Portable Fuel Container Spillage Control Project Monitoring and Laboratory Division June 28, 1999 California Environmental Protection Agency Air Resources Board
3
Portable Fuel Container Spillage Control Workshop Changes in the Proposed Regulations Proposed Test Methods for Spill-Proof Systems Draft Refueling Spillage Test Data Permeation and Barrier Feasibility Test Data Estimated Effectiveness of Spill-Proof Systems Population/Activity/Emissions Inventory Estimated Price Increases for Spill-Proof Systems Regulatory Process More Information
4
Proposed Portable Fuel Container Spillage Control Regulations Proposed Regulations apply to both portable fuel containers and spouts Section 2472. Performance Standards for Spill- Proof Systems and Spill-Proof Spouts Section 2472 (a)&(b). Three flow rate standards based on container size (e.g., 1/2 gallon/minute for containers 1.25 gallons) Section 2472. Permeation Standard of 0.4 grams/gallon/day
5
Proposed Portable Fuel Container Spillage Control Regulations (continued) Section 2473. Exemptions, rapid refueling devices for off-road motorcycle competitions & portable fuel tanks for outboards Section 2475. Flow rate labeling requirement Section 2477. Test Methods for determining compliance with Performance Standards
6
Section 2477. Test Methods Test Method 510 - Automatic Shut-Off Test Procedure Test Method 511 - Automatic Closure Test Procedure Test Method 512 - Flow Rate Test Procedure Test Method 513 - Permeation Test Procedure
7
Test Method 510 - Automatic Shut-Off Fill container with water and invert for 5 minutes to check for leaks Dispense contents into a 1/2 gallon test fixture Fill test fixture to at least 1 inch from the top of the opening (± 1/8”) without overflowing Repeat the process 3 times
8
Test Method 511 - Automatic Closure Apply Test Method 510 protocol except fill the test fixture to approximately 50% of capacity Hold the inverted container over the test fixture for 30 seconds to check for leaks and proper function of automatic closure Pressurize container to 10 psig with the spout installed, leave undisturbed for 24-hours and record any pressure loss Maximum allowable 24-hour pressure loss is 1 psig
9
Test Method 512 - Flow Rate Test Procedure Fill container to its nominal capacity with water and invert for 5 minutes to check for leaks Determine the amount of time to dispense all but approximately 1 pint of the liquid Determine the mass of liquid dispensed by pre and post weighing the container Calculate a flow rate in gallons/minute using the density of water at 25°C Test each container 3 times to determine the average flow rate
10
Test Method 513 - Determination of Permeation Rates Precondition containers with gasoline for a minimum of 4 weeks Empty and re-fill containers with CERT fuel, seal, leak test, then expose to a 24-hour variable temperature profile Weigh containers every 24-hours to determine the permeation rate gravimetrically Must verify weight loss is linear (steady state) Average of 5 consecutive 24-hour diurnal cycles used to determine the final rate
11
Refueling Spillage Test Procedure Randomly selected ARB employees using conventional containers and spouts fill a 2400 ml fuel tank Each participant performs several trials with randomly selected containers Mass of the fuel dispensed is determined by pre and post weighing the containers
12
Refueling Emissions Test Bench
14
Draft Refueling Spillage Test Data Out of 56 events, 25 included refueling spillage (45%) Average per spillage event (less displaced vapor) =16.4 grams Total fuel dispensed - 51.1 gallons Testing will continue through July 2nd, final results will be posted on our web site
15
Permeation and Barrier Feasibility Tests Average permeation rates determined from testing untreated HDPE containers Treated containers also tested to determine the effectiveness of barrier surface treatments Containers ranged in size from 1.25 gallons to 6.6 gallons and included products from 5 different manufacturers Containers were tested with Phase II California Reformulated Certification (CERT) fuel Select containers were also tested with a blend of Carbob and fuel grade ethanol (5.7% mass) Barrier surface treatments included Sulfonation & 2 levels of Fluorination (levels 3 & 5)
