SWEA Contamination & Planetary Protection SWEA Pre-Shipment Review December 01-02, 2011 IRAP, Toulouse
2
Dec. 01-02, 2011 SWEA PSR Presentation Outline What has been done Contamination Planetary Protection Future work Contamination Planetary Protection 2
3
Dec. 01-02, 2011 SWEA PSR What has been done for “usual” contamination Implementation of a vertical laminar flow cabinet ISO5 (class 100) dedicated to MAVEN only Staff traffic control (only needed personnel were granted access) by closing of the area with dividing-walls Storage in a vacuum container with pressure <10 -1 mBar (7.5·10 -3 Torr) Installation of a clean-room tent over the test bench 3
4
Dec. 01-02, 2011 SWEA PSR What has been done for Planetary Protection (1/3) Use of sterile garments (suit, hood, facemask and ESD gloves) Use of sterile hydro-alcoholic solution for cleaning hands Cleaning of surfaces using pre-wetted sterile wipers (TX3217) and disinfectant spray Bacty- SP® IPA (70% concentration) Note: this was also performed by the company subcontracted for soldering the EEE components on the boards. 4
5
Dec. 01-02, 2011 SWEA PSR What has been done for Planetary Protection (2/3) Assay of work area (use of Petri dishes) Performing DHMR on all 3 boards (with components) : 110°C for 72 hours (62.5 hours required) at 10 -2 mbar (7.5·10 -3 Torr) Training any transfer out of the contamination-controlled area Performing UV decontamination 5 Working surface (ISO5 cabinet)0 CFU/100 cm² Vertical window (ISO5 cabinet)0 CFU/100 cm² Shelf in vacuum container0 CFU/100 cm²
6
Dec. 01-02, 2011 SWEA PSR Future work: (1/3) Performing final particular contamination inspection Control up to VC-HS, as per SSL Contamination Control Plan (ref MAVEN_PF_QA_012). Note: Complementary inspection with UV light source should be performed. 6 Note for VC-HS : Incident light level ≥ 100 foot candles Observation distance from 6 to 18 inches. Remarks: –Exposed and accessible surfaces only. –Initial cleaning is mandatory. –Cleaning is required if the surface in question does not meet VC under the specified incident light and observation distance conditions.
7
Dec. 01-02, 2011 SWEA PSR Future work: (2/3) Performing PP assays Have 2 biological assays performed just prior close-out; one being representative of the box and the other of the PWB, as per SSL Planetary Protection Implementation Plan (ref. MAVEN_PF_QA_015) 7
8
Dec. 01-02, 2011 SWEA PSR Future work: (3/3) Transportation to SSL Container: antistatic polycarbonate Bagging: sealed / clean / sterilized by UV decontamination / 2 layers approved material / purged 8