Download presentation
Presentation is loading. Please wait.
Published byPeter Miles Modified over 9 years ago
1
© Minewater BV 2014 18 November 2014 René Verhoeven (r.verhoeven@mijnwater.com) Technical Manager Mijnwater BV Development of an intelligent hybrid sustainable energy infrastructure in the municipality Heerlen, the Netherlands Minewater 3.0 Low Carbon Heating Technology Showcase Pitch Heat Generation Session
2
2 Conventional = 100% fossil + 100% losses Minewater vision Conventional energy supply November 2014
3
3 Minewater vision District heating with CHP November 2014 Improvement = increase efficiency
4
4 Heat pump New generation: exchange and storage = 2 to 5 times reuse with additional sustainable energy generation Minewater vision Sustainable energy supply November 2014
5
5 Minewater 3.0 Design on use Peak load 200 – 400 hours (10–20 days): Feed temperature 38 – 45 ˚C Short term storage (hour/day) Base load 3600 hours (5 months): Feed temperature 30 – 38 ˚C Mid/long-term storage (week/month/season) Hot water demand < 2 hours/day: Heatloss HT-network 8760 hours/year > 35% total heat demand; LT-network + booster HP < 5%
6
6 November 2014 Minewater 3.0 Low-Ex, storage and exchange Periods with extreme change in demand => though storage at building and cluster level instand (passive) exchange of heat and cold Peak load 200 – 400 hours (10–20 days): Feed temperature 38 – 45 ˚C Short-term storage (hour/dag) Base load 3600 hours (5 months): Feed temperature 30 – 38 ˚C Mid-term/long-term storage (week/month/season)
7
7 November 2014 M Minewater vision Financial
8
8 November 2014 M Minewater vision Decentralized Sustainable Energy 42% DSE target Dutch Energy Agreement not yet filled in => hybride infrastructure with sustainable heat
9
9 OU Campus Energy concept Oktober 2014
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.