNOOL 80160 51265 28895 12 ANANTAPUR 141936 2441 139495 13 CHITTOOR 300307 7340 292967 Anicuts & open head channels 354234 41507 312727 GRAND TOTAL 995959 Or say in Lakh Acres 25.6 9.96 15.64

9 STATEMENT SHOWING THE DISTRICT WISE AYACUT PLANNED FOR THE YEAR 2015-16 UNDER MINOR IRRIGATION
Sno. District Total Registered Ayacut in Acres Ayacut Irrigated in Kharif 2014 Total Gap Ayacut in Acres Proposed Gap Ayacut to be Bridged during the year Ayacut Planned for the Khariff 2015 1 2 3 4 5=3-4 6 7 = 4+6 SRIKAKULAM 275386 234171 41215 20767 254938 VIZIANAGARAM 268319 237960 30359 29638 267598 VISAKHAPATNAM 230665 79933 150732 22353 102286 EAST GODAVARI 130415 94632 35783 7896 102528 5 WEST GODAVARI 112655 32113 80542 7500 39613 KRISHNA 103693 38727 64966 10356 49083 7 GUNTUR 31708 26010 5698 5091 31101 8 PRAKASHAM 140242 11567 128675 10354 21921 9 SPSR NELLORE 282852 136293 146559 10307 146600 10 YSR KADAPA 107872 2000 105872 13474 15474 11 KURNOOL 80160 51265 28895 25065 76330 12 ANANTAPUR 141936 2441 139495 43199 45640 13 CHITTOOR 300307 7340 292967 38011 45351 Anicuts & open head channels 354234 41507 312727 68989 110496 GRAND TOTAL 995959 313000 Or say in Lakh Acres 25.60 9.96 15.64 3.13 13.09

10 STATEMENT SHOWING THE DISTRICT WISE PROPOSED GAP AYACUT TO BE BRIDGED UNDER MINOR IRRIGATION FOR THE YEAR AYACUT IN ACRES S.NO DISTRICT SCHEMES TOTAL NSP DESILTING SCSP TSP NABARD RRR APCBTMP 1 2 3 4 5 6 7 8 9 10 SRIKAKULAM 2959 3145 49 1051 627 12936 20767 VIZIANAGARAM 10996 4227 4833 9582 29638 VISAKHAPATNAM 6374 2180 750 13049 22353 EAST GODAVARI 2950 1416 3530 7896 WEST GODAVARI 1350 6150 7500 KRISHNA 392 5041 977 3946 10356 GUNTUR 650 3763 678 5091 PRAKASHAM 4242 2651 2046 284 1131 10354 SPSR NELLORE 1489 1115 1002 798 148 5755 10307 YSR KADAPA 2600 1530 5196 394 3754 13474 11 KURNOOL 1359 2292 11391 5094 4929 25065 12 ANANTAPUR 25737 953 346 618 10907 4638 43199 13 CHITTOOR 26821 3602 1736 333 1881 3638 38011 Open Head Channels & Anicuts 68989 GRAND TOTAL 156908 38065 23421 11689 1050 22263 59604 313000

11 Target- Gap Ayacut to be Bridged during the year 2015-16 in Acres
STATEMENT SHOWING THE DISTRICT WISE PROPOSED AYACUT TO BE BRIDGED QUARTER WISE FOR YEAR UNDER MINOR IRRIGATION Sno. District Target- Gap Ayacut to be Bridged during the year in Acres 1St Quarter (Apr Jun 2015) 2nd Quarter (Jul Sep 2015) 3rd Quarter (Oct Dec 2015) 4th Quarter (Jan Mar 2016) 1 SRIKAKULAM 20767 2077 4153 6230 8307 2 VIZIANAGARAM 29638 2964 5928 8891 11855 3 VISAKHAPATNAM 22353 2235 4471 6706 8941 4 EAST GODAVARI 7896 790 1579 2369 3158 5 WEST GODAVARI 7500 750 1500 2250 3000 6 KRISHNA 10356 1036 2071 3107 4142 7 GUNTUR 5091 509 1018 1527 2036 8 PRAKASHAM 10354 1035 3106 9 SPSR NELLORE 10307 1031 2061 3092 4123 10 YSR KADAPA 13474 1347 2695 4042 5390 11 KURNOOL 25065 2507 5013 7520 10026 12 ANANTAPUR 43199 4320 8640 12960 17280 13 CHITTOOR 38011 3801 7602 11403 15204 Anicuts & open head channels 68989 6899 13798 20697 27596 GRAND TOTAL 313000 31300 62600 93900 125200 Or say in Lakh Acres 3.13 0.313 0.626 0.939 1.252

