CERN-IT/DB After-C5 Presentation EDMS Service Migration Monica Marinucci Lopez October 4th 2002 EDMS Document: 341082
2
After-C5: EDMS Service Migration October 4 th 2002 EDMS ID: 341082 M. Marinucci Lopez CERN-IT/DB 2 Overview Background New system study Final solution Plan
3
After-C5: EDMS Service Migration October 4 th 2002 EDMS ID: 341082 M. Marinucci Lopez CERN-IT/DB 3 EDMS Service Engineering Data Management Service It provides the necessary tools and the support for the creation and implementation of the Quality Assurance Plans needed to LHC machine and experiments In the near future: it will have a larger scope as a data management system
4
After-C5: EDMS Service Migration October 4 th 2002 EDMS ID: 341082 M. Marinucci Lopez CERN-IT/DB 4
5
After-C5: EDMS Service Migration October 4 th 2002 EDMS ID: 341082 M. Marinucci Lopez CERN-IT/DB 5 Current EDMS Cluster DEC based cluster (AS4100+DS20) Storage (HSZ70, 80GB mirrored) Mix of home-made and vendor applications Data under Oracle (2-node SUN Cluster, 18GB) Shared responsibility amongst EST/ISS IT/ PS IT/ DB
6
After-C5: EDMS Service Migration October 4 th 2002 EDMS ID: 341082 M. Marinucci Lopez CERN-IT/DB 6 Current EDMS infrastructure EDMS Cluster Central Database Cluster
7
After-C5: EDMS Service Migration October 4 th 2002 EDMS ID: 341082 M. Marinucci Lopez CERN-IT/DB 7 Current EDMS Service diagram OPS CADIM, File Server, iAS EDMS Cluster Central Database Cluster HA serviceShared service
8
After-C5: EDMS Service Migration October 4 th 2002 EDMS ID: 341082 M. Marinucci Lopez CERN-IT/DB 8 Reasons for the migration HP/Compaq/Digital architecture will not be supported by IT in the future Increase in the use of Oracle based tools (ie iAS and https support, MP5) General system performance improvement Centralization and rationalization of EDMS service
9
After-C5: EDMS Service Migration October 4 th 2002 EDMS ID: 341082 M. Marinucci Lopez CERN-IT/DB 9 Possible Solutions Two 2-node clusters Current central database cluster + a new EDMS cluster One 3-node cluster Merge of current central database cluster and a new EDMS cluster
10
After-C5: EDMS Service Migration October 4 th 2002 EDMS ID: 341082 M. Marinucci Lopez CERN-IT/DB 10 Solutions Pro-Cons Two 2–node clusters Cheaper purchase of a new EDMS cluster Simpler migration High-Maintenance cost over the next years Overload in the cluster administration One 3-node cluster Enhance EDMS db performance and integration Cheaper maintenance cost Single cluster administration More expansive purchase of new EDMS cluster More complex migration
11
After-C5: EDMS Service Migration October 4 th 2002 EDMS ID: 341082 M. Marinucci Lopez CERN-IT/DB 11 Solution: one 3-node cluster
12
After-C5: EDMS Service Migration October 4 th 2002 EDMS ID: 341082 M. Marinucci Lopez CERN-IT/DB 12 New EDMS Service Infrastructure Nodes: 3 SUN V880 with 2 UltraSparc III CPUs at 750 MHz, 4GB memory, 6 internal disks Storage: 2 SUN T3 WorkGroup with 324 GB mirrored Interconnections: 2 Qlogic FiberChannel 8- port Switches (for T3WG) 2 Gbit Ethernet Switches (for the private network) Public Network: on Gbit Ethernet
13
After-C5: EDMS Service Migration October 4 th 2002 EDMS ID: 341082 M. Marinucci Lopez CERN-IT/DB 13 Advantages Integration: EDMS service + Database services High-Availability Administration: 1 cluster instead of 2 clusters + OEM Scalability: possible to add 1 node Performance: database and networking Storage: more space Costs (see next slide) Test Platform: the old current Public database cluster Expertise: SUN Solaris + 2- node cluster
14
After-C5: EDMS Service Migration October 4 th 2002 EDMS ID: 341082 M. Marinucci Lopez CERN-IT/DB 14 Costs (Purchase + Maintenance)
15
After-C5: EDMS Service Migration October 4 th 2002 EDMS ID: 341082 M. Marinucci Lopez CERN-IT/DB 15 Future EDMS Service diagram HA services Shared service OPS CADIM, File Server OPS iAS
16
After-C5: EDMS Service Migration October 4 th 2002 EDMS ID: 341082 M. Marinucci Lopez CERN-IT/DB 16 So far … Hardware is installed and tested A first SUN cluster software installation is available for testing: Fail-over mechanisms Coexistence of HA services and OPS (Oracle Parallel Service) Stability
17
After-C5: EDMS Service Migration October 4 th 2002 EDMS ID: 341082 M. Marinucci Lopez CERN-IT/DB 17 Future EDMS infrastructure V880 T3WG Switches
18
After-C5: EDMS Service Migration October 4 th 2002 EDMS ID: 341082 M. Marinucci Lopez CERN-IT/DB 18 Experience Some issues related to SUN certification of the requested configuration Eventually we are satisfied of the outcome and SUN support Tests run so far are satisfactory, but coexistence amongst different services requires more work and understanding Other service might be included
19
After-C5: EDMS Service Migration October 4 th 2002 EDMS ID: 341082 M. Marinucci Lopez CERN-IT/DB 19 Migration Plan (1/2) Cluster installation and certification Mainly SUN1 week Software Installation + Porting of existing services + High- Availability tests IT/DB (with IT/PS collaboration) 2 months Database migrationIT/DB1 month Application Server migrationIT/DB1 month
20
After-C5: EDMS Service Migration October 4 th 2002 EDMS ID: 341082 M. Marinucci Lopez CERN-IT/DB 20 Migration Plan (2/2) EDMS + ACCDB/CERNDB1 databases merge IT/DBSometime 2003 Tentative production: 1 st Quarter 2003
21
After-C5: EDMS Service Migration October 4 th 2002 EDMS ID: 341082 M. Marinucci Lopez CERN-IT/DB 21 Responsibilities Currently (until migration is completed) IT/PS: Hardware + OS + Cluster + CADIM + File Server + License Server + correspondent data safety IT/DB: EDMS database and related application server + Oracle data safety EST/ISS: EDMS Development Future IT/DB: Hardware + OS + Cluster + File Server + License Server + EDMS database and related application server + data safety IT/PS: CADIM Client Support EST/ISS: EDMS Development
22
After-C5: EDMS Service Migration October 4 th 2002 EDMS ID: 341082 M. Marinucci Lopez CERN-IT/DB 22 Conclusions The new EDMS service will merge the existing central database cluster and the current EDMS cluster More responsibility within IT/DB Tentative production date is 1 st Q 2003
23
After-C5: EDMS Service Migration October 4 th 2002 EDMS ID: 341082 M. Marinucci Lopez CERN-IT/DB 23 Before the questions: Thanks to my colleagues: In IT/DB: Catherine, Montse, Eric and Nilo In IT/PS: Ignacio, Manuel, Nils In EST/ISS: Thomas, Christophe, Stephan
24
After-C5: EDMS Service Migration October 4 th 2002 EDMS ID: 341082 M. Marinucci Lopez CERN-IT/DB 24 Questions & Answers