Download presentation
Presentation is loading. Please wait.
Published byBritney Townsend Modified over 9 years ago
2
Principles of Food, Beverage, and Labor Cost Controls, Ninth Edition
3
To ensure that all drinks are prepared according to management’s specifications To guard against excessive costs that can develop in the production process
4
Shot glass (plain or lined) Jigger Pourer Automated dispenser
5
Method I 1. Total number of ounces in bottle ÷ Standard portion size (ounces) = Number of drinks per bottle 2. Cost of bottle ÷ Result from Step 1 = Standard drink cost
6
Method II 1. Cost of bottle ÷ Total number of ounces in bottle = Cost per ounce 2. Result from Step 1 × Standard portion size = Standard drink cost © John Wiley & Sons, Inc. 2009
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.