Presentation is loading. Please wait.

Presentation is loading. Please wait.

Tasker User Interface Java desktop application (TaskerCLI)

Similar presentations


Presentation on theme: "Tasker User Interface Java desktop application (TaskerCLI)"— Presentation transcript:

1 Tasker User Interface Java desktop application (TaskerCLI)

2 Styling Dark theme Black / dark grey background (#232423) Lighter grey (#595959) as secondary background White-ish foreground text (#DADEDB) Using white text for headings / titles for emphasis Gone for Arial as a font for now (default for Swing anyway?) Task heading This is some sample text. Followed by some more smaller text. Task heading This is some sample text. Followed by some more smaller text.

3 First window: user identification (FR8) Tasker E-mail address E-mail: Password Password: Log in Remember me next time Tasker

4 First window: user identification (FR8) Tasker jgb7@aber.ac.uk E-mail: Password Password: Log in Remember me next time Tasker

5 First window: user identification (FR8) Tasker jgb7@aber.ac.uk E-mail: Password: Log in Remember me next time Tasker

6 jgb7@aber.ac.uk E-mail: Password: Log in Remember me next time Tasker First window: user identification (FR8) Scenario: Incorrect email or password

7 Tasker jgb7@aber.ac.uk E-mail: Password: Log in Remember me next time Tasker First window: user identification (FR8) Scenario: Valid email or password

8 Tasker Meet the group Tasker Main window Design UI for application 1 October 2015 – 21 October 2015 Prepare UI presentation 21 October 2015 – 22 October 2015 Build Java Swing prototypes 21 October 2015 – 10 November 2015 Collect feedback on prototypes 21 October 2015 – 10 November 2015 Last synced 2 minutes ago Research Java SQL libraries 21 October 2015 – 10 November 2015 Write, create, and pass unit tests 21 October 2015 – 31 December 2015 Read QA documents 1 October 2015 – 8 October 2015 Prepare UI presentation Start date: 21 October 2015 Expected completion date: 22 October 2015 Steps 1.Make authentication window slides 2.Make main window slides 3.Lorem ipsum 4.Make more tasks for this slide Status: Allocated Made the login window and made transitions to both main window and login error dialog. Demonstrated task list behavior and appearance, along with the expanded informational view of the selected task. Displayed status dropdown contents. Lorem ipsum dolor sit amet, consectetur adipiscing elit. Nulla auctor odio vitae nulla tempor molestie. Praesent consequat, lacus ut ornare egestas, dui ipsum convallis nisl, ut lobortis magna purus a ligula. Fusce pharetra ornare leo sit amet vulputate.

9 Tasker Meet the group Tasker Main window Design UI for application 1 October 2015 – 21 October 2015 Prepare UI presentation 21 October 2015 – 22 October 2015 Build Java Swing prototypes 21 October 2015 – 10 November 2015 Collect feedback on prototypes 21 October 2015 – 10 November 2015 Last synced 2 minutes ago Research Java SQL libraries 21 October 2015 – 10 November 2015 Write, create, and pass unit tests 21 October 2015 – 31 December 2015 Read QA documents 1 October 2015 – 8 October 2015 Prepare UI presentation Start date: 21 October 2015 Expected completion date: 22 October 2015 Steps 1.Make authentication window slides 2.Make main window slides 3.Lorem ipsum 4.Make more tasks for this slide Status: Allocated Made the login window and made transitions to both main window and login error dialog. Demonstrated task list behavior and appearance, along with the expanded informational view of the selected task. Displayed status dropdown contents. Lorem ipsum dolor sit amet, consectetur adipiscing elit. Nulla auctor odio vitae nulla tempor molestie. Praesent consequat, lacus ut ornare egestas, dui ipsum convallis nisl, ut lobortis magna purus a ligula. Fusce pharetra ornare leo sit amet vulputate. User’s task list Doesn’t scroll over the sync status bar or the Tasker text

10 Tasker Meet the group Tasker Main window Design UI for application 1 October 2015 – 21 October 2015 Prepare UI presentation 21 October 2015 – 22 October 2015 Build Java Swing prototypes 21 October 2015 – 10 November 2015 Collect feedback on prototypes 21 October 2015 – 10 November 2015 Last synced 2 minutes ago Research Java SQL libraries 21 October 2015 – 10 November 2015 Write, create, and pass unit tests 21 October 2015 – 31 December 2015 Read QA documents 1 October 2015 – 8 October 2015 Prepare UI presentation Start date: 21 October 2015 Expected completion date: 22 October 2015 Steps 1.Make authentication window slides 2.Make main window slides 3.Lorem ipsum 4.Make more tasks for this slide Status: Allocated Made the login window and made transitions to both main window and login error dialog. Demonstrated task list behavior and appearance, along with the expanded informational view of the selected task. Displayed status dropdown contents. Lorem ipsum dolor sit amet, consectetur adipiscing elit. Nulla auctor odio vitae nulla tempor molestie. Praesent consequat, lacus ut ornare egestas, dui ipsum convallis nisl, ut lobortis magna purus a ligula. Fusce pharetra ornare leo sit amet vulputate. Task title Start date Expected completion date

