Presentation is loading. Please wait.

Presentation is loading. Please wait.

Urban Storm Drain Design: Junction box standards.

Similar presentations


Presentation on theme: "Urban Storm Drain Design: Junction box standards."— Presentation transcript:

1 Urban Storm Drain Design: Junction box standards

2 Junction box standards Highlight various parts of Manhole Type M standards and specification sheet. Identify “things” that may confuse Feel free to mark on the sheet in your participant manual.

3 Junction box standards Similar to inlet considerations, rebar important. Sometimes can join boxes to maintain orientation If box over 6 feet wide -- special case, call BRG.

4 Junction box standards Riser does not have to be different dimension than the box

5 Junction box standards Make as many elements as possible identical Enhance constructability Min/max dimensions: maximum is structural limitation, if must exceed call BRG for guidance. D+1 ft. becomes limiting with box structures – they can get wide

6 Junction box standards Try to make elements identical and repeatable 1 set inlet, 1 set laterals, 1 junction

7 Junction box standards Offsets are not a constraint. Can have multiple offsets. Can have multiple penetrations on a side.

8 Junction box standards When have high topographic relief, use drops in junction boxes to control energy and velocity. Try to keep time of travel in system similar to pre- development conditions. d/D, Q, and V tells us where we need to change D as move through the system.


Download ppt "Urban Storm Drain Design: Junction box standards."

Similar presentations


Ads by Google