Fire Protection of PE Radiation Shielding Daniel Rosberg, WSP 2014-10-06
2
Borated PE – burning behaviour
4
Building fire protection EvacuationStructural elements
5
Building fire protection Fire compartmentationSurface lining materials
6
Rescue service operation + 30 MW
7
Instrument fire Length (m) Width (m) Height (m) Max HRR (MW) 10 6890 44530 554 663 843
8
Sprinkler Sprinklerbild! Limited to 6 MW Will limit fire spread to secondary fuel packages. Still a 30 MW fire
9
Protecting the shielding material Safety distance +
10
Instrument during construction Borated PE 5 m – 6 MW 10 m – 30 MW 2 m – 1 MW 10 m – 30 MW Safety criteria: 135°C 7.4 kW/m 2
11
Instrument during construction Borated PE No limit 2 m – 1 MW 10 m – 30 MW 60 mm 1GF + 1 GA
12
Conclusions Fires 30 MW is the largest fire allowed Rescue service operation Roof construction HGV fire is approx. 30 MW Instrument fires can, however, be larger (90 MW) Is sprinkler required? No if instruments can be limited in size Yes if full flexibility is required Instrument size Number of instruments being unprotected simultaneusly
13
Conclusions How to protect PE Encasing (#1) Limit fire spread Protected fire load Safety distances (2-5-10) Sprinkler Small instruments …or… Combination thereof