16
Permeation and Barrier Feasibility Tests
17
Permeation and Barrier Surface Treatment Feasibility Test Data
18
Average Permeation Rates for Untreated Containers 1.25 gallons - 1.52 g/gal/day 2.06 gallons - 1.88 g/gal/day 2.5 gallons - 1.46 g/gal/day 5 gallons - 1.43 g/gal/day 6.6* gallons - 1.09 g/gal/day Average Permeation Rate - 1.57 grams/gallon/day
19
Average Permeation Rates for Treated Containers
20
Average Permeation Rates Proposed Standard
21
Estimated Effectiveness of Spill-Proof Systems Reduce diurnal emissions by 75% Eliminate refueling spillage - 100% Eliminate transport and storage losses - 100% Reduce average permeation rates by 75% Collects 45% of displaced vapors
22
Portable Fuel Container (Gas Cans) Population/Activity/Emissions Inventory Mobile Source Control Division June 28, 1999 California Environmental Protection Agency Air Resources Board
23
Statewide Population and Activity of Gas Cans Determined through surveys Residential Survey Commercial Survey
24
Residential Population/Activity Parameters % of households with gas cans - 46% # of gas cans per household - 0.8 % of gas cans stored empty - 30% Average gas can capacity - 3.0 gallons Average age of gas can - 5.5 years Plastic and metal gas cans ratio - 76:24
25
Residential Population/Activity Parameters (Continued) % Plastic cans with closed system - 53% % Plastic cans with open system - 23% % Metal cans with closed system - 13% % Metal cans with open system - 11%
26
Commercial Population/Activity Parameters # of gas cans per business - 6.9 Average gas can capacity - 3.4 gallons Average age of gas cans - 1.34 years Plastic and metal gas cans ratio - 72:28
27
Commercial Population/Activity Parameters (Continued) % Plastic cans with closed system - 33% % Plastic cans with open system - 39% % Metal cans with closed system - 18% % Metal cans with open system - 10%
28
Gas Can Population Estimates Residential gas can population - 9 million Expansion Factor - # of housing units by county obtained from California State Department of Finance Commercial gas can population - 400,000 Expansion Factor - # of businesses which may have gas cans from InfoUSA database
29
Various Emissions Related Processes Associated with Gas Cans Diurnal Loss - Ambient Temperature Permeation Loss - Pressure and gas can material Spillage - During refueling of equipment Vapor Displacement - During refueling of equipment
30
Permeation Emission Rates 1.57 grams per gallon per day Obtained through gravimetric testing of several gas cans
31
Diurnal Emission Rates (Draft) Several cans under different conditions were tested using Sealed Housing Evaporative Determination method. Plastic/closed system - 2.15 g/gal/day Plastic/open system - 21.76 g/day Metal/closed system - 2.15 g/gal/day Metal/open system - 21.76 g/gal/day
32
Spillage and Vapor Displacement Emission Rate 17.3 g/refueling - obtained from USEPA’s NEVES report Vapor displacement - 4.52 g/gal Waiting for Data
33
Estimated Prices of Spill-Proof Systems Average price increase per Spill-Proof System estimated between $5.50 - $8.00 per container Estimate compares retail prices of similarly constructed containers Breaks containers into 3 size categories, 1-1.5, 2-2.5, 5-6 gallons Pre-Regulation retail estimates of fuel containers are: u 1-1.5 gallon - $3.24 u 2-2.5 gallon - $4.69 u 5-6 gallon - $9.99
34
Regulatory Process Workshop June 28, 1999 u Consider all comments received by July 9, 1999 Staff Report - August 6, 1999 u Start of 45 day public comment period Board Hearing - September 23, 1999
35
More Information On The Emissions Inventory www.arb.ca.gov/msprog/spillcon/inventor.htm Archana Agrawal, Manager, Inventory Assessments Section (626) 450-6136 aagrawal@arb.ca.gov
36
More Information On The Regulation www.arb.ca.gov/msprog/spillcon/spillcon.htm Workshop presentation will be posted on the web site Dean Bloudoff (916) 263-2070 dbloudof@arb.ca.gov
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.