Download presentation
Presentation is loading. Please wait.
Published byRafe Alexander Modified over 8 years ago
1
THE ORM PROCESS
2
Operational Risk Management
3
Basic ORM - MEASURING RISK
4
STANDARD OPERATIONAL RISK SAFETY BRIEFING 1. Scope: Define the coverage of the briefing in terms of time, geographic limits, or specific topics. 2. Weather report or forecast. 3. Terrain, if appropriate. 4. Facility. Any Safety Constraints. Known Risks and RiskMitigations. Emergenc Exits, Fire Extinguisher Locations, Police/Fire/EMS contact information. 5. Ground Operations. Any Safety Constraints. Known Risks and Risk Mitigations. 6. Vehicle Operations. Any Safety Constraints. Known Risks and Risk Mitigations. 7. Flight Operations. Any Safety Constraints. Known Risks and Risk Mitigations. 8. Other Operational Considerations. 9. Other appropriate items (i.e., there has been a change in mission, weather, etc.). 10. Conclusions, if applicable.
5
Facility Risk Mgmt Worksheet
6
Ground Team ORM
7
Air Crew ORM
8
Index of Thermal Stress and Wind Chill
9
ORM is really a simple process
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.