Download presentation
Presentation is loading. Please wait.
Published byCody Hunter Modified over 9 years ago
1
June 2015 Allison Anderson Federal Program Monitoring and Support Eligible School Summary Report (ESSR) Power School Data Webinar
2
Who reports? All LEAs and Charter Schools, both those that receive Title I funds and those that do not receive Title I funds What is collected? Title I School eligibility and program model information Why is it collected? Total # Children enrolled at the school/ Total # low-income children/ Title I program that will operated during upcoming school year
3
School should be ‘LEA Office’, Term should be the school year for which you’re collecting the data The option to print is on all pages If you do not see the Federal section, please call your Power School Administrator to make sure that you have the proper access to the site. If you do not see the Title I section or the ESSR link, please call your Power School Administrator to make sure that you have the proper access to the site. 15-16
5
Option 1: Enter Only Direct Certification in All Schools (CEP and Non- CEP) # Low-Income Students = #Direct Certification Option 2: Direct Certification in CEP Schools & Household Applications in Non – CEP Schools Non – CEP = # Low Income = # Free and Reduced Option 3: Direct Certification in All Schools regardless of being CEP or Not & Use 1.6 Multiplier in All Schools # Low Income = # Direct Certified Select Option Used to Determine Poverty Percentage Eligible School Detail CEP =# Low Income = # Direct Certification
6
Choose your CEP Option Next you can select a school to start to edit
7
Option 1 # Low-Income Students = # Direct Certification
8
Option 1 CEP = Yes
9
Option 1 CEP = No
11
Option 2
12
Option 2 = Yes With the CEP # Low Income = # Direct Certification
19
Option 2 Non – CEP = NO # Low Income = # Free and Reduced
22
Option 3 # Low Income = # Direct Certified
23
Option 3 CEP = Yes
27
Option 3 CEP = No
30
This is what a completed row will look like 2015-2016
32
The Date and Time Stamp is how you know your data has been approved in the system It will take 24 to 48 hours for the data to transfer to the CCIP system
33
System Open : June 5th (Unless LEA has a NEW School Opening OR NEW CODE Then DUE DATE : CALL ME
34
Questions??? allison.anderson@dpi.nc.gov 919-807-3644 allison.anderson@dpi.nc.gov
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.