1 CE 303: Introduction to Construction Blueprint Lab

2 8’ - 4” 1’ - 8”

3 Objectives Dimension Lines Dimension Lines Reading Drawing Scales Reading Drawing Scales ArchitecturalArchitectural EngineeringEngineering Stationing Stationing Line-types and Placement Line-types and Placement Introduction to Quantity Takeoffs Introduction to Quantity Takeoffs

4 Drawing Scale construction projects are drawn to a reduced scale construction projects are drawn to a reduced scale scale is defined as scale is defined as architectural scalearchitectural scale 1/4” = 1’-0” this means every 1/4” on the drawing equals a one foot of actual length on the project 1/4” = 1’-0” this means every 1/4” on the drawing equals a one foot of actual length on the project 1/8” = 1’-0” 1/8” = 1’-0” engineering scaleengineering scale 1” = 10’, or 20’ etc. 1” = 10’, or 20’ etc. metric scalemetric scale 1:50 1:50

5 Reading Scales architectural scale 1 inch 2’ 4’ 2 inches 2’ 16’

6 Reading Scales 20’-6” architectural scale 2’ - 4”

7 Reading Scales architectural scale 2’ - 8½”

8 Reading Scales architectural scale 3’-8” 5 5/8”

9 Reading Scales engineering scale 50 feet 100 feet 10 feet 1 inch

10 Reading Scales metric scale 2 meters 10 meters

11 Stationing Dimensioning of an alignment in 100 foot intervals. Dimensioning of an alignment in 100 foot intervals. Each 100 ft. is denoted as 1+00 Each 100 ft. is denoted as 1+00 100’ = 1+00, 200’ = 2+00, etc..100’ = 1+00, 200’ = 2+00, etc.. Known as full stationsKnown as full stations Intermediate stations are between full stations and are known as plus stations. Intermediate stations are between full stations and are known as plus stations. 147’ = 1+47, 357.24 = 3+57.24, etc…147’ = 1+47, 357.24 = 3+57.24, etc…

12

13 Line-types & Placement Dimension and Extension Lines. Dimension and Extension Lines. Marking device placed at end of dimension line Marking device placed at end of dimension line Arrows, dot, tick…Arrows, dot, tick… Extension lines are drawn perpendicular to dimension line to specify features between which the dimension applies. Extension lines are drawn perpendicular to dimension line to specify features between which the dimension applies.

14 Dimension Lines

15 Quantity Takeoffs Quantities derived from drawings Quantities derived from drawings Square footage, linear footage, cubic footage…Square footage, linear footage, cubic footage… List of all materials List of all materials Requires understanding of geometry (calculations from straight lines, curves, angles...) Requires understanding of geometry (calculations from straight lines, curves, angles...) Accurate quantity takeoffs are required for detailed cost estimates. Accurate quantity takeoffs are required for detailed cost estimates. Can include labor and equipment costsCan include labor and equipment costs