11 Tasker Meet the group Tasker Main window Design UI for application 1 October 2015 – 21 October 2015 Prepare UI presentation 21 October 2015 – 22 October 2015 Build Java Swing prototypes 21 October 2015 – 10 November 2015 Collect feedback on prototypes 21 October 2015 – 10 November 2015 Last synced 2 minutes ago Research Java SQL libraries 21 October 2015 – 10 November 2015 Write, create, and pass unit tests 21 October 2015 – 31 December 2015 Read QA documents 1 October 2015 – 8 October 2015 Prepare UI presentation Start date: 21 October 2015 Expected completion date: 22 October 2015 Steps 1.Make authentication window slides 2.Make main window slides 3.Lorem ipsum 4.Make more tasks for this slide Status: Allocated Made the login window and made transitions to both main window and login error dialog. Demonstrated task list behavior and appearance, along with the expanded informational view of the selected task. Displayed status dropdown contents. Lorem ipsum dolor sit amet, consectetur adipiscing elit. Nulla auctor odio vitae nulla tempor molestie. Praesent consequat, lacus ut ornare egestas, dui ipsum convallis nisl, ut lobortis magna purus a ligula. Fusce pharetra ornare leo sit amet vulputate. Allocated tasks Ordered by expected completion date Completed/abandoned tasks Ordered by start date

12 Tasker Meet the group Tasker Main window Design UI for application 1 October 2015 – 21 October 2015 Prepare UI presentation 21 October 2015 – 22 October 2015 Build Java Swing prototypes 21 October 2015 – 10 November 2015 Collect feedback on prototypes 21 October 2015 – 10 November 2015 Last synced 2 minutes ago Research Java SQL libraries 21 October 2015 – 10 November 2015 Write, create, and pass unit tests 21 October 2015 – 31 December 2015 Read QA documents 1 October 2015 – 8 October 2015 Prepare UI presentation Start date: 21 October 2015 Expected completion date: 22 October 2015 Steps 1.Make authentication window slides 2.Make main window slides 3.Lorem ipsum 4.Make more tasks for this slide Status: Allocated Made the login window and made transitions to both main window and login error dialog. Demonstrated task list behavior and appearance, along with the expanded informational view of the selected task. Displayed status dropdown contents. Lorem ipsum dolor sit amet, consectetur adipiscing elit. Nulla auctor odio vitae nulla tempor molestie. Praesent consequat, lacus ut ornare egestas, dui ipsum convallis nisl, ut lobortis magna purus a ligula. Fusce pharetra ornare leo sit amet vulputate. Currently viewed task Has brightened background and title text

13 Tasker Meet the group Tasker Main window Design UI for application 1 October 2015 – 21 October 2015 Prepare UI presentation 21 October 2015 – 22 October 2015 Build Java Swing prototypes 21 October 2015 – 10 November 2015 Collect feedback on prototypes 21 October 2015 – 10 November 2015 Last synced 2 minutes ago Research Java SQL libraries 21 October 2015 – 10 November 2015 Write, create, and pass unit tests 21 October 2015 – 31 December 2015 Read QA documents 1 October 2015 – 8 October 2015 Prepare UI presentation Start date: 21 October 2015 Expected completion date: 22 October 2015 Steps 1.Make authentication window slides 2.Make main window slides 3.Lorem ipsum 4.Make more tasks for this slide Status: Allocated Made the login window and made transitions to both main window and login error dialog. Demonstrated task list behavior and appearance, along with the expanded informational view of the selected task. Displayed status dropdown contents. Lorem ipsum dolor sit amet, consectetur adipiscing elit. Nulla auctor odio vitae nulla tempor molestie. Praesent consequat, lacus ut ornare egestas, dui ipsum convallis nisl, ut lobortis magna purus a ligula. Fusce pharetra ornare leo sit amet vulputate. Sync status bar Communicates sync state to user Has following states: -“Last synced x minutes ago” -“Syncing tasks…” -“Failed to sync with server” Sync icon acts as button to force manual sync

