ALICE TPC Gas Control System (toward the first fully implemented LHC gas system) S. Haider EP-TA1-GS
2
ALICE TPC gas system status, JCOP2 18.6.2003 S.Haider EP/TA1 Outline Status What did we learn so far Future Conclusion
3
ALICE TPC gas system status, JCOP3 18.6.2003 S.Haider EP/TA1 Project status (June 2003) Gas HWe-boxPLCPVSScommissioned Mixer Pump CO2-rem. 80%0% Purifier 60%80%0% Distribution 0% Analysis 30%0% Exhaust 0% Backup 30%00% Test in 167 20% of Gas HW 100% done
4
ALICE TPC gas system status, JCOP4 18.6.2003 S.Haider EP/TA1 PVSS Schneider PLC Quantum Schneider PLC Premium Ethernet ProfiBUS WAGO I/O modules Bronkhorst Digital Mass Flow Controllers Control Architecture (for Mixer)
5
ALICE TPC gas system status, JCOP5 18.6.2003 S.Haider EP/TA1 Typical 2 gas Mixer Control box,- ProfiBUS WAGO interface
6
ALICE TPC gas system status, JCOP6 18.6.2003 S.Haider EP/TA1 ALICE TPC Mixer rack ProfiBUS-daisy-chain of 4 Mass Flow Controllers
7
ALICE TPC gas system status, JCOP7 18.6.2003 S.Haider EP/TA1 Using UNICOS… Premium and Quantum (with UNICOS + GCS extension) PVSS (Unicos Beta3 and GCS extensions) Mass Flow Controller, Analog Valve and Frequency controller were originally not in UNICOS (developed by IT/CO)
8
ALICE TPC gas system status, JCOP8 18.6.2003 S.Haider EP/TA1
9
ALICE TPC gas system status, JCOP9 18.6.2003 S.Haider EP/TA1 Window tree Modules
10
ALICE TPC gas system status, JCOP10 18.6.2003 S.Haider EP/TA1 M
11
ALICE TPC gas system status, JCOP11 18.6.2003 S.Haider EP/TA1 Modes of operation
12
ALICE TPC gas system status, JCOP12 18.6.2003 S.Haider EP/TA1
13
ALICE TPC gas system status, JCOP13 18.6.2003 S.Haider EP/TA1
14
ALICE TPC gas system status, JCOP14 18.6.2003 S.Haider EP/TA1
15
ALICE TPC gas system status, JCOP15 18.6.2003 S.Haider EP/TA1 What did we learn so far? (1/3) Development Gas racks and software can be prepared in parallel Simplified HW drawings were necessary for user panels SW was tested in the lab without the gas HW ready Process control Validation of UR states, alarms, commands, etc Validation of PLC code design Validation of the UNICOS concept for gas control UNICOS not easy to start with!
16
ALICE TPC gas system status, JCOP16 18.6.2003 S.Haider EP/TA1 What did we learn so far? (2/3) PVSS UNICOS Beta version,- but most of functionality available (~80%) Validation of window layers, navigation menus etc… Long way to go for trending !!! Operation Common look and feel of all Process Control Objects (PCO) Access of objects in Auto/Manual mode Recipes for constants, alarms and parameters FSM based operation
17
ALICE TPC gas system status, JCOP17 18.6.2003 S.Haider EP/TA1 What did we learn so far? (3/3) Commissioning After short introduction we were able to operate and fine tune process parameters without the help of the developers Easily understandable menu structures and concepts of operation FAST! Took only about 1 week!
18
ALICE TPC gas system status, JCOP18 18.6.2003 S.Haider EP/TA1 Future plans Alice TPC Remaining Racks System integration In 167 with dummy volume Validation of interaction UR identification for top module UNICOS Porting to UNICOS PVSS release (before system integration)
19
ALICE TPC gas system status, JCOP19 18.6.2003 S.Haider EP/TA1 GCS framework Once developed, ALICE TPC will be ported to this gas framework Rem: Some gas framework components are already used Low level objects in PLC and PVSS Synoptic of PVSS Recipes…
20
ALICE TPC gas system status, JCOP20 18.6.2003 S.Haider EP/TA1 Conclusion The first “Vertical Gas Slice” with final architecture was successfully implemented and tested. (Visits welcome) We validated: URD, UNICOS for gas, PLC code generation, PVSS, operation issues, PID regulation etc.. Started development of Gas Frame Work with the experience gained