Presentation is loading. Please wait.

Presentation is loading. Please wait.

A series of refurbishment and alteration projects leading to the vacating of most of level 3P and some of level 2P to allow the opening of the new College.

Similar presentations


Presentation on theme: "A series of refurbishment and alteration projects leading to the vacating of most of level 3P and some of level 2P to allow the opening of the new College."— Presentation transcript:

1 A series of refurbishment and alteration projects leading to the vacating of most of level 3P and some of level 2P to allow the opening of the new College Major alterations and refurbishments to 2Q & 3Q to provide up to date if not state of the art labs and teaching spaces as well as offices for relocating staff. Related works in N block to upgrade offices relocate staff and provide new specialist IT and lab spaces Works to R Block to create replacement workshops and IT improvements etc Kaplan International College

2 After Before Kaplan International College - P Block

3 Q Block 2Q24 Games Lab2Q7/8 After Before 2Q7/8

4 N Block Before After


Download ppt "A series of refurbishment and alteration projects leading to the vacating of most of level 3P and some of level 2P to allow the opening of the new College."

Similar presentations


Ads by Google