Security WG: Report of the Spring 2010 Meeting Renaissance Hotel Portsmouth, VA May 7, 2010 Howard Weiss NASA/JPL/Cobham Howard.weiss@cobham.com +1-443-430-8089
2
Meeting Agenda 4 May 2010 (09:00 – 17:00) – Welcome, opening remarks, logistics, agenda bashing, introduction for new attendees – Review results of Fall 2009 meeting – High-level Document Status (security architecture, algorithms, key management, mission planners, glossary) – Review CWE WG entries: charter, programs, schedules – Meet w/SANA – BNSC becomes the UK Space Agency (Black) – Security Architecture FINAL review (Black) – Algorithm Document review (Weiss) – Think about testing for Yellow Book – Authenticated Encryption Algorithms (Aguilar-Sanchez) – Glossary Review (Weiss)
3
Meeting Agenda (cont) 5 May 2010 (09:00 – 17:00) – Mission Planner’s Guide (Biggerstaff) – Key Management (Fischer/Sanchez-Aguilar) » Identity-Based Key Management (Birrane) – Network Layer Security (Pajevski/Weiss) – Link Layer Security (Weiss/all) – Other areas of discussion – New work areas 6 May 2010 – 09:00-17:00: Space Data Link Security WG 7 May 2010 – 09:00-12:30: Space Data Link Security WG – 13:00-17:00: SEA Wrap-up Plenary
4
Attendance NameOrganizationEmail Address Howard Weiss (Chair)NASA/JPL/Cobhamhoward.weiss@sparta.com Mark StablesBNSC/Logicamark.stables@logica.com Daniel FischerESA/ESOCdaniel.fischer@esa.int Martin PilgramDLRmartin.pilgram@dlr.de Lorenzo ChessaASIlorenzo.chessa@asi.it Clayton SigmanNASA/GSFCclayton.sigman@nasa.gov Craig BiggerstaffNASA/JSC/Lockheedcraig.biggerstaff-1@nasa.gov Mike PajevskiNASA/JPLmichael.j.pajevski@nasa.gov Ignacio Aguilar-SanchezESA/ESTECignacio.Aguilar.Sanchez@esa.int Fred StillwagenNASA/LaRCfrederic.h.stillwagen@nasa.gov Marc BlanchetCSA/Viageniemarc.blanchet@viagenie.ca
5
Executive Summary Attendees from UKSA, ESA/ESTEC, ESA/ESOC, DLR, ASI, CSA, NASA/GSFC, NASA/JSC, and NASA/JPL. No attendees from CNES. Charter revisions will be discussed via email. Discussed BNSC becoming the UK Space Agency (UKSA). Discussed SecWG contributions/use of SANA (algorithm IDs, glossary) Reviewed the Security Architecture – we will submit as WG final. Reviewed Algorithm Blue Book – not too many comments. Decided to take Security Glossary review to email. Reviewed Mission Planners Guide – minor edits and then final. Reviewed key management. Green Book has editorial edits. Discussed KM Blue Book. Just getting started. Discussed Identity-based keying and Erasure Coding. Discussed network layer security. Two books: Green to “describe” the IPsec profile for CCSDS and Blue/Magenta to “define” the profile. Telecon to be held in early Sept.
6
Summary of Goals and Deliverables 1. Update & evolve the charter. 2. Security Architecture submit as final after edits. 3. Algorithm document moving well. Move to Red at next mtg. Need to get started on Yellow Book for testing. 4. Mission Planners Guide – minor edits and then to Secretariat. 5. Key Management green book – minor edits and then to Secretariat. 6. KM Blue Book for symmetric KM just starting. White book in London. 7. Security glossary – aiming for completion by London. 8. Network layer security – White Book (green) by London.
7
SEA Area MID-TERM REPORT SUMMARY TECHNICAL STATUS 1.Security WG Goal: Working Status: Active _X_ Idle ____ Summary progress: Seven documents actively being produced (Glossary, Key Management (2), Mission Planners Guide, Algorithms, Network Layer). All docs green. Progress since last meeting: Security Architecture doc final edits, mission planners guide and KM Green completed final edits. Problems and Issues: Resources – Excellent right now but need to ensure continued participation from all member agencies status:OKCAUTIONPROBLEM Comment: Working Group is advancing and producing good products. Docs OK.
8
Near-Term Schedule DeliverableMilestoneDate Charter Revision Include WG “roadmap”08/10 Algorithm Blue Book Clean up descriptive material into notes, discussion & capture for Green Book 09/10 Key Management Green Book Revise with final edits and then submit to Secretariat 06/10 Key Management Blue Book Changed from Magenta to Blue Book. Create a symmetric KM BB White Book for next mtg 09/10
9
Near-Term Schedule (cont) Mission Planners Security Guide Final edits Submit to Secretariat Common Criteria Protection Profiles On holdTBD Application Layer Security On holdTBD Network Layer SecurityWhite Book (Green)09/10 Security WG Overview & Capabilities Presentation Create WG overview as basis for explaining capabilities to other WG In process
10
Open Issues None
11
Action Items Item NumberAction Item:Assigned to:Date Due: SecWG0510:1Revise/edit Security ArchitectureMark Stables05/30/10 SecWG0510:2Revise/edit Algorithm documentHoward Weiss09/30/10 SecWG0510:3Agencies need to obtain resources for algorithm testing All10/15/10 SecWG0510:4Investigate ISO 19972 alternatives for other encryption algorithms/modes. Ignacio Aguilar Sanchez and Howard Weiss 10/30/10 SecWG0510:5Resend Security Glossary to WG for review & comments Howard Weiss05/15/10 SecWG0510:6Obtain a document number for Algorithms document & provide to Craig Biggerstaff for inclusion in Mission Planner’s Guide Howard Weiss05/15/10
12
Action Items (2) SecWG0510:7Perform final edits on Mission Planner’s Guide and submit to Secretariat editor. Craig Biggerstaff06/30/10 SecWG0510:8Write Network Layer Security Profile white book (green) Mike Pajevski and Howard Weiss 09/30/10 SecWG0510:9Email draft charter changes to WG for comments & discussion Howard Weiss05/07/10 SecWG0510:10Advise Secretariat that PDF documents do not allow comments to be embedded Martin Pilgram05/30/10 SecWG0510:11Ensure that security glossaries currently in SecWG documents are consistent with one another Howard Weiss & Tom Gannett On-going SecWG0510:12Set up telecon for Sept 2010Howard Weiss08/15/10
13
Resource Problems Resources are adequate to perform the current tasks. However, testing will require additional resources (or redirection of current resources)
14
Risk Management Update Must ensure that the current trend of additional resources remains and that resources don’t shrink.
15
Cross Area WG / BOF Issues Joint meeting with Space Data Link Security WG
16
Resolutions to be Sent to CESG and Then to CMC None
17
New Working Items, New BOFs, etc. Network Layer Green + Blue/Magenta “profiles”