Presentation is loading. Please wait.

Presentation is loading. Please wait.

 Nationwide Plumbing  Three Parts:  Project 1: DW Design, Implementation, ETL  Project 2: Multidimensional Cube Implementation, Analysis  Project.

Similar presentations


Presentation on theme: " Nationwide Plumbing  Three Parts:  Project 1: DW Design, Implementation, ETL  Project 2: Multidimensional Cube Implementation, Analysis  Project."— Presentation transcript:

1

2  Nationwide Plumbing  Three Parts:  Project 1: DW Design, Implementation, ETL  Project 2: Multidimensional Cube Implementation, Analysis  Project 3: Desktop Analyses; Reporting, Data Mining  Project printouts must be turned in, stapled  Ensure professional look, organization, read  Project contents must also be stored on assigned classroom computer

3  DW Design, Implementation, ETL › Dimensional Model  Visio › DW Creation  SSMS (SQL Script) › Data Profiling  SSIS › Logical ETL Design (Transformations)  Excel › Physical ETL Design & Implementation  SSIS

4  Multidimensional Cube Implementation, Analysis › Cube Implementation  SSAS › Data Analysis  SSAS

5  Desktop Analyses; Reporting, Mining › Data Analysis and Reporting  Excel Pivot table(s)  Excel Chart(s) › Reporting  SSRS › Data Mining  SSAS (e.g., Decision Tree, Cluster Analysis, and/or MBA) › Executive Summary of Project  Word

6  Each assignment evaluated on: › Completeness, Accuracy,100% Writing, Appearance, Organization, Quality of documentation, Creativity, Innovation › No formal peer assessments; BUT email me if there are issues regarding contributions. Insufficient contribution WILL impact your grade.


Download ppt " Nationwide Plumbing  Three Parts:  Project 1: DW Design, Implementation, ETL  Project 2: Multidimensional Cube Implementation, Analysis  Project."

Similar presentations


Ads by Google