Download presentation
Presentation is loading. Please wait.
Published byFranklin Eaton Modified over 9 years ago
1
PACS SVR38/9 Nov 2007 System Testing1 Tests on Satellite Level H. Feuchtgruber
2
PACS SVR38/9 Nov 2007 System Testing2
3
PACS SVR38/9 Nov 2007 System Testing3 Layout of Integration Facility at EADS Astrium GmbH Friedrichshafen CCS
4
PACS SVR38/9 Nov 2007 System Testing4 Instrument EGSE Room during IST@ASED HIFISPIRE PACS S2K QLA CUS Remote Control for Air-conditioning Portable Phone
5
PACS SVR38/9 Nov 2007 System Testing5 Schedule
6
PACS SVR38/9 Nov 2007 System Testing6 System Test Elements (1) SFT warm (1 st run on 19-Oct) (PACS-ME-TP-017)1-2x SFT HeI & HeII (PACS-ME-TP-017)5-7x IST program incl. RMS (PACS-ME-TP-021) TB/TV Tests (PACS-ME-TP-021) X
7
PACS SVR38/9 Nov 2007 System Testing7 System Test Elements (2) SVT-1 System Validation Test (PT-HMOC-OPS-PL-6204-OPS-OAH): “The purpose of the System Validation Tests is to test and validate the external interfaces from the MOC to the satellite, in closed loop, and to validate the satellite TM and TC database definition. The contents of the SVTs are designed to test these interfaces and the database with an increasing level of realism and complexity from one SVT to the next, making use of the satellite nominal and contingency flight operations procedures in the performance of the tests. Replacement or additional SVT specific procedures may also be required.” consists for PACS at present of all manual procedures from the IUM, however it is unlikely that the “to-be-translated” mechanism and SFT procedures can make it into SVT-1 (is expected to be run be run at HeI, will require ICC participation)
8
PACS SVR38/9 Nov 2007 System Testing8 System Test Elements (3) EMC Tests (PACS-ME-TP-032) SOVT-1 System Operational Validation Test (PT-CMOC-OPS-PL-6212-OPS- OAH, draft 0.1) : This will be a spacecraft End-to-End test of routine operations. It will involve the entire PACS ICC. Observations will be similar as for RMS test, but extended by selected AORs (RV & BA). Requires ICC@MOC and ICC@MPE. MTL-ODValidityUpload DTCPContents MTL-0D1/06:00 - D1/18:00 DTCP-0 (D1/06:00) Leading to DTCP-1 MTL-1D1/18:00 - D2/18:00 DTCP-1 (D1/12:00) PACS photometer (50%) and spectrometer (50%) MTL-2D2/18:00 - D3/18:00 DTCP-1 (D1/12:00) HIFI operations MTL-3D3/18:00 - D4/18:00 DTCP-2 (D2/12:00) SPIRE/ PACS scenarios (PACS photometer, SPIRE photometer, parallel mode) MTL-4D4/18:00 - D5/18:00 DTCP-3 (D3/12:00) SPIRE/ PACS scenarios (PACS photometer, SPIRE photometer, parallel mode)
9
PACS SVR38/9 Nov 2007 System Testing9 System Test Elements (4) SVT-2 will be similar to SVT-1, but with lessons learnt, possible extensions and/or new procedures: Emphasis on “Extended Instrument Interface Validation and Extended Database Validation” SOVT-2 will include eventually also more non-routine operations and eventually also more delivery processes. Launch Campaign content and PACS contribution TBD (i.e. just SFT like or more IST like ?)
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.