PROJECT SCOPE OVERVIEW SR 60/E Kennedy Blvd From N Nebraska Ave To N Ashley St FPN 436491-1-32-01 PRESENTER: LIYANAGE INDIKE RATNAYAKE SEPTEMBER 04, 2015 Florida Department of TRANSPORTATION Florida Department of Transportation
2
Preserve existing pavement and improve ride quality through Milling and Resurfacing Enhance Safety and Mobility of the project corridor while accommodating all modes of transportation Minimize inconvenience to travelling public Achieve efficient design through application of Practical Design Guidelines PROJECT INFORMATION Florida Department of Transportation Project Objectives
3
Milling and Resurfacing Work Types 3.1- Minor Highway Design 4.1.1 – Miscellaneous Structures 6.3.1 – ITS Analysis & Design 7.1 – Signing and Pavement Marking 7.3 - Signalization Total project length: 0.580 Miles From MP 0.010 (west radius return of Nebraska Ave) to 0.590 (east radius return of Ashley St) Ties into project FPID 434841-1 (in-house, March 2017 Letting) PROJECT INFORMATION Florida Department of Transportation Project Overview
4
Current Design Schedule: 18 Months Letting Date: 12/26/2017 Funded for Design and Construction (Federal) Some Improvements under Federal Safety Funds Current PPR Estimate: $ 742,472.00 Designated as BDI (Business Development Initiative) for design PROJECT INFORMATION Florida Department of Transportation Project Overview
5
END PROJECT BEGIN PROJECT PROJECT INFORMATION Florida Department of Transportation Project Location
6
Urban multi-lane, One-way, variable width, curb and gutter with parking Sidewalks on both sides No designated Bike Lanes Mid-block crosswalks Several signalized intersections Patterned pavements and sidewalks Granite curbs Access Management Classification: 7 PROJECT INFORMATION Florida Department of Transportation Existing Conditions
7
Traffic Data PROJECT INFORMATION Florida Department of Transportation
8
Pavement Data Base Materials: Limerock, shell, concrete, and brick. Average asphalt thickness: 4.5 inches (2.9 inches minimum and 4.5 inches maximum) Pavement Condition Survey results: PROJECT INFORMATION Florida Department of Transportation
9
PROJECT INFORMATION Florida Department of Transportation Typical Section
10
Crash Data Total 24 crashes between 2011 and 2013 No Fatalities 30% Injury Crashes No Pedestrian and Bicyclist crashes PROJECT INFORMATION Florida Department of Transportation
11
Milling and Resurfacing Cross slope corrections ADA improvements to sidewalks and curb ramps Address Sight Distance issues at intersections PROPOSED SCOPE OF WORK Florida Department of Transportation Roadway
12
Bulb-outs at Signalized Intersections Enhance pedestrian safety Tampa St, Franklin St, Florida Ave, Marion St, Morgan St, Pierce St Drainage and utility impacts PROPOSED SCOPE OF WORK Florida Department of Transportation Roadway Parking Sidewalk Curb Ramps X-Walks
13
Improvements at Lee Roy Selmon Expressway Off Ramp Existing flexible delineators damaged by vehicles crossing over Alternative Analysis to make recommendations PROPOSED SCOPE OF WORK Florida Department of Transportation Roadway
14
No major flooding complaints Minor Drainage improvements as needed Address ponding along walkways and curb returns Potential impacts due to proposed bulb-outs PROPOSED SCOPE OF WORK Florida Department of Transportation Drainage
15
Deficiencies in Bicyclist Accommodations Deficiencies in Cross Slope Deficiencies in Gutter Grade PROPOSED SCOPE OF WORK Florida Department of Transportation Anticipated Variations & Exceptions
16
Project located in Downtown Tampa Several stakeholders City of Tampa, Hillsborough County, HART, several UOA’s, Several Businesses Community Awareness Plan Project Fact sheet, Project Brochure, Elected Official Notifications Design Open House PROPOSED SCOPE OF WORK Florida Department of Transportation Public Involvement
17
High pedestrian volumes Major Transit Route Consideration to Special Events PROPOSED SCOPE OF WORK Florida Department of Transportation Temporary Traffic Control Plan
18
Update S&M throughout the corridor including parking areas and bus stops Update signal clearance timings Overhead sign panel modifications PROPOSED SCOPE OF WORK Florida Department of Transportation Signing and Markings/Signalization
19
Upgrade signing for mid-block crossings Advance warning signs including RRFB’s PROPOSED SCOPE OF WORK Florida Department of Transportation Signing and Markings/Signalization
20
Upgrade signing and markings on Lee Roy Selmon Expressway off Ramp Wrong Way Traffic Control features Speed Feedback Signs PROPOSED SCOPE OF WORK Florida Department of Transportation Signing and Markings/Signalization
21
Coordination with several UAO’s Fiberlight LLC, Deltacom, FPL Fibernet LLC, Verizon, Hillsborough County ITS, Hillsborough County Clerck of Circuit CO, Hillsborough County Traffic Service, Level 3 Communications LLC, MCI, TECO Peoples Gas, City of Tampa Water Department, City of Tampa Transportation, City of Tampa Water (Sewer), Tampa Electric Company, Bright House Networks, Sprint Nextel, XO Communications. FDOT and COT ITS (Fiber Optic Cables) in the vicinity No ITS work anticipated (Optional Services if needed) PROPOSED SCOPE OF WORK Florida Department of Transportation Utilities
22
Minor structures involvement Overhead sign structure evaluation PROPOSED SCOPE OF WORK Florida Department of Transportation Structures Provided by the Department Surveying & Mapping, SUE, Geotechnical
23
Project information available in Department’s Publicly- Accessible websites DRAFT Scope: ftp://ftp.dot.state.fl.us/LTS/D7/Procurement/PSU/Scopes/Drafts/ Project Intelligence: ftp://ftp.dot.state.fl.us/LTS/D7/Development/ProjMgmt/ProjectIntelligence/ OTHER INFORMATION Florida Department of Transportation
24
FDOT Project Manager: Liyanage “Indike” Ratnayake FDOT Technical Review Committee Members: Rochelle Garrett Daniel Lauricello Lilliam Escalera Professional Services Contract Administrator Nikitra King OTHER INFORMATION Florida Department of Transportation
25
Selection Procedure Letter of Response and Interview Important Dates Marketing Meeting Date: September 08 th, 2015; 08:30 AM to 12:00PM Advertisement Date: 14SEP2015 Longlist (TRC) Date: 19OCT2015 Shortlist Selection Date: 27OCT2015 TRC Meeting Date: 19NOV2015 Final Selection Meeting Date: 08DEC2015 1st Negotiations Meeting Date: 21DEC2015 OTHER INFORMATION Florida Department of Transportation
26
THANK YOU! QUESTIONS??? Florida Department of TRANSPORTATION Florida Department of Transportation