DOM Electronic Reliability Progress Report S.Colonges 09/04/2014
2
Progress Report Board analyzed: BoardFIT analysisDerating analysis FMECARemarks CLB V2Fides 2004 / Fides 2009 No (TBD)Organization?Cerramic capacitors Octopus (large)Fides 2009Yes (without connectors…) Organization?Connectors Octopus (small)Fides 2009IdemOrganization?Connectors BaseFides 2009YesOrganization?Capacitors ASICS Power BoardFides 2009No (TBD)Organization?Derating problems. Mechanical problems
3
Octopus small Board PCA9548 higher FIT Temperature elevation TBC Failure risk (15 years) F(t) = 1 – e - t 6,4% Connectors: -Screw lock small connectors -Mechanical connector reliability -Mechanical weakness point on Molex edge
4
Octopus large Board -PCA9548 higher FIT Temperature elevation TBC Failure risk (15 years) F(t) = 1 – e - t 6,4% Connectors: -Screw lock small connectors -Mechanical connector reliability -Mechanical weakness point on Molex edge
5
Base Failure risk (15 years) F(t) = 1 – e - t 26% -Capacitors change rating (case) for higher contributors ? (case 1206 /100 nF higher contributor) -Degraded modes number of PMT fails allowed / DOM? - ASIC ESS TBC
6
Power Board Failure risk (15 years) F(t) = 1 – e - t 75,7% -Derating A lot of capacitors overrated! Change design new derating analysis -CEM analysis? (inductors shielding?) -Mechanical weakness for DC/DC converters modules
7
CLB V2 Failure risk (15 years) F(t) = 1 – e - t 26,9% -Derating capacitors (22µF, 100µF and 4,7µF) Change design? new derating analysis Connectors mechanical weakness point
8
Global results -Failure probability (15 years) for the whole DOM 88,4% with PBV2 52,7% without PBV2
9
Results update Accelerating parameters: Process, application, ruggedizing Derating analysis update FMECA degraded modes? (failure effects) / FDIR Reports
10
Open questions Stress screening / ESS Connectors integration procedure / vibrating qualification? Fixing? Prototypes tests reports