12 ACTION PLAN FOR THE YEAR 2015-16
S.No. District All Schemes   No of Schemes Total Aycut in Acres Amount Rs in Lakhs 1 SRIKAKULAM 1160 36433 32159 2 VIZIANAGARAM 1054 51996 28351 3 VISAKHAPATNAM 652 39216 19063 4 EAST GODAVARI 463 13853 11524 5 WEST GODAVARI 335 13158 16804 6 KRISHNA 253 18168 10370 7 GUNTUR 122 8932 3067 8 PRAKASAM 317 18165 11830 9 SPSR NELLORE 374 18082 14651 10 YSR KADAPA 591 23639 15016 11 KURNOOL 336 43974 7984 12 ANANTHAPUR 494 75788 14386 13 CHITTOOR 1136 66686 37142 Anicut & Open Head Channels 121033 TOTAL 7287 549123 222344 Total gap ayacut to be stabilized / bridged is 3.13 Lakh Acres (57% of total ayacut of 5.49 Lakh Acres)

13 Gap Ayacut to be Stabilized
TARGETS OF BOTH PHYSICAL AND FINANCIAL DURING : Sl.No Targets Physical Financial (Rs in Crores) No of Sources Gap Ayacut to be Stabilized (In Lakh acres) 1 7287 3.13 2223 The above physical and financial targets will be achieved by taking up the repairs, restoration and renovation of Minor Irrigation sources under different programmes. Total gap ayacut to be stabilized / bridged is 3.13 Lakh Acres (57% of total ayacut of 5.49 Lakh Acres

14 Gap Ayacut to be Bridged under Minor Irrigation
Unit of Measurement is in Thousand Acres. The progress as on is 37,000 Acres (37 Thousand Acres) The progress as on is 36,330 Acres (36.33 Thousand Acres) KEY PERFORMANCE INDICATORS: Irrigation of entire contemplated ayacut of Lakh Acres. Agricultural production which is output of irrigated agricultural system. Economic benefits derived from the Agricultural production. Sl. No. Indicator Unit of Measurement April - June July - September October - December January - March Target Progress 1 Gap Ayacut to be Bridged under Minor Irrigation in 000 Acres 31.3 37 62.6 36.33 93.9 125.2

15 49506 23518 73023 37000 AYACUT STABILISED IN ACRES DUE TO 1 3622 552
S NO DESILTING OF TANKS Taking up , repairs and construction of water harvesting structures TOTAL STABILISED UPTO 7/2015 AS ON 1 3622 552 4173 3376 807 2 3684 2367 6051 3990 2061 3 1926 530 2456 2077 395 4 1268 1188 1468 975 5 6829 1014 7843 5330 2513 6 4366 986 5352 4371 989 7 3462 1522 4984 3408 1577 8 2890 1953 4842 2482 2400 9 6928 469 7396 1498 5917 10 3261 1745 5005 1567 3441 11 3214 5696 2218 3598 12 1300 4529 5828 1110 4750 13 7490 3450 10940 4105 6908 49506 23518 73023 37000 36330

16 ACTION PLAN FOR FIVE YEARS 2015-20
S.No. District All Schemes No of Schemes Total Aycut in Acres Amount Rs in Lakhs 1 SRIKAKULAM 5766 355528 199054 2 VIZIANAGARAM 5469 319062 168939 3 VISAKHAPATNAM 3842 215450 139257 4 EAST GODAVARI 2150 151967 75915 5 WEST GODAVARI 1728 134167 78604 6 KRISHNA 1208 96567 54824 7 GUNTUR 573.5 54251 23466 8 PRAKASAM 1569.5 119089 62891 9 SPSR NELLORE 2064 160822 89223 10 YSR KADAPA 2374 147230 77819 11 KURNOOL 1106 94543 39049 12 ANANTHAPUR 2603 140655 86327 13 CHITTOOR 5853 340826 191884 TOTAL 36306 1) Out of Total ayacut of 25.6 lakh acres during Five (5) years plan 23.3 lakh acres will be stabilized 2) Out of 23.3 lakh acres the Gap ayacut is lakh acres i.e., 57%

