1
CFS / Global – 04 Aug, 2010 PM Report: SB2009: –ADI meeting 23.07: Parameter tables with low energy / low power operation –BA Workshop Planning CFS participation relatively small –http://ilcagenda.linearcollider.org/conferenceOther Views.py?view=standard&confId=4593 CFS/GBL 04 Aug, 2010 Marc Ross, Fermilab 1
2
Reviews: AAP –Eckhard Elsen will help open the BAW at KEK –Will review the BA Workshop written summary shortly after the meeting –(PM / AAP meeting) PAC: next in November CFS/GBL 04 Aug, 2010 Marc Ross, Fermilab 2
3
IWLC 2010 Joint Plenary sessions: Monday PM, Tuesday AM, Friday PM –Monday afternoon: CERN Directorate, Physics, GDE, Detectors –Tuesday AM: ‘Performance / Scope Joint session – GDE/PD/CLIC’ ? –Friday: summaries and wrap – up GDE/CLIC Plenary: Tuesday PM, Friday AM –Critical RD Reports (FLASH, CESR, ATF, CTF, SRF,…) Parallel: Just Wednesday and Thursday –(roughly ½ day less than we are accustomed to) CFS/GBL 04 Aug, 2010 Marc Ross, Fermilab 3
4
IWLC 2010 draft schedule CFS/GBL 04 Aug, 2010 Marc Ross, Fermilab 4
5
IWLC10 Working Groups 1)Sources: L. Rinolfi*, A. Variola, J Clarke, T. Omori 2)Damping rings, ATF and CESR-TA: Y. Papaphilippou*, M. Palmer, S. Guiducci, J. Urakawa 3)Main linac and superconducting RF Hitoshi Hayano, Carlo Pagani, Christopher Nantista 4)Main linac and normal conducting RF W. Wuensch, T. Higo, Ch. Adolphsen 5)Interaction region, ATF2 and MDI R. Tomas*, L. Gatignon, A Seryi, D. Angal-Kalinin 6)Drive beam complex and CTF3 J.-B. Jeanneret, C. Biscari 7)Low emittance transport and integrated simulations K. Kubo, D. Schulte, N. Solyak, F. Stulle* 8)Technical systems, instrumentation, pre-alignment and stabilisation H. Schmickler*, G. Blair 9)Civil engineering and scheduling J. Osborne*, V. Kuchler, A. Enomoto CFS/GBL 04 Aug, 2010 Marc Ross, Fermilab 5
6
Wednesday ‘Technical Area’ Webex meetings, 08-12.2010 6 To be used to prepare for Baseline Workshops – as needed CFS/GBL 04 Aug, 2010 Marc Ross, Fermilab
7
Preparation for the 1 st BAW July 23: AD&I meeting July 28: SCRF meeting and draft BAW report to be distributed –delayed Aug. 25: SCRF meeting and the final report (prior to the 1 st BAW) to be distributed August 28: AD&I meeting CFS/GBL 04 Aug, 2010Marc Ross, Fermilab7
8
Baseline Assessment Workshop CFS/GBL 04 Aug, 2010 Marc Ross, Fermilab 8 At the close of each BAW, we would like to write down a summary that is based on our common understanding of the issues. Developed prior to (and at ) the meeting itself A set of questions to be answered –Also serves as a draft outline for the summary document The summary is the ‘Workshop Report’ – –to be submitted as part of ‘Top Level Change Control’
9
Workshop Report The ‘Baseline Assessment’ is an advocacy process –A problem solving and integration process –We intend to develop a positive recommendation –For BAW 1, this means: Answering in the positive sense review panel (and other) comments on single tunnel / HLRF and gradient Preparation – SLAC 03.08, KEK 25-27.08 CFS/GBL 04 Aug, 2010 Marc Ross, Fermilab 9
10
2 nd BAW proposal (SLAC) January 18 2011: Reduced RF, focusing on parameters, running scenarios and development plans January 19: Reduced RF focusing on cost and performance projections and potential upgrade paths and summary/recommendation, January 20: Positron Source Location, focusing on running scenarios and technical issues January 21: Positron Source Location, focusing on cost and performance projections and summary/recommendation. 7/23/2010 10 AD & I 23.07 (M. Ross)
11
Discussion expected at SLAC - BAW 1. Reduced RF Global Parameters Pulse length, n_b, power and cryogenic consumption AS impact – sources, damping rings and BDS Upgrade paths R & D strategies Cost impact – key cost items Performance impact – luminosity performance and impact on physics 2. Positron Source Location Running Scenarios – key aspects and luminosity as a function of energy Technical parameters – operational issues as a function of energy Variable repetition rate issues – power and cryogenic consumption; sources and damping ring performance Cost impact – key cost items Performance impact – luminosity performance and impact on physics 7/23/2010 11 AD & I 23.07 (M. Ross)
12
TDP-2 R&D Plan Release 5 submitted to EC 04.08; –hope for ~ immediate release Updated R&D Plan for TDP2 reviewed by EC – Paris mid July Please read the CFS and S2 sections carefully R & D Plan appears to be ‘well-read’ CFS/GBL 04 Aug, 2010 12 Marc Ross, Fermilab
13
2010/2011 – Schedule CFS 2: 2-3 Aug. SLAC – just completed First Baseline Workshop: 7-10 Sept. KEK (Linac 2010: 13-17 Sept. Tsukuba) LOwLBT (FLASH): - postponed 02.2011 (?) ECloud ’10: 8-12 Oct. Ithaca IWLC 2010: 18-22 Oct. Geneva ILC PAC: 11-12 Nov. Eugene Second Baseline Workshop: 18-21 Jan. 2011 SLAC ALCPG011: 21-25 March 2011 Eugene CFS/GBL 04 Aug, 2010 Marc Ross, Fermilab 13