Download presentation
Presentation is loading. Please wait.
Published byGertrude O’Neal’ Modified over 9 years ago
1
Murrieta Creek Flood Control, Environmental Restoration and Recreation Project 2006 Fall Project Tour with Congresswoman Mary Bono Group Photo – Left to Right Linda Valter, David Stahovich, Lori Moss, Zully Smith, Rick Gibbs, Kelly Seyarto, Colonel Alex Dornstauder, Congresswoman Mary Bono, Dusty Williams, Brain Moore, David Van Dorpe, Paul Christman
2
Murrieta Creek Flood Control, Environmental Restoration and Recreation Project Project Tour – October 20, 2006 List of Attendees U.S. House of Representatives Congresswoman Mary Bono Linda Valter, Legislative Director U.S. Army Corps of Engineers Colonel Alex Dornstauder, Los Angeles District Engineer Brian Moore, Deputy District Engineer David Van Dorpe, Project Manager Kevin Thomas, Project Field Engineer Riverside County Flood Control and Water Conservation District Dusty Williams, General Manager-Chief Engineer Zully Smith, Federal Project Coordinator Riverside County Board of Supervisors David Stahovich, Chief of Staff to Supervisor Bob Buster City of Murrieta Kelly Seyarto, Mayor Lori Moss, City Manager Rick Gibbs, Councilmember Paul Christman, Fire Chief City of Temecula Maryann Edwards, Councilmember Bill Hughes, Director of Public Works
3
Murrieta Creek Flood Control Environmental Restoration and Recreation Project Project tour with Congresswoman Mary Bono October 20, 2006 9:00 amPhase ITemecula Community Center 28816 Pujol Street Temecula, CA 9:20 amPhase IIMain Street Bridge (Drive by/over) 9:30 amPhase IIIThe Basin (Cherry & Adams) 9:40 am Phase IVElm Street (Across from the Sewage Treatment Plant) 9:50 amPhase IVWashington Street Bridge 10:00 amPhase IVIvy Street (Future Bridge location) 10:10 amPhase IVTenaja Bridge (Upstream Terminus) 10:30 am Return to the Temecula Community Center
4
Congresswoman Bono, Col. Dornstauder and Brian Moore from the Corps
5
Dusty Williams welcomes the Congresswoman and Linda Valter to Phase 1
6
Dusty summaries the features of the project
7
Kevin Thomas, Corps’ Field Engineer, explains the repairs to Phase 1
8
A visit to Phase IV Upstream of the Basin
9
Phase IV – Upstream of the Basin and across the Sewage Treatment Plant
10
Mayor Seyarto explains the new construction at Vineyard Parkway Bridge (Tenaja Road) – the upstream terminus of the project
11
Construction of Vineyard Parkway (Tenaja Bridge)
12
The Congresswoman offers her continued support for the project
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.