10 September 20031 POOL v1 QA Massimo Lamanna, Jakub Moscicki CERN LCG/SPI
2
10 September 20032 Contents Regular QA assessment –QA reviews for 0.4.0, 1.0.0, 1.1.0, 1.2.0 The final report –Available at http://spi.cern.ch/qa/QAPOOL1.pdfhttp://spi.cern.ch/qa/QAPOOL1.pdf –User feedback (Atlas, CMS) –General Comments and Recommendations Conclusions
3
10 September 20033 Regular QA assessment QA reviews for 0.4.0, 1.0.0, 1.1.0, 1.2.0 –April to August 2003 –Guidelines: Select “indicators” of “quality” –Examples: »Does the code compile? »Are there tests for each component? »Is the documentation usable? »Select the most complex file/method… Improve on uniformity SPI POOL –LCG compliance –Uniformity –Reports attached as appendixes to the final document
4
10 September 20034 Regular QA assessments Main observations –Enormous emphasis on getting first fundamental functionalities implemented With good results! But some other activities suffered; examples: –Test effort limited in the first months (now much better) –Documentation effort limited (but dedicated effort was reduced after few months…) –The group showed a good dynamics Personnel change New people becoming efficient within a short delay
5
10 September 20035 Regular QA assessment (cont.d) –Sometimes difficult to broadcast the message on the value of having uniformity across all LCG projects Nevertheless fundamental input and discussions from POOL are acknowledged –POOL (as possibly other LCG projects, SPI included) seems to consider the other projects as separate entities My understanding is a bit different… Constructive collaboration should be applied here; the attitude to consider allowed everything which is not forbidden will lead to a committee-based development (with the net results everyone can imagine…)
6
10 September 20036 POOL in the experiments This section is the cornerstone of the report. –Since the final judgment about the quality of a package is given by the fact to meet the requirements of the users, the early adopters have been interviewed –To provide more material and some independent confirmation, some outstanding open issues (from the Savannah Bug Tracker) have been identified and considered in some detail, to ascertain if they were pointing to “normal” bugs or to missing features –But, who are the POOL users?
7
10 September 20037 POOL users Core software teams –To date, ATLAS and CMS had started the integration in their software frameworks –LHCb (as planned) will start in September –ALICE does not foresee to use POOL ATLAS and CMS –2 persons each –Very expert persons Other early adopters? –No non-LHC experiments –No “final” or “non-expert” users yet
8
10 September 20038 CMS interview Bill and Vincenzo were contacted. Most of the input from Bill. The experience was globally positive. –The CMS developers pointed out that the overall structure is adequate and presents the appropriate level of modularity. –The documentation is found still to be weak. Although a manual would be highly desirable, CMS used the tests and examples as replacement for a proper documentation. The RTAG document, on the other side, is too high-level to be helpful in providing a description of the POOL architecture. –The developer we interviewed used a little bit Doxygen to browse through the code (and never LXR); most of the time the CVS browser is used for this purpose. –Savannah (and in particular the BugTracker) is found to be an excellent tool. –The CMS developers acknowledge the responsiveness of POOL to provide explanations, fixes, and workarounds.
9
10 September 20039 CMS effort from QA point of view The effort was concentrated between mid June and end of July. –Testified by the very high bug tracker activity –The 2 CMS persons and the full POOL team provided an enormous effort –So far, so good
10
10 September 200310 ATLAS interview ATLAS has started a similar activity to integrate POOL within ATHENA. Again two developers are the integration task force (R. D. and Valeri), who were interviewed. –At the time of the interview, ATLAS was somewhat less advanced than CMS, but the developers could provide interesting and complementary information. –The integration is less advanced also because of some problems between ATHENA and SEAL services (mainly connected to the plug-in manager). –Most of the problems and instabilities are felt as normal infancy problems, which are expected to disappear (some instability in some public interfaces, for example). –The documentation is probably too limited and the need of an overview page giving the general vision is advocated.
11
10 September 200311 ATLAS interview (2) Some concerns have been expressed on the impact the new system (using POOL) will have on the final users. In particular, sharing private files across colleagues could be complicated by the fact that each set of files comes together with a file catalog. This could be confusing for many end users performing essential tasks like prototyping, test beam analysis, detector debugging or commissioning. ATLAS does not use SCRAM as configuration and build tool. –POOL and SEAL are just 2 more external packages for CMT. –ATLAS developers did manage to recompile POOL (using SCRAM) just using the POOL doc (This was needed for some tests). First positive impression but the first solid confirmation of the fact that POOL does satisfy the essential requirements will come probably in a month’s time. i.e. basically now…
12
10 September 200312 ATLAS effort from QA point of view The effort is less concentrated (still going on). –Complementary vision and very useful comments to be taken into account –Again, so far, so good!