17 Budget Estimate 2015-16 Rs. In Lakh S.No Head of Account
Normal State Plan a. General b. TSP c. SCSP d. MGNREGS Convergence 200.00 e. Estab. & Others 2 NABARD 3 AIBP +RRR CE/MI Total 4 MD, APSIDC CE MI Budget

18 Important activities to be undertaken
under the Neeru-Chettu sub-Mission: Inventory of existing water harvesting structures and repairs needed. Construct new water harvesting structures using remote sensing technology. Construction of targeted recharge structures (roof water harvesting, artificial recharge of aquifers and defunct wells). Restoration of major, medium and minor irrigation systems (repair of breach to structures and supply channels, desilting of tanks). Participatory Hydrological Monitoring (surface and groundwater) for community water audit and crop water budgeting. Promote sustainable water use by improved Irrigation and Agricultural practices.

19 NEERU - CHETTU DAILY PROGRESS REPORT
DESILTING OF TANKS Dt : S. No. District Tanks having ayacut more than 100 Acres (MI) Tanks having ayacut less than 100 Acres (PR) Total No of Tanks No. of Tanks desilting work in progress Total Quantity of silt Excavated No of excavators Deployed on Works taken by MI (By Machinery) Works taken by Farmers (By Machinery) Works Taken by RD (Mannual) by MI (Machinery) by Farmers (By Machinery) by RD(manual) Total Nos Cum 1 2 3 4 5 6 7 8 9 10 11 12 13 14 SRIKAKULAM 915 7639 8554 164 2001 2165 VIZIANAGARAM 944 8318 9262 178 3962 4140 891470 20 VISAKHAPATNAM 232 3111 3343 87 2873 2960 EAST GODAVARI 263 1253 1516 29 41 1183 384911 WEST GODAVARI 335 1054 1389 25 1316 1341 KRISHNA 248 663 911 259 82 480 821 540606 GUNTUR 81 213 294 134 47 970 1151 965122 792552 PRAKASAM 339 551 890 330 2267 2603 253778 SPSR NELLORE 722 984 1706 299 1548 1847 YSR KADAPA 234 1542 1776 121 5860 5982 7100 KURNOOL 157 454 611 194 6531 6725 18 ANANTHAPUR 303 2199 2502 568 653 1224 28740 982273 86 CHITTOOR 668 7395 8063 983 5542 6526 960 286 TOTAL 5441 35376 40817 3371 181 35186 38738 733

20 Status of Bills pertaining to Desilting of tanks
Dated : Rs In Lakhs SI.No District BILLS PAID SO FAR BILLS SENT TO PAO FOR PAYMENTS TOTAL VALUE OF WORK DONE 1 2 3 4 5 Srikakulam 182.63 Vizianagaram 432.93 0.00 496.32 Visakhapatnam 500.43 547.48 East Godavari 228.11 249.51 West Godavari 246.00 6 Krishna 68.00 7 Guntur 43.39 8 Prakasam 130.00 9 SPSR Nellore 873.87 10 Kadapa 518.00 71.00 806.64 11 kurnool 18.00 12 Ananthapuram 371.91 40.40 745.82 13 Chittoor 488.40 Grand Total

21 WORKS UNDER NORMAL STATE PLAN
Rs. In Lakh Total Expenditure up to : Rs Lakhs

22 Minor Irrigation - SCSP Works
Abstract of Spillover Works permitted by Govt. to continue during Amount in Lakhs and Ayacut in Acres Sl Name of District Works approved by Nodal Agency and Spillover to Works completed Works in Progress Remarks Nos Amount Ayacut 1 2 3 4 5 6 7 8 9 10 11 12 Srikakulam 86 380.20 1363 83 367.20 1314 13.00 49 Krishna 32 280.97 2962 26 239.97 1940 26.00 977 3 works deleted. Guntur 188.39 678 Nellore 129.40 566 Prakasam 14 69.99 2244 29.99 238 40.00 2006 Ananthapur 9.20 240 Chittoor 25 179.37 925 119.50 639 36.08 164 5 works deleted. Kadapa 63 752.90 3572 43 352.94 2676 20 399.96 896 Kurnool 169 851.56 11994 77.22 603 157 774.34 11391 Grand Total 405 24544 184 7410 213 16967

23 Minor Irrigation - TSP Works
Status of Works approved by Nodal Agency during and Spillover to Amount in Lakhs and Ayacut in Acres Sl Name of District Works approved by Nodal Agency during F.Y and Works completed Works in Progress Nos Cost Amount approved by N.A for Ayacut 1 2 3 4 5 6 7 8 9 10 11 12 Srikakulam 66 466.70 1900 18 114.98 509 48 351.72 1391 Vizianagaram 309.66 3377 0.00 Visakhapatnam 161.40 80.00 890 37.00 140 124.4 750 East Godavari 147 612.16 21498 54 239.08 6478 93 15020 West Godavari 15 215.80 5838 8616.9 Guntur 19.47 133 Prakasam 24 117.82 1160 27.76 258 90.06 902 Ananthapur 8.60 8.6 Chittoor 41 248.48 249.92 1409 37.37 347 33 211.11 1062 Kadapa 46 375.37 2373 86.66 456 37 288.71 1917 Grand Total 358 38626 96 542.85 8188 262 30438

24 Amount of Estimate Rs. in lakhs Expenditure Rs. in lakhs
WORKS UNDER NABARD SCHEME (TRANCHE XVI & XVII) Sl. No. Tranche No. year District No of Schemes Amount of Estimate Rs. in lakhs Ayacut in Ha Expenditure Rs. in lakhs Remarks 1 XVI Chittoor 7 Work proposed for conversion under NSP vide T.O lr.No. DCE-I/OT3/T3/NABARD- XVI & XVII/Dropping /2015 Dt: 2 Kurnool 806.01 464.18 157.84 3 XVII Srikakulam 482.55 341.97 178.66 4 Vizianagaram 350.00  291.38 0.00 Total:  11

25 WORKS UNDER NABARD SCHEME (TRANCHE XX)
Sl. No. District No. of Schemes Amount of Estimate Ayacut in HA No of works Rs. in Lakhs Agreement concluded and works started Tenders finalized, Agency finalized Agreement to be concluded Estimates sanctioned and tender process in progress Technical sanction to be accorded 1 Anantapuramu 15 11 3 2 Chittoor 14 10 YSR Kadapa 8 4 Kurnool 556.41 5 Nellore 139.00 60.00 6 Prakasam 135.42 115.00 7 Krishna 970.22 West Godavari 9 Srikakulam 975.00 950.00 TOTAL 49 32

26 WORKS PROPOSED UNDER NABARD SCHEME (TRANCHE XXI)
Sl. No. District No. of Schemes Amount of Estimate Ayacut in HA Remarks Rs. in Lakhs 1 Chittoor 3 2083 Proposal were submitted to the Finance Dept vide T.O Lr.No. DCE-I/OT3/T3/NABARD-XXI/2015 Dt for sanction. 2 Visakhapatnam 324 Srikakulam 501 4 Krishna 252 5 Ananthapur 19 606 6 Kurnool 76.000 121 7 Prakasam 1017 8 Vizinagaram 997 9 SPSR Nellore 90.000 246 10 Guntur 402 11 Kadapa 115 Total 41 6665

27 Minor Irrigation - Centrally Sponsored Schemes
ACCELERATED IRRIGATION BENEFIT PROGRAMME (AIBP) Rs. In Lakhs Sno. District Sanctioned Completed Works in progress No. of Schemes Cost year IP Proposed in acres IP Created in acres Status  RAYALASEEMA 1 Kurnool 307 637 Head works completed, Canal works are under progress 2 Chittoor 380 1310 549.37 Sub Total 687 1947 549.4 ANDHRA  3 Visakhapatnam 280 588 230.76 4 West Godavari 2410 3967 Work is in progress 5 Prakasam 4480 12235 374.12 2134 Work are under progress 7 7170 16790 604.9 2722 Total of Andhra & Rayalaseema 9 7857 18737 1154 4032

28 Total of Andhra & Rayalaseema
Minor Irrigation - Centrally Sponsored Schemes REPAIRS, RENOVATION & RESTORATION (RRR) Sl. No. District Sanctioned Completed Balance Works No. of Schemes Cost Year Agt. Value IP Stabilizati--on in acres IP Stabilized in acres Status Rayalaseema 1 ATP 138 2898 118 1564 & 26877 20 17-Progress 3-Terminated 2 CHT 56 1799 49 1028 8732 7 Works are in progress 3 KDP 47 1439 767.38 44 477 8681 4 KNL 78 2645 60 958 23649 18 8-Progress 5-Terminated 5- To be terminated Sub Total 319 8781 271 4027 67939 48 Andhra 5 SKLM 23 364 277.72 233 5,589 Total of Andhra & Rayalaseema 342 9145 291 4260 73528 51

