Presentation is loading. Please wait.

Presentation is loading. Please wait.

Instrumentation and Simulations for Target Test MICE Collaboration Meeting 22 October 2005. Bill Murray 1, Paul Soler 1,2, Kenny Walaron 1,2 1 Rutherford.

Similar presentations


Presentation on theme: "Instrumentation and Simulations for Target Test MICE Collaboration Meeting 22 October 2005. Bill Murray 1, Paul Soler 1,2, Kenny Walaron 1,2 1 Rutherford."— Presentation transcript:

1 Instrumentation and Simulations for Target Test MICE Collaboration Meeting 22 October 2005. Bill Murray 1, Paul Soler 1,2, Kenny Walaron 1,2 1 Rutherford Appleton Laboratory 2 University of Glasgow

2 2 MICE Collaboration Meeting 22 October 2005 ISIS beam test (beg 2006) Proposed location of instrumentation: same angle as MICE beamline (25 o ) but inside synchrotron ring, at 10m or 20m from target

3 3 MICE Collaboration Meeting 22 October 2005  protons ISIS beam test (beg 2006) o Two scintillator hodoscope planes separated by a polyethylene filter. o If rate too high, use smaller plane in front. o Location: 10 m (or 20 m) from target area o Provides dE/dx signature and crude energy selection dE/dx (MeV/cm) P (GeV/c) p,  Polyethylene filter Segmented BC-404 scintillator

4 4 MICE Collaboration Meeting 22 October 2005 Particle Identification 10m from target 20m from target  p p   o Use dE/dx to separate protons from light particles o Allows us to count light and heavy species from target for validation of beamline simulations o Air affects average momentum and dE/dx for protons. o For example, protons at 440 MeV/c drop by 20 MeV/c in 10 m air.

5 5 MICE Collaboration Meeting 22 October 2005 Simulations for beam test o Simulation using MARS input for G4beamline o Selection of particles from target within acceptance at around 25 o p: 38% n: 57% 

6 6 MICE Collaboration Meeting 22 October 2005 Simulations for beam test o 10 million protons generated in target o Numbers of events in detectors (all detectors 1 cm thick to start with): –Small scintillator (5 cm x 5 cm) at 9984 mm: 10 particles, 3 protons, 7 neutrons –Large scintillator 1 (40 cm x 40 cm) at 9994 mm: 775 particles, 288 protons, 460 neutrons, 8 pi+, 2 pi-, 3 mu+, 3 mu- –Absorber (40 cm x 40 cm) at 10005 mm: 745 particles, 274 protons, 448 neutrons, 8 pi+, 2 pi-, 3 mu+, 3 mu- –Large scintillator 2 (40 cm x 40 cm) at 9994 mm: 719 particles, 257 protons, 436 neutrons, 9 pi+, 2 pi-, 3 mu+, 3 mu-

7 7 MICE Collaboration Meeting 22 October 2005 Simulations for beam test 10m from targetFirst scintillator  p n

8 8 MICE Collaboration Meeting 22 October 2005 Simulations for beam test 10m from targetAbsorber (1cm)  p n Clearly, 1 cm thickness makes little difference.

9 9 MICE Collaboration Meeting 22 October 2005 Simulations for beam test 10m from targetSecond scintillator  p n

10 10 MICE Collaboration Meeting 22 October 2005 Numbers o ISIS bunch is 2.5 10 13 protons o We might intercept 1% before being shutdown? –7.5 10 6 protons on 40cm 2 detector –4700 in a 3mm by 3 cm finger scintillator Kenny: Scintillator 40cm sq. at 10m 288 protons 11 pions 10M P-o-T 29 protons per 1M 1.1 π Bill: Scintillator 40cm sq. at 10m 55 protons 6 (+14 mu,e) 2.4M P-o-T 23 protons per 1M 2.5 π (+6.5 μ, e)

11 11 MICE Collaboration Meeting 22 October 2005 Simulations for beam test o At high momenta (above ~ 800 MeV/c), protons and lighter particles become indistinguishable. o At high momenta it doesn’t help to use Time of Flight information

12 12 MICE Collaboration Meeting 22 October 2005 Simulations for beam test Protons survival Pions survival o We can use range-out of protons to perform crude momentum separation o Protons range out very quickly (e.g. in 5cm scint. proton energy > 425 MeV) o Need to convolute survival probablilities with production to produce optimal arrangement. Thickness scintillator (cm)

13 13 MICE Collaboration Meeting 22 October 2005 Equipment for beam test FAN IN/OUT Q-ADC TDC GATE TDC GATE Q-ADC HIGH VOLTAGE PMT1 PMT2 X x VME CRATE L o Have electronics, PMTs and UNIDAQ data acquisition installed at Glasgow (thank you Makoto and Malcolm!!!!). o Aim to start testing PMTs next week.

14 14 MICE Collaboration Meeting 22 October 2005 Proof!

15 15 MICE Collaboration Meeting 22 October 2005 Plans o Prepare for target test January 2005 inside ISIS ring. –Test station being set-up at Glasgow with UNIDAQ and read-out electronics: technical problems with DAQ resolved with Makoto and Malcolm’s help. –Test all PMTs and validate performance –Purchase Bicron BC-404 scintillator, light-guides and absorbers for precise geometry determined from simulation. –Electronics and PMT’s fully tested by end November 2005 –Install equipment in ISIS during December-January (ISIS shutdown) –Set-up triggering electronics and gated scalers for target monitoring o In parallel, develop simulations to define optimal geometry –Calculate particle momenta coming out of target: done –Run test-beam simulation to determine what configuration results in the maximum information that we can extract from target test (ie. ToF, dE/dx, optimum distance 10-20 m, use of different absorbers, …) –Determine rate per scintillator slab for different configurations –Write proposal to ISIS: target November 2005


Download ppt "Instrumentation and Simulations for Target Test MICE Collaboration Meeting 22 October 2005. Bill Murray 1, Paul Soler 1,2, Kenny Walaron 1,2 1 Rutherford."

Similar presentations


Ads by Google