Camargo_BR_Author_ALPHA4_BLOCK3 Barcelona 12-15 May 2003 1 OPERATIONAL PROCEDURES FOR CONNECTION OF AUTOPRODUCERS AND INDEPENDENT POWER PRODUCERS IN THE DISTRIBUTION NET A Brazilian experience. A ELEKTRO success case.
2
Camargo_BR_Author_ALPHA4_BLOCK3 Barcelona 12-15 May 2003 2 Oceano Atlântico MINAS GERAIS PARANÁ MATO GROSSO DO SUL SÃO PAULO A Brazilian electric distribution power utilities: Population: 6 million - 1,8 million of customers 228 cities in 2 Brazilian states 600 feeders in 119 substations 1,5 million of poles and 110.000 transformers 90.000 km of distribution net 1.346 km of transmission lines Who is ELEKTRO ?
3
Camargo_BR_Author_ALPHA4_BLOCK3 Barcelona 12-15 May 2003 3 Distributed Generation New energy producers Change of electric model in Brazil New connections in distribution net Lack of procedures report or legislation in Brazil Extremely scarce time (Brazilian crisis). Elektro Case: Motivation Elektro Case: Motivation
4
Camargo_BR_Author_ALPHA4_BLOCK3 Barcelona 12-15 May 2003 4 Relationship with the new producer The people´s and the system safety Project evaluation and local implantation Protection and grounding system is analysed Connection point between the two systems. Elektro Case: Main Points Elektro Case: Main Points
5
Camargo_BR_Author_ALPHA4_BLOCK3 Barcelona 12-15 May 2003 5 The process is made possible That work is being published in Brazil. Elektro Case: Conclusion Elektro Case: Conclusion GOAL !!! Connections evolution of independent producers or autoproducers connected to the ELEKTRO distribution net.
6
Camargo_BR_Author_ALPHA4_BLOCK3 Barcelona 12-15 May 2003 6 Author: CAMARGO, Dirceu B. Co-author: LOPES, Carlos H. C. ELEKTRO Eletricidade e Serviços S.A ELEKTRO Eletricidade e Serviços S.A. Phone: +55 19 3726 1233 dcamargo@elektro.com.br E-mail: dcamargo@elektro.com.br Other information: