Presentation is loading. Please wait.

Presentation is loading. Please wait.

1 PreCam Flat Field QA Sahar Allam and Douglas Tucker 27 January 2011.

Similar presentations


Presentation on theme: "1 PreCam Flat Field QA Sahar Allam and Douglas Tucker 27 January 2011."— Presentation transcript:

1 1 PreCam Flat Field QA Sahar Allam and Douglas Tucker 27 January 2011

2 2 Flat Field Lamp Control Box

3 3 DES grizy Filters by Asahi 470nm740nm905nm970nm1000nm

4 4 Flat Field Brightness vs. Time (MJD) Measured in a 100x100 pixel “box” in Amp A of CCD 1

5 5 Flat Field Brightness vs. Time (MJD) Measured in a 100x100 pixel “box” in Amp A of CCD 1

6 6 Flat Field Brightness vs. Time (MJD) Measured in a 100x100 pixel “box” in Amp A of CCD 1

7 7 Flat Field Brightness vs. Time (MJD) Measured in a 100x100 pixel “box” in Amp A of CCD 1

8 8 Flat Field Brightness vs. Time (MJD) Measured in a 100x100 pixel “box” in Amp A of CCD 1

9 9 Flat Field Brightness vs. Time (MJD) Measured in a 100x100 pixel “box” in Amp A of CCD 1

10 10 Results 1.Dome lights on during flats for the night of MJD 55537? 2.Shutter problems between MJD 55553 and 55566 Broken or sticky 3.No problems with i- or y-band flats aside from period where we experienced shutter problems. 4.Problem with z-band flats starting on MJD 55545. Problem with 905nm LED? No apparent problems with i-band flats, which might indicate the 970nm or 1000nm LED. 5.Problem with g- and r-band flats starting on MJD 55572. As Pat Seitzer reported, white light LED was not working when he arrived.


Download ppt "1 PreCam Flat Field QA Sahar Allam and Douglas Tucker 27 January 2011."

Similar presentations


Ads by Google