Presentation is loading. Please wait.

Presentation is loading. Please wait.

The Glenday Sieve. “Few procedures make up for high volume activities” Total % of activity Total % of procedure types Colour code 50%6%Green Breaking.

Similar presentations


Presentation on theme: "The Glenday Sieve. “Few procedures make up for high volume activities” Total % of activity Total % of procedure types Colour code 50%6%Green Breaking."— Presentation transcript:

1 The Glenday Sieve

2 “Few procedures make up for high volume activities” Total % of activity Total % of procedure types Colour code 50%6%Green Breaking Through to Flow: Banish Fire Fighting and produce to Customer Demand, Lean Enterprise Academy

3 The Glenday Sieve Total % of activityTotal % of procedure typesGreen50%6% Only 6% of procedure range accounts for 50% of procedures Value Stream Map the “Greens” and make them flow Create more time for the difficult cases

4 MRI Team, NHS Tayside Graeme Houston, Radiologist, NHS Tayside 220 codes for appointments MRI RIE - 63% of MRI throughput from 2.7% of - 63% of MRI throughput from 2.7% of procedure codes procedure codes (i.e. 6 codes) Group patients by the process they go through (rather than clinical condition)

5

6


Download ppt "The Glenday Sieve. “Few procedures make up for high volume activities” Total % of activity Total % of procedure types Colour code 50%6%Green Breaking."

Similar presentations


Ads by Google