Presentation is loading. Please wait.

Presentation is loading. Please wait.

RESEARCH AND DEVELOPMENT FOR SPEED-UP OF SHINKANSEN NORIMICHI KUMAGAI Ph.D. Director Railway Technical Research Institute, JAPAN EURAILSPEED 2005 Railway.

Similar presentations


Presentation on theme: "RESEARCH AND DEVELOPMENT FOR SPEED-UP OF SHINKANSEN NORIMICHI KUMAGAI Ph.D. Director Railway Technical Research Institute, JAPAN EURAILSPEED 2005 Railway."— Presentation transcript:

1 RESEARCH AND DEVELOPMENT FOR SPEED-UP OF SHINKANSEN NORIMICHI KUMAGAI Ph.D. Director Railway Technical Research Institute, JAPAN EURAILSPEED 2005 Railway Technical Research Institute - ROLE OF FUNDAMENTAL RESEARCH -

2 Commercial Speeds of Shinkansen and of World Experimental Speed Records TGV 380km/h TGV 515.3km/h ICE 406.9km/h STAR21 425km/h 300X 443km/h 210km/h 220km/h 240km/h 230km/h 270km/h Tohoku ・ Joetsu Tokaido ・ Sanyo Win 350 350.4km/h 300km/h 275km/h 300series 325.7km/h : Experimental records

3 Proven Technologies >Safety: Automatic Train Control New Bogie / Suspension All Electric Brake >Comfort: Airtight Cabin >Adhesion: Traction Power Dispersion New issues >Environmental Measures against: Aerodynamic Noise Aerodynamic Vibration >Energy Consumption: Light Weight Rolling Stocks >Safety against Earthquake: P-wave Detection/Alarm System Key Technologies for Shinkansen Systems First Shinkansen Over 300km/h Shinkansen

4 Experimental Analysis by Wind Tunnel 1/12 train model Newly-developed elliptical acoustic mirror Aerodynamic Noise Search for noise sources around vehicle body Sound pressure level

5 Reduction of Micro-pressure Waves Proposed basic train head to minimize micro-pressure Measurement of waves by model Pressure Tunnel Distance Train Micro- pressure wave Compression wave Tunnel entrance hood to reduce micro-pressure (69m) Micro-pressure wave propagation in tunnel Aerodynamic Noise >Measures >Phenomena

6 Aerodynamic Simulation and Experiment on Pantograph for Noise Reduction Noise level 3-Dimntional Surface pressure Fluctuation pressure Mean pressure Numerical Simulation : Wind Tunnel Test : Aerodynamic Noise

7 Running direction Tunnel Simulation of Unsteady Flow Numerical Analysis of Aerodynamic Force on Train in Tunnel Vortex Distribution Vortex Unsymmetrical flow causes aerodynamic lateral forces and vibration Aerodynamic Vibration

8 Semi-Active Damper Semi-Active Suspension to Reduce Aerodynamic Lateral Vibration in Tunnel Accelerometer Controller Imaginary wall Semi-Active Damper Imaginary damping force is used for control. Semi-active damper decreases aerodynamic vibration level up to 5 dB. Aerodynamic Vibration

9 Earlier Detection of P-Wave and Alarm System against Severe Earthquake S-wave: P-wave (preliminary tremor) detection Damage occurrence Seismograph Propagation of Waves P-wave S-wave Alarm within 3 seconds Earthquake Ocean Alarm Feeding Stop Alarm before damage of rail Emergency Braking Safety against Earthquake

10 Contribution of Fundamental Research to High-speed Shinkansen Over 300km/h Trainsets Conventional Trainsets Problems measures Analysis/ Simulation Experiments/ Apparatus Fundamental Research Decision Onboard test Fundamental research is very important to make decision.


Download ppt "RESEARCH AND DEVELOPMENT FOR SPEED-UP OF SHINKANSEN NORIMICHI KUMAGAI Ph.D. Director Railway Technical Research Institute, JAPAN EURAILSPEED 2005 Railway."

Similar presentations


Ads by Google