San Francisco-Oakland Bay Bridge West Approach Seismic Retrofit Project
3
I-80 in San Francisco (5th St. to SFOBB West Anchorage) Project Limits I-80 Project Limits
4
Stage Construction Fremont St. First St. Essex St. Second St. Third St. Fifth St. Fourth St. Harrison St. Howard St. Folsom St. Beale St. Stage 1 18 Months Stage 2 10 Months0 Stage 4 10 Months Stage 5 12 Months Stage 6 6 Months Stage 3 10 Months Year 1 Year 2Year 3Year 4Year 5Year 6
5
Bridge Removal Sound Control Requirements Maintaining Traffic Order of Work Areas for Contractor’s Use Challenging Aspects of the Project
6
Water Pollution Control Measures
7
Erosion Control
8
Traffic Control/Striping
9
(continued)
10
Fencing
11
Bridge Removal
12
Piling
13
Steel Casings
14
Coring & Joint Seal Assembly
15
(continued)
16
Steel
17
Drainage
18
Electrical