1 Greg Hainsworth, P.E. M&R Workshop February 2014

2 Route 13 Puncheon Run South State Street

3

4 Bay Road Puncheon Run

5  Original plan of execution ◦ Maintain through traffic ◦ Replace one lane at a time ◦ 2 to 3 week duration  Contractor Proposal ◦ Complete shut down of all N/B traffic ◦ Replace both lanes simultaneously ◦ 72 hour duration – supported by hourly schedule ◦ Contingency resources on standby

6  Atlantic Concrete ◦ Air Temp – 70F / Mix Temp – 77F ◦ Type 1S cement ◦ Class A mix with 7.5 sacks per CY ◦ Air content 3.8% ◦ Slump 7-inches ◦ Non Chloride Accelerator ◦ Super Plasticizer ◦ Water reducer

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24  12 hour sure cure break – 2040 psi.

25

26

27

28

29

30  Contractor Innovation ◦ Equipment ◦ Manpower  Producer Mix Design  Smoothness ◦ Roller screeds / Bull Floats – Surface Chatter  Temporary Traffic Control plans