Presentation is loading. Please wait.

Presentation is loading. Please wait.

1 Instructions / Guidance This template is a reporting template for product updates or enhancements being promoted into operations. The OSPO SPSD Division.

Similar presentations


Presentation on theme: "1 Instructions / Guidance This template is a reporting template for product updates or enhancements being promoted into operations. The OSPO SPSD Division."— Presentation transcript:

1 1 Instructions / Guidance This template is a reporting template for product updates or enhancements being promoted into operations. The OSPO SPSD Division Chief or his representative will use this information to decide whether to promote a product enhancement into operations. These slides do not have to be briefed to the SPSRB. Routine modifications to an existing product that are handled through the NESDIS OSPO change management process do not have to be briefed to the SPSRB, unless directed by OSPO management or requested by the SPSRB. The template is a guide and may require tailoring. However, adherence to the briefing outline is recommended because it ensures the OSPO is presented the information needed to make decisions. Guidance is contained in the notes page. You can access the notes page by selecting “View” and “Notes Page” from the main menu. Delete this slide before you send your brief to ─ Tom Schott ─ Stacy Bunin ─ SPSD Division Chief (Dave Benner) ─ SPB Branch Chief (Antonio “Ricky” Irving) ─ SPSRB Executive Secretary and SPSRB Manager V2 15 Jan 2015

2 2 OSPO Operational Promotion Report on the Product Enhancement for “project name” Project Lead(s): Name and Office Month Day, Year V2 15 Jan 2015

3 3 Background Project Lead(s): Project Name: Product Deliverable Name(s): Operational Center: Product Phase Dates: ─ MMM YYYY Development Phase Began ─ MMM YYYY Pre-operational Phase Began ─ MMM YYYY Operational Phase Began V2 15 Jan 2015

4 4 Background, Benefit, and Image/Plot V2 15 Jan 2015

5 5 Promotion Checklist #IPT Lead is responsible for completing these items Completed? / Comments? 1User coordination, endorsement, and approval 2Oversight Panel coordination, endorsement, and approval 3Implementation on primary and backup operational systems 4Implementation on distribution system(s) including archives if appropriate 5Documentation completion and/or updating 6Implementation of monitoring procedures 7Receive Office/Division Chief approval to declare operational status 8Announcement of operational enhancement promotion in Office/Division weekly/monthly reports 9Provide this completed briefing to Tom Schott Stacy Bunin SPSD Division Chief (Dave Benner) SPB Branch Chief (Antonio “Ricky” Irving) SPSRB Executive Secretary and SPSRB Manager V2 15 Jan 2015

6 6 Product Deliverable Details Product Type and Number Product Delivery/Tracking Name Environmental Observational Parameters SatellitesSensorsN#N# E#E# R#R# T#T# O#O# Tailoring Options or Comments Formats: Coverage areas: Resolutions: Update cycle: Other: Formats: Coverage areas: Resolutions: Update cycle: Other: Formats: Coverage areas: Resolutions: Update cycle: Other: Formats: Coverage areas: Resolutions: Update cycle: Other: N=New E=Enhanced R=Replacement T=Tailored O=Other V2 15 Jan 2015

7 PATRON Application Name Short Name Status Support Level User Impact Notification Tier Approval Level Escalation Tier Application Type Description * Satellites Instrument * Channels System CIP 7 * Items in green are needed to update SPEEDS V2 15 Jan 2015

8 PATRON Product Name Short Name Application Short Name Status Support Level Format Primary Use Description Output Filenames * Projected date to go operational * Horizontal resolution * Vertical resolution * Frequency * Coverage * Accuracy * Product Oversight Panel * Users * Web page * Archive 8 * Items in green are needed to update SPEEDS V2 15 Jan 2015

9 9 SPSRB User Request Status Has the SPSRB user request been fully satisfied? V2 15 Jan 2015


Download ppt "1 Instructions / Guidance This template is a reporting template for product updates or enhancements being promoted into operations. The OSPO SPSD Division."

Similar presentations


Ads by Google