1 Managing Employee Complaints –Plastic Injection Molding
Template for Project Presentation November 19-21, 2002 Managing Employee Complaints –Plastic Injection Molding Project Manager: Sue Miller Project Team Member: Joe Mooring Kristen Yost Camille Carraway George Hillas Lorraine Sedlak

2 Project Development Summarize the results of the EHS Risk Assessment
Plastic Off-gassing 230 Explosion Potential 225 Equipment Maint EPA/OSHA Compliance 190

3 Objectives Eliminate impact of employee complaints associated with insufficient ventilation. Implement engineering controls Establish EHS management system to prevent recurrence Demonstrate integrity of organization.

4 Scorecard Metrics Key EHS Opportunities
Scorecard Component Description Metric (Units) FY02 Actual FY03 Goal Q1 Q2 Q3 Q4 Key EHS Opportunities  Eliminate EE complaints related to irritant plastic “fumes”  # of Complaints  10  0 Stakeholder Involvement  Engineering Org. Effectiveness  Characterize the existing Mfg. Process Develop Mgt. System of Introduction of new processes/materials Complete characterization Develop Mgt. System with EHS Learning/Growth  Partnership with EHS-Shared Learning/Train other Stakeholders  100% training of new Mgt system completed  100%

5 Project Benefits Tangible Intangible
Minimize potential for repeat (willful) OSHA violations Reduce potential EE Exposures Reduce EE Illnesses Reduce WC $ Intangible Positive EE/Management Relations Increase productivity Enhanced management efficiency

6 Estimated Project Costs

7 Estimated Savings

8 Financial Analysis $5,559 2.8 Years 6% (Net) 106% (Gross) 13%
Present Value of Savings: PV(Savings) $5,559 Net Present Value of Savings: NPV(Savings) Payback Period: 2.8 Years ROI ( 4 Years): 6% (Net) 106% (Gross) Internal Rate of Return (4 Years): 13%

9 Conclusions and Recommendations
Require initial investment of $95,500 IRR 13% Short Term Actions -Implement during schedule Plant Shutdown Long Term Actions -Create an EHS Mgt. System that can be used throughout the organizations