NITROGEN & PHOSPHORUS REMOVAL FROM GROUNDWATER LITTLE BOGUE, MS. CONSTRUCTED NOVEMBER 2009
2
RS2 Test Site: Little Bogue, Elliott, MS On the narrow mid-bank bench (average width 8- 10 ft, approx. 8 ft above the streamside floodplain bench), a trench a bucket wide (1.0 ft) was dug to a depth of 4 ft. This should intercept a large amount of shallow groundwater.
3
Research Monitoring & Analysis Hydrolab used to measure DO, ORP, temp, conductivity, turbidity & pH Lab measurement of ortho-P, NO 3 -N, TOC, alkalinity and NH 3 -N
4
Colorado State Field Lab Nitrogen Removal Results
5
Colorado State Field Lab Phosphorus Removal Results
6
Aerial view with approximate research project trench location in yellow & control section (trench not dug) in pink. PRE-PROJECT - RS2 PROJECT-LITTLE BOGUE FROM RED HEN VIDEO
7
RS2 Test Site: Little Bogue, Elliott, MS There is a 75 ft long control section (nothing done, no trench, just monitoring instruments), and a 150 ft long test trench section. Within the downstream 75 ft of the test trench, three 25 ft-long test plots of adventitious rooting poles of Black Willow, Sycamore, & River Birch were placed, spacing varied from 1 to 2 ft.
8
RS2 Test Site: Little Bogue, Elliott, MS For the test section shovels were used to backfill the trench with a mix of 20% (by volume) Aluminum Sulfate, xx% mulch, and the remainder native soil from the trench. This effectively planted the live poles to a depth of 4 ft.
9
RS2 Test Site: Little Bogue, Elliott, MS Monitoring instruments determine performance of the control and planted & not planted test sections. Instruments at different depths will determine if some groundwater is bypassing the test trench.
10
RS2 Test Site: Little Bogue, Elliott, MS According to the CSU laboratory tests, the Aluminum Sulfide and carbon (mulch) should greatly reduce the Nitrogen & Phosphorus load to the stream.
11
Install instrumentation as required. Monitor for long-term project performance. 200 ft RS2 Test Site: Little Bogue, Elliott, MS - aerial view
12
Looking US @ entrance conditions into project bend. Note floodplain bench & mid-bank bench where the test will occur. PRE-PROJECT - RS2 PROJECT-LITTLE BOGUE PIX BY DAVE DERRICK 4-2-08
13
Looking US @ the mid-bank bench where the test will be conducted. Control area in pink, test trench location in black. PRE-PROJECT - RS2 PROJECT-LITTLE BOGUE PIX BY DAVE DERRICK 4-2-08
14
LET’S DO SOME RESEARCH !!
15
Two bags of Aluminum Sulfate for each bag of Eucalyptus mulch CONSTRUCTION-RS2 PROJECT-LITTLE BOGUE PIX BY DAVE DERRICK 11-19-08
16
Hand labor is used to mix Aluminum Sulfate & mulch into backfill. Next time an excavator will be used to mix and backfill, we are learning!! No plantings in this first 75 ft. CONSTRUCTION-RS2 PROJECT-LITTLE BOGUE PIX BY DAVE DERRICK 11-19-08
17
Trench was dug to a consistent depth of 4 ft for entire length CONSTRUCTION-RS2 PROJECT-LITTLE BOGUE PIX BY DAVE DERRICK 11-19-08 John McCullah says, “Dig a hole, plant a pole!!”
18
Looking US @ seeded & mulched trench, berm, & plantings. CONSTRUCTION-RS2 PROJECT-LITTLE BOGUE PIX BY DAVE DERRICK 11-19-08
19
MONITORING INSTRUMENT INSTALLATION PHOTOS BY CHESTER WATSON JANUARY 12, 2009
20
Dr. Biedenharn with some of the monitoring instruments. MONITORING INSTRUMENT INSTALL-LITTLE BOGUE PIX BY WATSON 1-12-09
21
Looking US @ test site. Excellent planted grass coverage. MONITORING INSTRUMENT INSTALL-LITTLE BOGUE PIX BY WATSON 1-12-09
22
Looking US @ the test area. Great rye grass growth on all disturbed areas. MONITORING INSTRUMENT INSTALL-LITTLE BOGUE PIX BY WATSON 1-12-09
23
7 MONTHS AFTER PROJECT COMPLETION Photos by Derrick JULY 3, 2009 TAKING SOIL SAMPLES
24
Looking US @ test site. Excellent planted grass coverage. 7 MONTHS AFTER TRENCHING-LITTLE BOGUE PIX DERRICK 7-3-2009
25
Looking US @ the test site. All planted poles died except for one willow!!! 7 MONTHS AFTER TRENCHING-LITTLE BOGUE PIX DERRICK 7-3-2009
26
Close-up of the one willow that lived. 7 MONTHS AFTER TRENCHING-LITTLE BOGUE PIX DERRICK 7-3-2009
27
Looking downhill at one of the monitoring wells. 7 MONTHS AFTER TRENCHING-LITTLE BOGUE PIX DERRICK 7-3-2009
28
Ground water & soil sampling protocol from Dr. Ken Carlson, Colorado State University.
29
Tools used to take a soil sample 16 inches below the surface. 7 MONTHS AFTER TRENCHING-LITTLE BOGUE PIX DERRICK 7-3-2009
30
Very dry for the top 7 inches or so in each of the 15 soil sample holes 7 MONTHS AFTER TRENCHING-LITTLE BOGUE PIX DERRICK 7-3-2009
31
Man’s best friend, Cleophus Speed Elvis Derrick