Presentation is loading. Please wait.

Presentation is loading. Please wait.

MAVEN CDR May 23-25, 2011 Particles and Fields Package Critical Design Review May 23 -25, 2011 Introduction Dave Curtis PFP Package Manager Mars Atmosphere.

Similar presentations


Presentation on theme: "MAVEN CDR May 23-25, 2011 Particles and Fields Package Critical Design Review May 23 -25, 2011 Introduction Dave Curtis PFP Package Manager Mars Atmosphere."— Presentation transcript:

1 MAVEN CDR May 23-25, 2011 Particles and Fields Package Critical Design Review May 23 -25, 2011 Introduction Dave Curtis PFP Package Manager Mars Atmosphere and Volatile EvolutioN (MAVEN) Mission

2 0-2 MAVEN PFP ICDR May 23-25, 2011 Agenda Day 1, Monday May 23 StartDurationWhoContent 8:00 AM0:15Lin, ChairIntroduction & Logistics 8:15 AM0:30Mitchell/LinPFP Science Overview, Driving PFP Science Requirements 8:45 AM1:00CurtisProject Management, Schedule 9:45 AM2:00CurtisSystem Engineering, Reliability 11:45 AM0:15Working Lunch (pick up food) 12:00 AM1:30ConnerneyMAG 1:30 PM2:00LarsonSEP 3:30 PM0:15 BREAK 3:45 PM2:15ErgunLPW / EUV 6:00 PM END

3 0-3 MAVEN PFP ICDR May 23-25, 2011 Agenda Day 2, Tuesday May 24 StartDurationWhoContent 8:00 AM0:30 Day 1 Summary 8:30 AM2:00HalekasSWIA 10:30 AM2:00McFaddenSTATIC 12:30 PM0:15 Working Lunch (pick up food) 12:45 PM1:30MitchellSWEA 2:15 PM2:00GordonPFDPU 4:15 PM0:15 BREAK 4:30 PM1:30HarveyFlight Software 6:00 PM END

4 0-4 MAVEN PFP ICDR May 23-25, 2011 Agenda Day 3, Wednesday May 25 StartDurationWhoContent 8:00 AM0:30 Day 2 Summary 8:30 AM1:15SmithThermal 9:45 AM0:45QuinnGSE 10:30 AM1:00FischerSMA, Parts 11:30 AM1:30CurtisI&T, Qualification 1:00 PM0:15 Working Lunch (pick up food) 1:15 PM0:45MitchellOperations 2:00 PM0:30 Caucus 2:30 PM0:30 CDR Summary 3:00 PM END

5 0-5 MAVEN PFP ICDR May 23-25, 2011 Logistics Parking Lunch arrangements Rest rooms Introductions CDR board comments

6 0-6 MAVEN PFP ICDR May 23-25, 2011 Remote Access via WebEx PFP ICDR Day 1 –Meeting Number: 806 682 460 –https://maven.webex.com/maven/j.php?ED=152150747&UID=0&PW=N YzM3MzQxNDYy&RT=MiM0https://maven.webex.com/maven/j.php?ED=152150747&UID=0&PW=N YzM3MzQxNDYy&RT=MiM0 PFP ICDR Day 2 –Meeting Number: 802 646 675 –https://maven.webex.com/maven/j.php?ED=152151262&UID=0&PW=N M2Q5OTk3NTAz&RT=MiM0https://maven.webex.com/maven/j.php?ED=152151262&UID=0&PW=N M2Q5OTk3NTAz&RT=MiM0 PFP ICDR Day 3 –Meeting Number: 803 819 174 –https://maven.webex.com/maven/j.php?ED=152151627&UID=0&PW=N NjE4YzFkMDI2&RT=MiM0https://maven.webex.com/maven/j.php?ED=152151627&UID=0&PW=N NjE4YzFkMDI2&RT=MiM0 Meeting Password: PFPICDR Dial in to 510-643-9226 Charts also on the web at: –ftp://apollo.ssl.berkeley.edu/pub/MAVEN/Reviews/20110523_ICDR/ftp://apollo.ssl.berkeley.edu/pub/MAVEN/Reviews/20110523_ICDR/

7 0-7 MAVEN PFP ICDR May 23-25, 2011 WiFi Access at SSL Select wireless network: SSL-AIR Go to any web page (HTTP, not HTTPS) –You should be redirected to SSL authorization page –Your browser may complain about a certificate – tell it to proceed Click toward the bottom to get a temporary username –register for a wireless guest account Use “boinc ” (without the quotes) as the monthly secret word Fill in the form with your name etcetera For SSL host/sponsor’s e-mail, use –“dwc@ssl.berkeley.edu” Remember the random username and password provided for your use tomorrow


Download ppt "MAVEN CDR May 23-25, 2011 Particles and Fields Package Critical Design Review May 23 -25, 2011 Introduction Dave Curtis PFP Package Manager Mars Atmosphere."

Similar presentations


Ads by Google