Purpose 1 28.01.2015 NEW BEAM DUMP TUNNEL Launch Safety Agreement - conventional aspects LIU-SPS external beam dump meeting - C. Colloca DGS/SEE LSA conventional.

Similar presentations


Presentation on theme: "Purpose 1 28.01.2015 NEW BEAM DUMP TUNNEL Launch Safety Agreement - conventional aspects LIU-SPS external beam dump meeting - C. Colloca DGS/SEE LSA conventional."— Presentation transcript:

1 Purpose 1 28.01.2015 NEW BEAM DUMP TUNNEL Launch Safety Agreement - conventional aspects LIU-SPS external beam dump meeting - C. Colloca DGS/SEE LSA conventional aspects EDMS 1469391

2 Introduction 2 28.01.2015 Description of the Project Information provided by the Project Leader/PSO/EXSO LIU-SPS external beam dump meeting - C. Colloca DGS/SEE NEW BEAM DUMP TUNNEL Launch Safety Agreement - conventional aspects

3 3 28.01.2015 Description of the Project LIU-SPS external beam dump meeting - C. Colloca DGS/SEE Schedule and organization NEW BEAM DUMP TUNNEL Launch Safety Agreement - conventional aspects

4 Safety domains identification 4 28.01.2015 LIU-SPS external beam dump meeting - C. Colloca DGS/SEE NEW BEAM DUMP TUNNEL Launch Safety Agreement - conventional aspects

5 Safety (conventional) Clearance 5 28.01.2015 LIU-SPS external beam dump meeting - C. Colloca DGS/SEE Safety requirements & Safety documentation contents per domain NEW BEAM DUMP TUNNEL Launch Safety Agreement - conventional aspects

6 6 28.01.2015 LIU-SPS external beam dump meeting - C. Colloca DGS/SEE Safety requirements Safety documentation (part of Safety file/folder) contents NEW BEAM DUMP TUNNEL Launch Safety Agreement - conventional aspects

7 28.01.2015 LIU-SPS external beam dump meeting - C. Colloca DGS/SEE 7 NEW BEAM DUMP TUNNEL Launch Safety Agreement - conventional aspects Fire protection requirements (ch. 6.12) 1/3 The project shall comply with the following CERN Safety rules: CERN Safety Code E - Fire protection. The following Swiss legislation applies, if not differently stated in CERN Safety Code E: Swiss Directives on Fire prevention, AEAI For fire prevention requirements on material, cables, etc. please refer to ch. 6.2 and ch. 6.11. A fire detection system has to be foreseen (contact GS/ASE). Its design, installation, commissioning, disabling, maintenance, and periodical inspections have to be done according to the Safety Instruction IS 37 - Alarms and alarm systems.IS 37

8 28.01.2015 LIU-SPS external beam dump meeting - C. Colloca DGS/SEE 8 NEW BEAM DUMP TUNNEL Launch Safety Agreement - conventional aspects Fire protection requirements (ch. 6.12) 2/3 6.12.1Fire compartments A fire compartmentalization shall be implemented. Typically, the volume of fire compartments should be as small as possible. However, taking into account the low value of fire load density (except for the dump cavern and in the alcove) and the low occupation in the different areas (for maintenance and only during shutdown phases), 4 fire-rated separations equipped with fire doors shall be installed in order to create 3 fire compartments. A separation is to be foreseen between the ECX5 and the connection tunnel, a second separation at the junction cavern, a third one upstream the zone “dump cavern + evacuation tunnel” to the SPS and a last one in the evacuation tunnel that separates the dump tunnel from the SPS. In this way, new compartments “connection tunnel”, “dump tunnel” and “alcove + dump cavern” are created.

9 28.01.2015 LIU-SPS external beam dump meeting - C. Colloca DGS/SEE 9 NEW BEAM DUMP TUNNEL Launch Safety Agreement - conventional aspects Fire protection requirements (ch. 6.12) 3/3 6.12.2Evacuation Evacuation of occupants in case of emergency will be via a tunnel (escape tunnel) connecting the dump tunnel to the SPS. Ideally, from the point of view of fire safety, the tunnel should be at a maximum of 10 m from the exit of the dump cavern, while respecting the constraints of the machine to the outlet in the SPS. To allow for safe evacuation, bridges will be provided where necessary for occupants to move beyond or below the beam pipe.


Download ppt "Purpose 1 28.01.2015 NEW BEAM DUMP TUNNEL Launch Safety Agreement - conventional aspects LIU-SPS external beam dump meeting - C. Colloca DGS/SEE LSA conventional."