13
10 September 200313 Is POOL providing what the experiments want? The inspection of the open bugs from the Savannah Bug Tracker confirms the picture obtained from the interview of the developers. –Please note the great value to channel all communication between users and POOL in a single repository The open bugs (beginning of August) showed that these issues are mainly plain bugs (5 out of 7) –although sometimes very dangerous (possible corruption of files; one CINT problem), possibly leading to a slow down of the integration effort, they are “just” bugs NOT SUGGESTING MAJOR DEFECTS
14
10 September 200314 Is POOL providing what the experiments want? One out of seven is the bad behaviour of a POOL subsystem under specific circumstances (failure of clearing the cache when a set of objects are referencing each other via a circular reference; bug report 1281). POOL managed to provide a mechanism to circumvent the problem; it might be even the final solution Only one (out of seven) points to a missing functionality, namely to the fact that it is not possible to selectively load the dictionary of all objects one would potentially use: the system seems to force the user to load all possible dictionaries before loading a file (bug report 1290 ). This is a serious problem that would be possibly fixed (leveraging some new functionality of SEAL and necessary support from back-end implementations, e.g. ROOT); a general solution does not seem completely trivial.
15
10 September 200315 What did we learn so far? Regular reports: –Impressive effort over all project life so far –POOL is getting better and better in terms of adherence of LCG-AA policies (as maintained by SPI), but still some efforts are needed Interviews: POOL matches the experiments’ expectations in terms of usability BugTracker: POOL matches the experiments’ expectations in terms of functionality To be done: Data Challenges should confirm that POOL matches what the experiments’ expectations in terms of performances (not only speed!)
16
10 September 200316 Recommendations 1.Complete the automation of the test procedures (using the existing SPI tools) and provide a first test coverage. 2.Make available and allocate enough effort to provide the required documentation. This should include an overview description of the full system and a workbook-like set of “getting started” instructions (installations, more examples). The effort could be evaluated to be ~ 0.5 FTE. 3.Improve on SPI compliance and maintain POOL aligned with SPI policy and usage of tools and services. 4.Make available and allocate enough effort to have “support” persons oriented to create permanent links with the experiments core software teams (~1 person) and the production managers (~1 person).
17
10 September 200317 Complete the automation of the test procedures (using the existing SPI tools) and provide a first test coverage POOL will keep a major fraction of the LHC experimental data –the system validation and risk associated calls for a very deep, effective, and continuous test effort The multiple sites, multiple versions, multiple platforms requires it already in the development stage It will be a key factor for the distribution and deployment outside CERN (LCG-1 sites and other installations, like development machines)
18
10 September 200318 Make available and allocate enough effort to provide the required documentation. This should include an overview description of the full system and a workbook-like set of “getting started” instructions. The effort could be evaluated to be ~ 0.5 FTE. I do not think it is necessary to elaborate on this self-evident item... A plan should be agreed with the experiments, to provide a priority list 0.5 FTE is a wild guess, based on previous experiences, but it should be build by a few persons, not just like the 5% of everybody in the group!
19
10 September 200319 Improve on SPI compliance and maintain POOL aligned with SPI policy and usage of tools and services Again, self-explanatory Please remember that uniformity has a great value –For developers: Already many examples of people contributing to different teams –For users: Typical experiment persons deals with many packages –For LCG support: Difficult to factorize support activities if they are not uniform
20
10 September 200320 Make available and allocate enough effort to have “support” persons oriented to create permanent links with the experiments core software teams (~1 person) and the production managers (~1 person). The project will (very soon) spawn a set of services. The embryos should be started now, due to the very tight data challenges schedule ahead For this particular item, physical persons (not FTEs) are essentials!
21
10 September 200321 Conclusions The POOL project is definitely on track POOL played (is playing) an important role as pilot project in LCG-AA –Interaction with SPI to define policies and services As CVS structure, tests, documentation, installation, … –Start up “example” for the others Encouraging interaction with the experiments We look forward to the demonstration of its capabilities and possibilities in the upcoming data challenges.
22
10 September 200322 Recommendations 1.Complete the automation of the test procedures (using the existing SPI tools) and provide a first test coverage. 2.Make available and allocate enough effort to provide the required documentation. This should include an overview description of the full system and a workbook-like set of “getting started” instructions (installations, more examples). The effort could be evaluated to be ~ 0.5 FTE. 3.Improve on SPI compliance and maintain POOL aligned with SPI policy and usage of tools and services. 4.Make available and allocate enough effort to have “support” persons oriented to create permanent links with the experiments core software teams (~1 person) and the production managers (~1 person).