Presentation is loading. Please wait.

Presentation is loading. Please wait.

Waldo Colas, forecaster, National meteorological center RA-IV WIGOS Implementation Workshop (English), 1 - 3 December, Willemstad.

Similar presentations


Presentation on theme: "Waldo Colas, forecaster, National meteorological center RA-IV WIGOS Implementation Workshop (English), 1 - 3 December, Willemstad."— Presentation transcript:

1 Waldo Colas, forecaster, National meteorological center Email : Colasdo@yahoo.fr RA-IV WIGOS Implementation Workshop (English), 1 - 3 December, Willemstad Curaçao (Haïti)

2 Outline of the presentation 1.Mission of the CNM and SNRE 2.National Observing Issues or Needs 3.Plans for the observing networks 4. Major needs and gaps in observing capabilities and access 5. WIGOS Implementation Status 6. Summary

3 Mission of the CNM and SNRE Hydro meteorological services in Haiti are provided by two actors 1. CNM 2. SNRE Both depend on the Ministry of Agriculture, Natural Resources and Rural Development (MARNDR). they working separately.

4 Mission of the CNM and SNRE the have mission to : Insure and coordinate the meteorological, climatological and hydrological activities on the national territory. But for lack of assistance, this mission is very difficult.

5 Mission of the CNM and SNRE 1. is often coming during the Hurricane season from(June to November): The weather during this period is characterized by the passage of tropical waves, tropical storm or hurricanes near or over the country. In This period we register the strongest accumulations of rains and strong gust winds. Losses of human life and materials are always catastrophic. Major historical meteorological disaster events

6 Mission of the CNM and SNRE THIS BOARD GIVES SOME IDEAS ABOUT THE MAJOR WEATHER PHENOMENA ON HAÏTI Mames Phenomenon Affected areas Dead 1963 Flora Hurricane Cayes, Jéremie,Nippe,l’Ouest. 5000 1964 Cleo Hurricane Jérémie, Cayes. 192 1966 Inez HurricaneCayes, Jérémie,Nippes, L’Ouest. 700 1980 AllenHurricaneCayes, Jérémie200 1994 Gordon Hurricane Jéremie, Port-de-paix sud-est, Cayes. 2000 1998 GeorgeHurricaneJacmel, Port de paix.147 2008 Hanna tropical stormGonaïves, Fonds- Verrettes. 3000 2010 Thomas Hurricane Jérémie, Cayes, Port de paix.30 Hurricane flora was responsible for 5 Thousands deaths and approximately $ 10 million in damages. 19

7 Mission of the CNM and SNRE Hurricane Flora (1963) and Inez (1966) This some trajectories

8 Mission of the NMHS Hurricane Gordon (1994) and Hanna (2008)

9 2.Frontology period Frontology period (December to April). can occur some severe flooding in the north area of the country.. Mission of the NMHS

10 the Technical staff in cnm is consisting by: Geologist, Civil Engineer, Meteorologist, and eletronician. It is a very small staff Around 23 people are working there Mission of the NMHS

11 The Technical staff in SNRE is consisting by: Geologist, Civil Engineer, hydrogeologist, Hydrologist : It is a very very small too with Around 23 people Mission of the CNM and SNRE

12 NATIONAL OBSERVING ISSUES OR NEEDS INVENTORY OF all STATIONS *Network CNM -2 Operational Synoptic stations approved by WMO - 4 more stations will be add this month *The network of National Early Warning Program of MARDR -17 rainfall stations -4 Hydro and rainfall -35 Hydro * Networks of CNIGS (the National Centre for Geo Spatial Information) 10 Automatic Stations 14 manual rainfall stations Networks of CNSA (National Coordination for Food Security) has some rains stations

13 NATIONAL OBSERVING ISSUES OR NEEDS This map gives the localisation of those station

14 unfortunately Several of these stations are silent for different reasons: 1.Technical, 2.Economical. NATIONAL OBSERVING ISSUES OR NEEDS

15 - The is not a national database in Haiti, every institution works and stocks their own data. it is serious problem. -The data and metadata could be dificult to share. In this case with the hydromet project we plan to do the data rescue.

16 Don’t have access to the observation stays a real problem for us for, sometimes we call a volunteer observer to have some information on the real time. When we are doing our forecast and checking a forecast. MAJOR NEED AND GAPS IN OBSERVING CAPABILITES AND ACCESS

17 Major needs 1. A National network 2. Access to a regional observation network. 3. Data management and dissemination. Some gaps 1.Maintenance regular of the operational stations. 2. Replace silent stations

18 MAJOR NEED AND GAPS IN OBSERVING CAPABILITES AND ACCESS MAJOR NEED AND GAPS IN OBSERVING CAPABILITES AND ACCESS We think that WMO and RA-IV should continue to develop good relationship and assist the government of Haiti to implement the HYDROMET project.

19 Plans for the National Observing Networks Hydromet Project In the Hydromet Project CNM and SNRE will work together to insure: observation, monitoring, forecasting, database management and service assistance to users. this time there will have a lot of economical and technical assistance This project is supported by WMO via the Canadian government that gives the opportunity to have a building and equipments And the World Bank that gives the possibility to finance training and equipments

20 WIGOS Implementation Status With the Hydromet project Haiti will be able to contribute effectively in theWIGOS program.

21 WIGOS Implementation Status National Meteorological Center needs Training in -Technician and engineer weather (marine, aviation, agriculture etc) -Installer and maintenance technicians of weather equipment -Computer (computer graphics, webmaster, programmer) -Technician and engineer Telecommunication -climatologist

22 WIGOS Implementation Status National Service and Water Resources needs training in - water chemistry -Improvement and Protection of Catchment sources -Integrated Management of Water Resources -Maintenance and calibration Climatological and Hydrological instruments -Development of hydrological models

23 WIGOS Implementation Status Normally, the CNM deals with three essential partners in a formal way. 1. THE OFNAC for the Aeronautical assistance 2. The SEMANAH for the assistance to the Sea navigation 3. The DPC Direction of the Civil protection for warning messages to the population. The media and the Private sector are handled in the informal. All these partners receive our data via the internet by an e-mail address or directly on our site except OFNAC which receives a part of the data by telephone. (The METAR )

24 Summary The problem of the hydro-meteorological sector, leads to the development of various independent managers. This development uncoordinated given. 1. various network managers 3. no regular maintenance. 4. Life stations are often limited. 5. No data quality control. 6. No national network

25 The ministry of agriculture with the support of WMO and others partners come with the Hydromet project to improve the capacity to monitor and control the hydro- meteorological parameters With the HYDROMET project, we hope many problems will be resolve and Haiti will be able to contribute like other countries in the implementation of WIGOS. Summary


Download ppt "Waldo Colas, forecaster, National meteorological center RA-IV WIGOS Implementation Workshop (English), 1 - 3 December, Willemstad."

Similar presentations


Ads by Google