29 Andhra Pradesh Irrigation and Livelihood Improvement Project (APILIP)
Objectives To increase agricultural production by constructing and rehabilitating irrigation facilities. Improving water management and agriculture practices, enhancing agricultural income. Alleviating the poverty. Project Scope Construction of new Minor irrigation Tanks : 1 No. (Prakasam District). Formation and Capacity Building of Project Water User Associations Support to Sector Reform (Trainings to Engineering staff) Consultation Services ( Nippon Koei company Ltd, Japan company (3rd party quality control))

30 APILIP –Andhra Pradesh Irrigation and Livelihood Improvement Project
The Project commenced with effect from 1st April – 2007. Loan Disbursement is upto July – 2016. AP outlay for Minor Irrigation Rs Cr. AP Government agreed extension of the project upto March-2016 and addressed the GoI. Project consists of 1 new Minor Irrigation Project for creation of Irrigation Potential 272 Acres. Status District No. of Projects Ayacut (Acres) Amount Rs. in Cr. PRAKASAM Formation of New Tank at G.Mekapadu, Byyanapalem(V) Kandukuru(M) 1 272 2.32 Head Works and Canals completed. Field Channels are in progress

31 Andhra Pradesh Community Based Tank Management Project
PROJECT DEVELOPMENT OBJECTIVE Selected tank based producers improve agricultural productivity and water user associations manage tank system effectively Rehabilitation of 975 MI tanks in A.P ( ). Project outlay is Rs crs, for AP Restoration of about 2.98 lakh Ac. Spread over 12 districts. Component 1 - Strengthening community based institutions Component 2 – Tank system Improvement Component 3 – Agriculture livelihood support services Component 4 – Project Management Dist. No. of Tanks Works completed Works on Going ATP 142 130 12 CTR 165 160 5 EGD 17 KDP 63 KRI 95 88 7 KNL 44 35 9 NLR 127 118 PKM 38 3 SKL 82 47 VSP 90 65 25 VZM 99 36 WGD 13 TOTAL 975 822 153

32 OVERVIEW (APCBTMP) Project commenced in July’ 2007 and extended up to July’2016. Approx. Project outlay is Rs crs. for the residual state of Andhra Pradesh. Civil Works for 975 tanks approved for Rs. 343 crs. to stabilize ayacut of 3.01 lakhs acres in 12 Districts. Out of 975 tanks , 822 Tanks work completed and 698 tanks were handed over to WUA for future maintenance. Cumulative expenditure is Rs Crs (Up to August 2015). BE for FY is Rs Crs. Expenditure during the year is Rs Crs upto August 2015.

33 MGNREGS Convergence Programme
Sl. No District No. of Works Works Completed Balance works Tank Nos Cost Rs in Lakhs Ayacut in ac 1 Vizianagaram 290 734.75 138 255.26 152 479.49 2 Visakapatnam 22 173.95 2371 14 112.30 8 61.65 3 East Godawari 58 580 2320 4 West Godawari 334 147 794.79 187 5 Krishna 184 140 44 707.17 6 Guntur 73 883.45 53 629.74 20 253.71 7 Prakasam 71 506.49 41 306.44 30 200.05 Nellore 251 1823.8 31361 174 77 394.03 9 Chittoor 388 32743 262 126 1343 10 Kadapa 427 21350 50 478.9 377 11 Anantapur 191 136 847.28 55 559.67 12 Kurnool 75 545.62 4875 Total 2364 1155 1209 Out of total 2364 works grounded , 1155nos of works are completed. 387 Nos of works are in progress and 822 Nos of works are not grounded, necessary relaxation orders on Finance Department UO Note Dated for all the works are awaited from the Government.

