Senior Design Team 12: Chase Bryant Alexandra Callich Jonathan Meyer-Senior Elliot Popper Rayford Rahming Christian Scott
3
Horizontal-Axis Turbine Foundation with Counterweight Wind Turbine Systems Control System Braking System
4
All Parts Ordered! Waiting on Shipment Hydraulic Cylinder Microcontroller Anemometer
5
Located in Thomasville, GA. Southern Division focuses primarily on the Southeast Greg Orff – General Manager
6
Steel Order Turbine Blades Discontinued
8
Diameter = 1.5 inches Bore Diameter = 2.5 inches Pump and Motor Assembly Solenoid w/Remote Cord Set 1.4 GPM at 1,600 PSI 3 quart containment capacity Cylinder
10
Purchasing a trailer that will be Self Sustainable FAMU-FSU COE is allocating land Pursuing the possibilities on sharing land and joining our projects Still exploring foundation options
11
Finding a location for permanent placement Functional lowering mechanism Power production Estimated Completion Date: April 1, 2013 Remainder of time for operating and testing the sytem