Download presentation
Presentation is loading. Please wait.
Published byGregory Parsons Modified over 9 years ago
1
US Sailing Universal Measurement System (UMS) Measurer Seminar ORR Nathan Titcomb
2
ORR Rule Changes Minor change – ISP cannot be smaller than IG Only one major change to the ORR rule – All boats must be measured in Light Ship Condition – Measurement Inventories for all measured boats are required. Weigh previously allowable items and record weights on measurement inventory Inventory to include tank, ballast and engine locations
3
ORR PROCESSING Inputs received from measurer – Initial review of data – Request missing items from measurer – Measurement Inventory / Sail certificates / Owner details / Payment details Open existing boat record or create new boat – Thorough review of input data – Enter measurement data – Follow up with measurer, owner, sail maker as needed All data complete and entered – Initial run of VPP – If boat weighed, offsets adjusted to match the displacement to the weight – Vcg moment calculation for ORR trim condition with Measurement Inventory data – Displacement calculation for ORR trim condition with Measurement Inventory data – Freeboards adjusted for ORR trim condition Final VPP run and comparison to other boats in class Final verification by Chief Measurer Payment Processed Certificate ready to issue
4
ORR Processing Inputs received from measurer - Initial review of data - Request missing items from measurer -- Measurement Inventory / Sail certificates / Owner details / Payment details Open existing boat record or create new boat - Thorough review of input data - Enter measurement data - Follow up with measurer, owner, sail maker as needed Final VPP run and comparison to other boats in class All data complete and entered - Initial run of VPP - If boat weighed, offsets adjusted to match the displacement to the weight - Vcg moment calculation for ORR trim condition with Measurement Inventory data - Displacement calculation for ORR trim condition with Measurement Inventory data - Freeboards adjusted for ORR trim condition Certificate ready to issue Final verification by Chief Measurer Payment Processed
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.