14 Tasker Meet the group Tasker Main window Design UI for application 1 October 2015 – 21 October 2015 Prepare UI presentation 21 October 2015 – 22 October 2015 Build Java Swing prototypes 21 October 2015 – 10 November 2015 Collect feedback on prototypes 21 October 2015 – 10 November 2015 Last synced 2 minutes ago Research Java SQL libraries 21 October 2015 – 10 November 2015 Write, create, and pass unit tests 21 October 2015 – 31 December 2015 Read QA documents 1 October 2015 – 8 October 2015 Prepare UI presentation Start date: 21 October 2015 Expected completion date: 22 October 2015 Steps 1.Make authentication window slides 2.Make main window slides 3.Lorem ipsum 4.Make more tasks for this slide Status: Allocated Made the login window and made transitions to both main window and login error dialog. Demonstrated task list behavior and appearance, along with the expanded informational view of the selected task. Displayed status dropdown contents. Lorem ipsum dolor sit amet, consectetur adipiscing elit. Nulla auctor odio vitae nulla tempor molestie. Praesent consequat, lacus ut ornare egestas, dui ipsum convallis nisl, ut lobortis magna purus a ligula. Fusce pharetra ornare leo sit amet vulputate. Allocated Complete Status dropdown Allows user to mark task as completed. Doesn’t allow task abandonment (only in TaskerMAN)

15 Tasker Meet the group Tasker Main window Design UI for application 1 October 2015 – 21 October 2015 Prepare UI presentation 21 October 2015 – 22 October 2015 Build Java Swing prototypes 21 October 2015 – 10 November 2015 Collect feedback on prototypes 21 October 2015 – 10 November 2015 Last synced 2 minutes ago Research Java SQL libraries 21 October 2015 – 10 November 2015 Write, create, and pass unit tests 21 October 2015 – 31 December 2015 Read QA documents 1 October 2015 – 8 October 2015 Prepare UI presentation Start date: 21 October 2015 Expected completion date: 22 October 2015 Steps 1.Make authentication window slides 2.Make main window slides 3.Lorem ipsum 4.Make more tasks for this slide Status: Complete Made the login window and made transitions to both main window and login error dialog. Demonstrated task list behavior and appearance, along with the expanded informational view of the selected task. Displayed status dropdown contents. Lorem ipsum dolor sit amet, consectetur adipiscing elit. Nulla auctor odio vitae nulla tempor molestie. Praesent consequat, lacus ut ornare egestas, dui ipsum convallis nisl, ut lobortis magna purus a ligula. Fusce pharetra ornare leo sit amet vulputate. Status dropdown Marking task as complete will prompt the user to confirm their actions. Clicking ‘Yes’ will mark it as complete, and ‘No’ will do nothing.

16 Tasker Meet the group Tasker Main window Design UI for application 1 October 2015 – 21 October 2015 Prepare UI presentation 21 October 2015 – 22 October 2015 Build Java Swing prototypes 21 October 2015 – 10 November 2015 Collect feedback on prototypes 21 October 2015 – 10 November 2015 Syncing tasks… Research Java SQL libraries 21 October 2015 – 10 November 2015 Write, create, and pass unit tests 21 October 2015 – 31 December 2015 Read QA documents 1 October 2015 – 8 October 2015 Prepare UI presentation Start date: 21 October 2015 Expected completion date: 22 October 2015 Steps 1.Make authentication window slides 2.Make main window slides 3.Lorem ipsum 4.Make more tasks for this slide Status: Complete Made the login window and made transitions to both main window and login error dialog. Demonstrated task list behavior and appearance, along with the expanded informational view of the selected task. Displayed status dropdown contents. Lorem ipsum dolor sit amet, consectetur adipiscing elit. Nulla auctor odio vitae nulla tempor molestie. Praesent consequat, lacus ut ornare egestas, dui ipsum convallis nisl, ut lobortis magna purus a ligula. Fusce pharetra ornare leo sit amet vulputate. Task is now marked as completed.

17 Tasker Meet the group Tasker Main window Design UI for application 1 October 2015 – 21 October 2015 Prepare UI presentation 21 October 2015 – 22 October 2015 Build Java Swing prototypes 21 October 2015 – 10 November 2015 Collect feedback on prototypes 21 October 2015 – 10 November 2015 Last synced 1 minute ago Research Java SQL libraries 21 October 2015 – 10 November 2015 Write, create, and pass unit tests 21 October 2015 – 31 December 2015 Read QA documents 1 October 2015 – 8 October 2015 Prepare UI presentation Start date: 21 October 2015 Expected completion date: 22 October 2015 Steps 1.Make authentication window slides 2.Make main window slides 3.Lorem ipsum 4.Make more tasks for this slide Status: Allocated Made the login window and made transitions to both main window and login error dialog. Demonstrated task list behavior and appearance, along with the expanded informational view of the selected task. Displayed status dropdown contents. Lorem ipsum dolor sit amet, consectetur adipiscing elit. Nulla auctor odio vitae nulla tempor molestie. Praesent consequat, lacus ut ornare egestas, dui ipsum convallis nisl, ut lobortis magna purus a ligula. Fusce pharetra ornare leo sit amet vulputate. Task step comment field Height of text input area expands as user types more and more lines Min height is always 1 line (never collapses to nothing)


Download ppt "Tasker User Interface Java desktop application (TaskerCLI)"

Similar presentations


Ads by Google