Starting From Scratch - Commissioning the First Thermal Hydrolysis Fed Digesters in North America
November 17, 2015 NC AWWA-WEA Annual conference Blue Plains AWTP Main Process Train Peter Loomis CDM Smith Engin Guven CDM Smith Christine deBarbadillo DC Water
2
Starting From Scratch – Commissioning the First Thermal Hydrolysis Fed Digesters in North America
Agenda Background and Objectives Startup Methodology Seeding and Ramp Up Findings
3
Background 2.2 million water and wastewater customers in DC
Annual operating budget $300M+ $3.8B 10 Year CIP 1,100 employees 8 Time Winner of National Association of Clean Water Agencies Gold Peak Performance Award DC Water is the largest power user in Washington, DC
4
Overview of Blue Plains AWTP
391 mgd average day capacity ~160 acres Largest Advanced WWTP in the world Serves DC, plus areas of Maryland and N. Virginia Advanced secondary treatment – filtration, N and P removal Discharge to Potomac
5
Main Process Train Project
Solids Blending Tanks Sludge Screening Pre-Dewatering Dewatered Sludge Storage and Pumping Thermal Hydrolysis (Cambi) Sludge Cooling Digestion Digested Sludge Transfer & Holding
6
Commissioning Objectives
Initiate seeding of digesters with Class A biosolids Maintain solids throughput (estimated at 300 dtpd at start of commissioning) Continue Class B land application until Class A achieved and approved
7
Startup Methodology Fill all digesters ~60% with water
Heat water to 100°F Continuous operation of HEX solids pumps for minimal mixing Transport sludge and fill remaining volume of two digesters with class A seed sludge (~1% solids in each digester) Continue heating digester with steam Begin mixing with draft tube mixers (startup mixers over 12 hour period) Begin feeding TH solids to first digester (overflow to adjacent digester) Ramp up solids based on VS in digesters
8
Seeding and Ramp Up Results
First digester lower solids concentration Initial sludge provided was more dilute Steam added water to digester Maintaining temperature required significant steam Initial decline of pH and Alkalinity Added alkalinity to first 2 digesters Rapid increase in alkalinity after two weeks
9
Seeding and Ramp Up Feed
10
Digester pH
11
Solids Concentration in Digesters
12
Alkalinity Trends
13
Digester Ammonia
14
Digester Cameras
15
Visible Differences
16
Understanding Foam Conditions
17
Observing Mixing Patterns & Foam
18
Digester Settling 1 minute 90 minutes hours
19
Hydrolyzed Sludge Settling
1 minute 90 minutes hours
20
Sludge feed to BFP
21
Polymer Dosing for Final Dewatering
22
Dewatered Solids Results
23
Capture efficiency remains excellent
24
Fecal Coliform Results (Dewatered Biosolids)
25
Sidestream Impacts Solids and ammonia loading increased gradually
Stabilized at approximately 5% solids and 2600 mg/L Ammonia Increased plant TKN load by 15% to 20% (~5 mg/L) Methanol use increased by 6000 gal/day DEMON facility under construction
26
Ammonia Load Return to Plant
27
Findings Supplemental Heat Required
Ramp up conservatively (max. 5% per day increase feed) Supplemental alkalinity allows faster ramp up (initial drop in pH) Digested solids not Class A for ~150 days (acclimatization) High VSR (60%+) Methane Concentrations 62%+ Reduced concentration is early sign of upset Ammonia elevated Rapid increases in feed can cause upset
28