Download presentation
Presentation is loading. Please wait.
1
1 PROJECT ADVISORY COMMITTEE June 19, 2012
2
2
3
3
4
4 2040
5
5
6
6
7
7 Tools in the Toolbox Source: Project Connect, Dec. 2
8
8 North Central (NC) Southwest (SW) Northeast (NE) Southeast (SE) South Central (SC) Northwest (NW) Central (C) West (W) East (E) 15 20 25 30 35 10 5 0 Source: Project Connect
9
9 West Austin ROW Preservation Source: Project Connect DRAFT
10
10 Traffic congestion in central Texas is a serious problem and must be addressedTraffic congestion in central Texas is a serious problem and must be addressed Because of central Texas’ growth and constraints to expanding highways alternative transportation options should be exploredBecause of central Texas’ growth and constraints to expanding highways alternative transportation options should be explored High capacity transit can be an effective part of the solution for improving mobility in central TexasHigh capacity transit can be an effective part of the solution for improving mobility in central Texas Source: Project Connect, TWG, Dec. 2012
11
11 Source: Project Connect, Jan. 2012
12
12
13
13
14
14
15
15
16
16 LPA Alternative A Alternative F Alternative D Alternative C Alternative B Alternative E Alternative A Alternative C Alternative F Initial and suggested alternatives identified Evaluation criteria identification and screening Remaining alternative(s) carried forward for detailed evaluation. Selection of a Locally Preferred Alternative (LPA) Screening Project Development Detailed Screening
17
17
18
18 Conventional Bus Conventional Bus Express bus in managed lanes MetroRapid MetroRapid Bus Rapid Transit Bus Rapid Transit (BRT) (BRT) Urban Rail Light Rail Commuter Rail (MetroRail) Regional Rail
19
19 Preliminary Schedule
20
20 Todd Hemingson, Capital Metro, VP Strategic Planning – – todd.hemingson@capmetro.org todd.hemingson@capmetro.org – – (512) 369-6036 John-Michael Cortez, Capital Metro, Manager - Community Involvement – – john-michael.cortez@capmetro.org john-michael.cortez@capmetro.org – – (512) 369-6201 Lynda Rife, Rifeline, LLC, Principal – – lrife@rifeline.com lrife@rifeline.com – – (512) 797-9019 Reed Lee, HDR Engineering, Inc., Project Manager – – reed.lee@hdrinc.com reed.lee@hdrinc.com – – (210) 260-452
21
21 QUESTIONSANSWERSDISCUSSION
22
22 CentersCoreConstraints CongestionGrowth
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.