34 MEMOIRS OF SMALL TANKS Over View
About 35,376 No of small tanks having ayacut less than 40 Ha ( <100 Acres) all over Andhra Pradesh are transferred from Panchayat Raj Department to Minor Irrigation Department vide G.O. Ms. No. 216, PR & RD ( PROGS I) Dept Dt Government has decided to prepare Memoirs of these small tanks ( <100 Acres) as there is any permanent record on these tanks. It is proposed to take up Memoirs work in two phases i.e. (i) 10 – 40 Ha ayacut in First Phase and (ii) less than 10 Ha ayacut in second phase. The Government vide G.O. Rt. No.1157, I & CAD ( MI.IV) Dept, Dt has given Administrative Approval for Rs Crore for preparation of Phase-I Memoirs of 12,977 tanks by way of outsourcing. The Memoirs work was entrusted to 11 Agencies in 13 districts of Andhra Pradesh in Phase – I. The work is nearing completion and information regarding 9,659 tanks were uploaded by APSAC in their website as a part of TIS Project. Government vide G.O. Rt No.287 I&CAD (MIG-I) dept dt has given administrative approval for Rs crore for preparation of Phase-II memoirs of 22,399 tanks in second phase by way of outsourcing. The work is entrusted to 6 agencies and the same is under progress.

35 No. of Agencies entrusted
MEMOIRS OF SMALL TANKS Rupees in Lakhs Sl. no. Phase Sanctioned Completed Progress No. of Tanks Cost of Memoirs No. of Agencies entrusted 1 Phase - I having ayacut 10 to 40 Ha. 12977 1484 11 9435 914 3542 570 2 Phase - I having ayacut < 10 Ha. 22399 2311 6 TOTAL 35376 3795 16 25941 2881

36 Tank Information System – Status
Development of Tank Information System (TIS) for Andhra Pradesh through APSRAC Over View For Development of Tank Information System (TIS) in the State of Andhra Pradesh through Andhra Pradesh State Remote Sensing Applications Centre, Hyderabad administrative approval accorded vide G.O.Ms.No. 139 I & CAD (MI.Genl) Dept.Dated: under Normal State Plan Funds within the budget provision of M.I. for Rs lakhs (Rupees Five hundred ninety eight lakhs and sixty five thousand only). (Rs Lakhs for Residual A.P +Rs Lakhs for State of Telangana ). The main objective of the study is to develop and compile natural resources information related to catchment and command areas of tanks in Andhra Pradesh on 1:50,000/1:25,000 scale and assessment of run-off in each tank catchment using remote sensing, GIS and GPS techniques. Accordingly technical sanction was accorded for Rs Lakhs in C.E/M.I, Further the MoU was concluded with the Director (Technical) of APSRAC, Planning Department, Govt. of A.P, Hyderabad Tank Information System – Status Rupees in Lakhs Sanctioned Completed Progress No. of MI & PR Tanks Cost of Project Cost 41076 347.22 9789 86.8 31287 260.42

37 TRIAD (TANK RELIANT IRRIGATED AREA DEVELOPMENT)
Objective : It is proposed to study linkage of tanks i.e., Cascade system and to identify new tank sites using Remote Sensing. The Govt. Vide G.O.Ms,No.17, Dt: has sanctioned an amount of Rs Crore for preparation of Preliminary Project Report (PPR). Under this programme 5 Districts covered for preparation of preliminary project reports. 1) Vizainagaram 2) Visakhapatnam 3) Chittoor 4) Srikakulam 5) Anantapur TRAID project will cover tank reliant areas of the State. Initially Chittoor district has taken up on pilot basis for preparation of Tank cascade system development. The PPR preparation for five districts was entrusted to M/s APSRAC vide G.O.Ms.No.17, dt: The Government has issued an administrative approval for Rs lakhs for preparation of PPR for 5 districts. The M/s APSRAC has prepared draft preliminary project report (PPR) for 3 districts viz., Chittoor, Anantapur and Srikakulam and Rs. 4 crore paid to APSRAC as an advance for preparation of PPRs.

38 Representation for works received from Public Representatives
ABSTRACT Sl. No. District No. of Works Amount Rs. in Lakhs 1 Anantapuramu 322 17,445.33 2 Chittoor 420 19,604.96 3 East Godavari 5,169.20 4 Guntur 234.55 5 Kadapa 10 139.49 6 Krishna 53 2,435.75 7 Kurnool 135.25 8 Nellore 142 2,323.36 9 Prakasam 357 13,050.36 Srikakulam 25 237.18 11 Visakhapatnam 72 3,086.62 12 Vizianagaram 40 551.34 13 West Godavari 43 363.19 TOTAL: 1493 (or) Rs crores

39 Thank You