MP3 recommendations from June 2013-Feb 2014 Arjan Verweij on behalf of the MP3 7-2-2014 A. Verweij, LSC meeting 7/2/2014 One of the tasks of the MP3 is to make recommendations concerning the SC circuits in the LHC, in order to resolve NC’s or improve future operation. Since June 2013 we issued 12 recommendations. MP3 website: www.cern.ch/MP3www.cern.ch/MP3 Recommendations on: https://twiki.cern.ch/twiki/bin/view/MP3/MP3recommendationshttps://twiki.cern.ch/twiki/bin/view/MP3/MP3recommendations
2
Issue: Short in RCS.A56B2 (NC 1279312), likely due to sharp edge inside HCM-LCM module Recommendation EDMS 1291327 (June 2013): Protect the inside of a tube in 12 HCM-LCM interconnects with a G10 foil. Ensure that sound electrical insulation is present in the N-line of 11 HCM- SHM interconnects. (PS: already presented to the LSC on 21/6/2013) Follow-up (as of 21/1/2014): Insulation of faulty wire repaired HCM-LCM interconnects all 12 have been opened. 11 are already consolidated. The last one (DFBAK) will be consolidated in the coming weeks. Line N in SHM-HCM interconnections 5 DFBAs are OK according to existing pictures. 3 are OK according to recently made X-rays 2 will be checked 1 is open (DFBAO) 1 A. Verweij, LSC meeting 7/2/2014
3
Issue: Unusual wiring of a spool piece due to a short in RCS.A78B1, NC 1300381 Recommendation EDMS 1310512 (sept 2013): Disconnect spool 9 from 10 in QQBI.B33L8 Follow-up: Done. Validated by ELQA. NC closed. ELQA test result still needs to be added to NC. NC still needs to be attached to the 2 IC’s. 2 A. Verweij, LSC meeting 7/2/2014
4
Issue: Quenching at low current of RCO.A78B2 (NC1029807) Recommendation EDMS 1311906 (Sept 2013): Bypass two MCO magnets using a spare busbar. Follow-up: Bypass made. Validated by ELQA. QPS is OK. EPC to be checked. NC not yet closed. Layout DB still to be updated. NC still needs to be attached to the 2 IC’s. 3 A. Verweij, LSC meeting 7/2/2014
5
Issue: Circuit RCO.A81B2 highly resistive and sometimes open (NC955048) Recommendation EDMS 1311907 (Sept 2013): Bypass two MCO magnets using a spare busbar. Follow-up: Bypass made. QPS is OK. EPC to be checked. Layout DB still to be updated. NC not yet closed. NC still needs to be attached to the 2 IC’s. 4 A. Verweij, LSC meeting 7/2/2014
6
Issue: Short-to-ground in RSS.A34B1 inside the SC link (NC 1289446) Recommendation EDMS 1315643 (Oct 2013): Bypass from DFBLC to DFBAF using a spare bus Follow-up: Procedure under definition. Connection foreseen between DFBLC extremity and QDQI.7R3. Work in progress. 5 A. Verweij, LSC meeting 7/2/2014
7
Issue: Short to ground in RQTF.A81B1 (NC 1285058) Recommendation EDMS 1315685 (Oct 2013): Bypass 4 MQT magnets Follow-up: Done. Validated by ELQA. NC not yet closed. Electrical DB still needs to be updated. QPS and EPC still have to implement some modifications. NC not yet attached to the modified IC. 6 A. Verweij, LSC meeting 7/2/2014
8
Issue: Decay time constant of the RB and RQ magnets Recommendation EDMS 133077 (Nov 2013): Modify the EE resistances so that RB =100 s and RQ =30 s. Follow-up: In progress. Resistances modified in almost all points. 7 A. Verweij, LSC meeting 7/2/2014
9
Issue: Sparking in 98 Fischer connectors of the RCO, RCBCH/V and RCBYH/V circuits during ELQA testing at nominal voltage (NC 831928) Recommendation EDMS 1333823 (Jan 2014): Improve insulation around 36 Fischer connectors Follow-up: Pending decision required by MSC-SCD section from the TE-TM before they start the work. 8 A. Verweij, LSC meeting 7/2/2014
10
Issue: Possible tripping of the QPS due to very low threshold of 0.5 mV on the 13 kA busbar segments of the RB and RQD/F circuits. Recommendation EDMS 1333883 (Jan 2014): Increase threshold from 0.5 to 2 mV. Follow-up: In progress by MPE-EP (QPS team). Awaiting new firmware. 9 ADC moving average filter f s =5 Hz t filter = 10 s U thres comparator A. Verweij, LSC meeting 7/2/2014
11
Issue: Short circuit between RCD.A78B1 and RCO.A78B1 in an SSS (NC 1333853). In this SSS both circuits do not contain any magnet. Recommendation EDMS 1343077 (Jan 2014): Bypass both faulty segments using spare bus bars. Follow-up: Done. Validated by ELQA. NC closed. NC not yet attached to the 2 IC’s. 10 A. Verweij, LSC meeting 7/2/2014
12
Issue: Quench back in 600 A circuits after a FPA. Recommendation EDMS 1343241 (Jan 2014): Change EE resistance from 0.7 to 0.4 in all (8) RQTL9 circuits. Follow-up: In progress by MPE-EE. Expected to be finished in June. 11 A. Verweij, LSC meeting 7/2/2014
13
Issue: Limited number of spare EE systems for 600 A circuits (only 4, i.e. 2% of total) and spare circuit breakers (6.6% of total). Same type of circuit breakers cannot be procured anymore. Recommendation EDMS 1343292 (Feb 2014): 8 RQS and 16 RSS circuits can run without EE. DC contactors should be bought. No change during LS1. Reconsider spare policy by end 2015. Follow-up: Price offer for DC contactors made. 12 A. Verweij, LSC meeting 7/2/2014
14
Conclusion Since June 2013 the MP3 issued 12 recommendations, in order to: Resolve NC’s: 8 Improve future performance: 4 11 recommendations are being followed, and will be finished in time to start IST and HWC. 1 recommendation is pending, and it is probably too late now to be implemented. A. Verweij, LSC meeting 7/2/2014