Download presentation
Presentation is loading. Please wait.
Published byEllen Goodwin Modified over 9 years ago
1
No. 6 Winze Water Level 7100 Level - Existing Waste Pass Winze Bottom Water below 7400 L
2
New drift development with drill stations Drilling-Geotechnical Water level 7400 level 7400 level - Existing 7100 level No. 6 Winze Water below 7400l, Drilling, Dev.
3
7100 level 7400 level 7700 level Water level below 7700 level New drift development Drilling - Geotechnical Water below 7700L, Drilling, Dev.
4
7400L slashing complete Water pumped out and Dev. 7100L drift complete 7400L – New drift development 7700L – New drift development
5
7100L - complete 7400L drift complete 7700L - complete Vent Raise Air filtration and cooling Utilities Wash and change Equipment/wash Cafeteria/Refuge Core Homestake Underground LabCore Homestake Underground Lab.
6
7100L 7400L 7700L Refuge station Lab. Emergency drifts Ramp No.6 Winze Addition of first Detector Experiment
7
7100L 7400L7700L Future drift development Future Lab. No.6 winze Future Lab. Refuge station Future Development
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.